Search NASA⌕ Search

SEARCH · Search NASA

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING↗

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2023

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The focus of GTA has been to test larger radial spur gears sets machined from Inconel 718 along with a variety of bearing components that are to be used in the fuel handling machines built for use in pool-type sodium fast reactors. The testing in GTA also informs the design and material choices for the full-scale Gripper Test Assembly (GrTA) being developed by Argonne. To date, the Inconel 718 gears used in all six GTA experimental campaigns have completed over 23.2 million revolutions under various loads equivalent to approximately 37,156 simulated fuel assembly maneuvers (removal from and reinsertion to core) using a conventional height of a core assembly. While the heat treated and untreated tapered roller bearings and cylindrical pin thrust bearings used in the first five experimental campaigns have experienced mechanical or material failure after completing a range of fuel assembly maneuvers ranging from as early as 575 operations in Campaign #5 to 9800 operations in Campaign #1, Campaign #6 was the most successful campaign, achieving 22,563 maneuvers and was concluded before any catastrophic failure occurred. In this report we will present the results from the most recent campaigns, #5 and #6. The longevity of Campaign #6 was likely aided by a variety of adjustments made to the materials and components used and to the experimental testing procedures employed. In terms of materials and components, new gearboxes were fabricated, as opposed to using the old gear boxes which had been impacted by the previous bearing failures, and ball bearings were replaced with tapered roller bearings. The adjustments to the experimental procedure focused on a lowering of the maximum torque applied to the gears and bearings and the increase of the duration of each simulated fuel assembly maneuver conducted. This report will present and discuss the changes made to the materials, components, and procedures and the subsequent results for Campaign #5 and Campaign #6.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Gear Test Assembly – Experimental Testing and Analysis of Gears and Bearings – FY2024

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The focus of GTA has been to test larger radial spur gear sets machined from Inconel 718 along with a variety of bearing components that are to be used in the fuel handling machines built for use in pool-type sodium fast reactors. The testing in GTA also informs the design and material choices for the full-scale Gripper Test Assembly (GrTA) being developed by Argonne.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Gear Test Assembly - Experimental Testing and Gear Analysis - FY2022

The Gear Test Assembly (GTA) is an experimental test article built for use in the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The GTA was the first test article to operate in METL, with the initial experimental campaign beginning in early 2019. A total of four experimental campaigns have been completed to-date, and the fifth is currently underway. This report will discuss the results of the four completed campaigns with gear analysis in the form of over-pin dimensions. Finally, information regarding Experimental Campaign #5 will be discussed. All over-pin measurements of the gears tested in sodium will be available in the Appendix.

42 ENGINEERING↗

Gear Test Assembly – Experimental Testing and Gear Analysis (FY2021 Year End Report)

The Gear Test Assembly (GTA) is an experimental apparatus designed to test mechanical components used in fuel handling systems of liquid-sodium cooled fast-spectrum nuclear reactors. The performance and lifetime of gears, bearings, and dynamic seals are the primary focus of study. Three experimental campaigns have been completed since the start of operation in 2019, and the GTA is currently assembled and ready to begin the fourth experimental campaign. Sodium operations at the Mechanisms Engineering Test Loop (METL) have been paused while repairs are made to the Building 308 Alkali Metal Scrubber. This work is nearly complete, and once METL is brought back into operation the GTA will begin sodium testing immediately.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cataloging Legacy Data from the Tritium Systems Test Assembly Program

The Tritium Systems Test Assembly (TSTA) at Los Alamos National Laboratory, operational from 1984 to 2001, was critical in advancing fusion fuel cycle technologies, including tritium storage, gas separation, and pumping. TSTA’s contributions, particularly in safe tritium operations, have influenced subsequent fusion projects. This paper discusses the ongoing effort to digitize and catalog TSTA’s historical data to create a searchable resource for the fusion research community. While the long-term objective is to develop a relational database for structured data management, the project remains in the early phase, with current efforts focused on scanning and indexing physical documents. Initial plans for database implementations are also presented, outlining key considerations for structure, query indexing, and standardization. As digitization progresses, future discussions will refine these implantation details to ensure an efficient and comprehensive system. This initiative aims to preserve critical legacy data, enhance the design of tritium system facilities, and support the next generation of fusion energy research.

