Search NASA⌕ Search

SEARCH · Search NASA

Results for “test system test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Nodal Capacity Expansion Modeling with ReEDS: A Case Study of the RTS-GMLC Test System

Test systems play an important role in power systems analysis and are used extensively for a wide range of purposes like reliability analysis, production cost modeling, studying the impacts of load shifting, and many more. These test systems have continued to evolve over the years to keep pace with changing system compositions due to technology and policy changes. In this work, we apply the Regional Energy Deployment System (ReEDS) model, a large-scale capacity expansion model (CEM), on the nodal RTS-GMLC system to perform capacity expansion of the bus-level test system. This work both demonstrates that a large-scale CEM can successfully be applied to nodal systems, and that the CEM can allow a test system to be evolved to meet desired criteria. The process allowed the coupling of CEM data not available in the test system (such as capital costs) with test system data to provide plausible system evolutions in line with scenario specifications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automated Testing System

The Automated Testing System (ATS) is an open-source, Python-based tool for automating the running of tests of an application across a broad range of high performance computers.

Dempsey, StephanieM.↗

An ERCOT test system for market design studies

An open source test system is developed that permits the dynamic modeling of centrally-managed wholesale power markets operating over highvoltage transmission grids. In default mode, the test system models basic operations in the Electric Reliability Council of Texas (ERCOT): namely, centrally-managed day-ahead and real-time markets operating over successive days, with congestion handled by locational marginal pricing. These basic operational features characterize all seven U.S. energy regions organized as centrally-managed wholesale power markets. Modeled participants include dispatchable generators, load-serving entities, and non-dispatchable generation such as unrmed wind and solar power. Users can congure a broad variety of parameters to study basic market and grid features under alternative system conditions. Users can also easily extend the test system's Java/Python software classes to study modied or newly envisioned market and grid features. Finally, the test system is integrated with a high-level simulation framework that permits it to function as a software component within larger systems, such as multi-country systems or integrated transmission and distribution systems. Finally, detailed test cases with 8-bus and 200-bus transmission grids are reported to illustrate these test system capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transmission Expansion Planning Test System for AC/DC Hybrid Grid With High Variable Renewable Energy Penetration

Test systems are important tools and benchmark for power system research. Currently, there is a lack of standard test systems for modern transmission expansion planning (TEP) research, especially under high variable renewable energy (VRE) penetrations. This article describes a 38-bus test system named the HRP-38 system dedicated to TEP. “HRP” stands for high renewable penetration. The objective of establishing such a system is to provide a consistent platform for different TEP methods to be tested and compared. The test system considers high VRE penetration of more than 30% energy share, which will be an important feature in many power systems in the future. Both AC and DC candidate lines are given to provide sufficient transmission planning alternatives. The complexity of the test system is well balanced considering calculation tractability and the ability to test the performance of the TEP planning model. The network topology, generation mix and load characteristics are described in detail. Year-round time series of VRE (wind power and PV) output and load curves for each bus are provided to facilitate a detailed evaluation of the transmission grid configuration under high VRE penetration. Finally, four benchmark results with different optimization settings are provided for the HRP-38 system.

AC/DC hybrid↗

Instrumented Lid: Full Instrumentation System Testing

This report describes full system testing of an instrumentation system for the monitoring of aluminum clad spent nuclear fuel (ASNF). The requirements for this system were laid out in a previous document, with respect to former studies, and the details of project actualization were reported. The reader is directed to these references for more background information. In short, a team composed of personnel from Savannah River National Laboratory (SRNL) and Idaho National Laboratory have been tasked with the design and fabrication of an instrumented assembly for remote sampling, monitoring, and radiation testing (SMART) for demonstration and surveillance of the dry storage environment and conditions of ASNF in a DOE standardized canister. SRNL proposed the fabrication of two systems to accomplish this goal: 1) an instrumentation system consisting of gas and particle collection, temperature, humidity, pressure, and radiation monitoring; and 2) a lid assembly consisting of a custom-designed lid and hat, together with a custom fuel basket. The corresponding instrumentation system is shown in the piping and instrumentation diagram. The individual functionality tests of the instrument system sensor components were performed, and the results were reported in the report “Instrumented Lid- System Functionality Testing.” Savannah River National Laboratory, September 1, 2019.7 The sensor components of instrumentation system have been mounted and tested in-line with a 6” diameter test canister, and the results are reported in this document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A self-certifying FPGA based pixel readout chip test system for CMS ETL upgrade

A flexible self-certifying pixel readout test system for testing the Endcap Timing Read-Out Chip (ETROC) has been developed for the CMS MIP Timing Detector (MTD), part of the upgrade for the HL-LHC. The system includes an FPGA-based (Xilinx KC705) test system that can take data from an emulator or up to four ETROC boards in telescope mode. A python based DAQ system simplifies configuration, calibration, and testing of the chips. The system provides an efficient & reliable solution for testing ETROC (ETROC2 since April 2023 with 16x16 pixels, full-size, full functionality prototype) and can be extended to other readout chips with similar architecture (AIDA integration is currently being explored).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cataloging Legacy Data from the Tritium Systems Test Assembly Program

The Tritium Systems Test Assembly (TSTA) at Los Alamos National Laboratory, operational from 1984 to 2001, was critical in advancing fusion fuel cycle technologies, including tritium storage, gas separation, and pumping. TSTA’s contributions, particularly in safe tritium operations, have influenced subsequent fusion projects. This paper discusses the ongoing effort to digitize and catalog TSTA’s historical data to create a searchable resource for the fusion research community. While the long-term objective is to develop a relational database for structured data management, the project remains in the early phase, with current efforts focused on scanning and indexing physical documents. Initial plans for database implementations are also presented, outlining key considerations for structure, query indexing, and standardization. As digitization progresses, future discussions will refine these implantation details to ensure an efficient and comprehensive system. This initiative aims to preserve critical legacy data, enhance the design of tritium system facilities, and support the next generation of fusion energy research.