42 ENGINEERING↗

Gripper Test Assembly Status of Fabrication and Assembly Report – FY2023

The Gripper Test Assembly (GrTA) is an experimental test article designed for use at the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The GrTA will test mechanical components intended for use in compact in-vessel fuel handling machines (FHM) for sodium cooled fast reactors (SFR). The GrTA will test radial and thrust ball bearings, radial and thrust roller bearings, ball screws and nuts, spline shafts and ball nuts, radial spur gears, and universal joints submerged in liquid sodium at high temperatures (250°C-650°C). These components will be tested in a prototypic, full-scale gripper head and under prototypic SFR fuel handling loads. The design of the GrTA was completed in FY2022 and has progressed into fabrication and initial assembly. All custom manufactured components have been fabricated and delivered to ANL following inspection. All custom gears have been fabricated and delivered to ANL. Bearings, ball screws, and spline shafts have been purchased to allow for initial assembly in air, and sodium compatible versions have either been purchased or are in design at appropriate manufacturers. The drive motor systems that operate the various functions of the GrTA have been purchased and delivered to ANL. Instrumentation and control hardware has been purchased and delivered to ANL as well. All sodium facing components of the GrTA have been assembled and show proper fit. The three main functions of the GrTA are to raise or lower a gripper head under prototypic fuel handling loads, rotate the gripper head while carrying a fuel handling load, and extend or retract gripper jaws that lock a fuel assembly to the gripper head. All three functions have been demonstrated in air, while under no load. The GrTA project will move forward next fiscal year by completing the initial assembly, incorporating the drive system and I&C, and preparing the assembly for introduction to sodium.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Concept Descriptions for the VTR Rabbit System and Driver Fuel Test Assemblies

Two of the experiment vehicles being developed for the Versatile Test Reactor (VTR) are presented here. The first is a rabbit system that will enable rapid insertion of small test capsules into the high fast flux of the VTR core for relatively short durations. The rabbit concept development includes the construction/demonstration of a near-full-scale system in a deep-water pool to demonstrate functionality, development of a concept of operations and initial procedures, and validation of thermal-hydraulic modeling. In addition, modeling efforts are underway to simulate the thermal and neutronic environment of a rabbit capsule. The second type of experiment vehicle presented here is a driver fuel test assembly for inserting fuel and materials tests into the core by replacing a driver fuel assembly. Here, a novel design for dismountable test assemblies is proposed for the VTR.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOESC Closure Leak Test Assembly

This conceptual design report is for the DOESC Closure Leak Test Assembly, which satisfies a portion of the milestone "Preliminary Design Report for Remote Helium Leak Test System". This CDR is part of the Preliminary Design Report/Package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shock test assembly

An assembly for shock testing a specimen, the assembly including first and second opposing brackets and opposing lower and upper caps. The opposing brackets include lower and upper angled surfaces. The lower cap includes lower angled surfaces configured to engage the lower angled surfaces of the left and right brackets. The upper cap includes upper angled surfaces configured to engage the upper angled surfaces of the left and right brackets. The first and second brackets are configured to be drawn toward each other via fasteners, thereby wedging the lower and upper caps toward each other against the specimen.

Busenitz, Clark↗

Shock test assembly

An assembly for shock testing a specimen, the assembly including first and second opposing brackets and opposing lower and upper caps. The opposing brackets include lower and upper angled surfaces. The lower cap includes lower angled surfaces configured to engage the lower angled surfaces of the left and right brackets. The upper cap includes upper angled surfaces configured to engage the upper angled surfaces of the left and right brackets. The first and second brackets are configured to be drawn toward each other via fasteners, thereby wedging the lower and upper caps toward each other against the specimen.

Busenitz, Clark↗

IER 516: Zirconium Test Assembly CED Phase-1: Preliminary Experiment Design

IER-516, Zirconium Test Assembly (ZTA), is a campaign to design, execute, and document a series of high-fidelity critical benchmark experiments to validate current and future zirconium (Zr) and zirconium hydride (ZrH x ) nuclear data evaluations. ZTA is a collaborative project between Los Alamos National Laboratory and the French Autoritè de Sûretè Nuclèaire et de Radioprotection. The experiments will be fueled with highly enriched uranium (HEU), and utilize the Comet critical assembly machine at the National Criticality Experiments Research Center. A total of ten preliminary critical experiments were designed and optimized for Zr and ZrHx nuclear data sensitivities using the MCNP-Particle Swarm Optimization methodology in the thermal, epithermal, intermediate, and fast neutron energy regions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of SNF, most of which are located at the INL site. “Road-ready dry storage” is a management concept where SNF is packaged into dry, sealed canisters, which are then placed in on-site storage in anticipation of later removal. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE SNF for road-ready dry storage. In support of establishing a large-scale road-ready dry storage program at the INL site, the demonstration will package a select amount of DOE-managed SNF into DOE Standard Canisters. The closure process for the DOE Standard Canisters will include fuel and basket loading, welding, inspection, leak testing, and if needed, repair. As a follow-up to previous discussion on the design of the DOE Closure Leak Test Assembly, this report describes recent fabrication and testing efforts performed at INL. DOE Standard Canisters are sealed by two sequential gas tungsten arc welds. Both are performed by remotely operated and semi-autonomous welding systems. The first weld is a circumferential pipe weld that completes assembly of the canister body and lid assembly. The second and final closure weld connects the vent plug to the vent port with an identical butt joint to the circumferential pipe weld. After the second weld is performed on the vent port, these welds are helium leak tested using an inside-out technique. In addition to the commercially available vacuum and leak detector systems, the DOE Standard Canister Closure Leak Test Assembly was designed for both remote and manual operation. This report describes fabrication and performance testing associated with the inside-out technique. INL staff designed and tested systems to accomplish these tasks. Hardware fabrication occurred at INL facilities. Forthcoming work includes design optimization, integration to existing systems, and implementation to packaging demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOESC Closure Leak Test Assembly

This is the functional and operational requirements document (FOR) for the DOESC Closure Leak Test Assembly ("Bell Jar"), as required per LWP-10000.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Full Length Assembly Testing in PELICAN (Final Report)

In support of the development of the U.S. Department of Energy (DOE) Versatile Test Reactor (VTR), a thermal hydraulics test facility was constructed to generate experimental measurement of the pressure drop across a single full-scale assembly containing prototypic axial reflectors, fuel, and plena components. Constructed and operated at Argonne National Laboratory, the Pressure drop Experimental Loop for Investigations of Core Assemblies in Nuclear reactors (PELICAN) facility was designed to achieve hydraulic conditions identical to those anticipated for a full-scale fuel assembly located in the VTR core in the region with the highest flow rate. Using water as surrogate for liquid sodium, the flow loop was operated at elevated temperatures and pressures to match the thermophysical properties of liquid sodium and ensure matching Reynolds and Euler numbers. The measurement objectives for data generated from this test facility was driven primarily by the validation needs for code calculations and simulations of the reference VTR core. These objectives focused on the need to validate pressure drop results across the various segments of the fuel assembly as they relate directly to the pumping power and safety of the reactor. Presented in this report are experimental results and analytical comparisons based on testing of a full-length assembly in PELICAN. Housed within a hexagonal test section extending 3.4 m in length, the tested assembly features a prototypic lower reflector, grid plates, wire-wrapped rod bundle, upper reflector, and exit region. The rod bundle extends over 1.5 m in length and contains 217 individual wire-wrapped rods with dimensions that best reflect the reference VTR design. The as-tested bundle assembly was fabricated using 316 stainless steel 0.25-inch (6.35-mm) diameter rods wrapped with 0.04-inch (1.016-mm) diameter wire at a helical pitch of 10.51 inch (26.6 cm). Details of the method for in-house wire-wrapping, assembly, and installation are provided later in this report. Experimental measurements of pressure drop at 19 positions along the test assembly were recorded for a range of flow conditions, with special attention paid to key locations within the assembly, including component inlet and outlet, transition, and wire-wrapped rod bundle regions. Testing conditions were based on 110°C water with flow rates ranging from 50 to 450 GPM (3 to 27 kg/s) at the inlet of the test assembly generating Reynolds numbers and velocities up to ~8.0×10 4 and ~7.8 m/s, respectively, within the rod bundle region. Non-dimensional values for the friction factor were then calculated based on these experimental measurements and compared against those predicted by various analytical correlations available from open literature. Predictions by the upgraded Cheng and Todreas, Rehme, and Novendstern correlations fell within 4% to those values measured experimentally.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