42 ENGINEERING↗

A Time-Series Distribution Test System Based on Real Utility Data

In this paper, we provide a time-series distribution test system. This test system is a fully observable distribution grid in Midwest U.S. with smart meters (SM) installed at all end users. Our goal is to share a real U.S. distribution grid model without modification. This grid model is comprehensive and representative since it consists of both overhead lines and underground cables, and it has standard distribution grid components such as capacitor banks, line switches, substation transformers with load tap changer and secondary distribution transformers. An important uniqueness of this grid model is it has one-year smart meter measurements at all nodes, thus bridging the gap between existing test feeders and quasi-static time-series based distribution system analysis.

Bu, Fankun↗

CMS Forward Pixel Upgrade Electronics and System Testing

This note discusses results of electronics and system testing of the CMS forward pixel (FPIX) detector upgrade for Phase 1. The FPIX detector is comprised of four stand-alone half cylinders, each of which contains frontend readout electronic boards, power regulators, cables and fibers in addition to the pixel modules. All of the components undergo rigorous testing and quality assurance before assembly into the half cylinders. Afterwards, we perform full system tests on the completely assembled half cylinders, including calibrations at final operating temperatures, characterization of the realistic readout chain, and system grounding and noise studies. The results from all these tests are discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Combined Transmission and Distribution Test System to Study High Penetration of Distributed Solar Generation

Transmission and distribution (T&D) standard test systems are currently defined separately, and are critical for researchers and engineers to test new solutions. Growing installation of energy resources in distribution and sub-transmission systems is creating higher interactions between T&D systems. This paper proposes a standard test system to study T&D interactions for high penetration of solar photovoltaic (PV) generation. The proposed test system can be used to study and propose solutions to problems such as reverse power flows and voltage control affected by PV variability. The proposed test system combines the transmission IEEE 118 bus system, with the distribution IEEE 123-node feeder. The original test systems are significantly enhanced by adding high penetration of solar PV generation with corresponding full-year minute-resolution chronological data. Conventional generation chronology is achieved by adding dispatch and unit commitment data for AC optimal power flow solutions. And chronological load data is added in both aggregated and disaggregated fashions. Sample applications of the data are provided highlighting voltage control challenges, and the proposed system is made available openly online.

Samaan, Nader A.↗

Design of Laboratory System to Recover Tritium from Zirconium Recycle and Plan to Test System

The objective of the tritium separations task is to develop a viable process to separate tritium from the zirconium recycle off-gas stream. In support of this long-term objective, the goal of the present work is to design a test system and prepare a test plan for an alternate tritium capture method suitable for, and compatible with, recycle of the reactive gas (i.e., chlorine) in the zirconium recycle process. The zirconium recycle process is under development to recover zirconium from the Zircaloy® cladding component of used nuclear fuel. Small quantities of all isotopes of hydrogen (all H) are trapped in the Zircaloy as zirconium hydride. Processing releases and converts this hydrogen to hydrogen chloride, including tritium-substitu ted hydrogen chloride, 3 HCl (a.k.a., TCl). This compound of tritium must be removed from the zirconium recycle process off-gas and sequestered to satisfy regulations governing emissions of tritium.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

An Extended IEEE 118-Bus Test System With High Renewable Penetration

This article describes a new publicly available version of the IEEE 118-bus test system, named NREL-118. The database is based on the transmission representation (buses and lines) of the IEEE 118-bus test system, with a reconfigured generation representation using three regions of the US Western Interconnection from the latest Western Electricity Coordination Council (WECC) 2024 Common Case [1]. Time-synchronous hourly load, wind, and solar time series are provided for over one year (8784 hours). The public database presented and described in this manuscript will allow researchers to model a test power system using detailed transmission, generation, load, wind, and solar data. This database includes key additional features that add to the current IEEE 118-bus test model, such as: the inclusion of 10 generation technologies with different heat rate functions, minimum stable levels and ramping rates, GHG emissions rates, regulation and contingency reserves, and hourly time series data for one full year for load, wind and solar generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Hardware-In-The-Loop Methodology to Develop Test Systems

Hardware in the Loop (HIL) testing methodologies have become widespread in industry. Typically, they focus on developing control algorithms for systems such as autonomous vehicles or aircraft. An oft overlooked aspect of product development is the design and fabrication of a test system for validating that the product meets requirements. Abstractly, a test system differs little from a control system—testers provide signals to the unit, monitor feedback, and base decisions on the results. While the time scales may differ, the functionalities are conceptually similar. Viewed in this light, it becomes natural to extend HIL approaches to tester development. By replacing a physical unit with a proxy model deployed to a real-time or pseudo real-time target, test systems can be developed in parallel with the design and fabrication of a first production unit. This saves considerable time in the life cycle from conceptual design to realized product. This manuscript demonstrates the process flow using a capacitive discharge unit as an exemplar.

42 ENGINEERING↗

Surveillance and Test System (SATS) and Plant Protection System (PPS) Images | NR, DOE, NNL

Surveillance and Test System (SATS) and Plant Protection System (PPS) Images | NR, DOE, NNL, Congress | For use on SharePoint sites and Presentations Images: Analog to Digital Converter Card, Function Select and Test Select Interlock Card, Input Isolation and Input Register Card, Multiplexer and Analog to Digital Converter Register Card, Output Register Card, Pulse Conditioner Card, Test Bus and Computer Interrupt Request Card, Test Select Output #1 Card, Test Select Output #2 Card - Old and New Photos

99 GENERAL AND MISCELLANEOUS↗