Thermal Overloading Risk Mitigation With a Semi-Analytical Probabilistic Model on Branch Current

A semi-analytical formulation is presented in this paper for the probability computation of branch current in multiphase systems. The developed formula is derived based on the linear power flow model in rectangular coordinates. The system uncertainty injections can be renewable energy resources or loads and are modeled using a Gaussian mixture model (GMM). The developed formula can be used to compute the line current violation probability as well as integrate into optimal power flow problem as chance-constraint relaxation. Here, the proposed formula is first compared with the Matlab embedded numerical integration function to show its performance. Besides, the semi-analytical formula is validated and compared with the Monte Carlo simulation method using the IEEE 123-bus system, EPRI Ckt5, and Ckt7 systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reducing the Vulnerability of Electric Power Grids to Terrorist Attacks

This report describes the development of a cascading outage analyzer that, given an initial disturbance on an electric power system, checks for thermal overloads, under-frequency and over-frequency conditions, and under-voltage conditions that would result in removal of elements from the system. The analyzer simulates the successive tripping of elements due to protective actions until a post-event steady state or a system blackout is reached.

20 FOSSIL-FUELED POWER PLANTS↗

Physics of heat pipe rewetting

This is the final report which summarizes the research accomplishments under the project entitled 'Physics of Heat Pipe Rewetting' under NASA Grant No. NAG 9-525, Basic, during the period of April 1, 1991 to January 31, 1994. The objective of the research project was to investigate both analytically and experimentally the rewetting characteristics of the heated, grooved plate. The grooved plate is to simulate the inner surface of the vapor channel in monogroove heat pipes for space station design. In such designs, the inner surface of the vapor channel is threaded with monogrooves. When the heat pipe is thermally overloaded, dryout of the monogroove surface occurs. Such a dryout surface should be promptly rewetted to prevent the failure of the heat pipe operation in the thermal radiator of the space station.

Chan, S. H.↗

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

14 SOLAR ENERGY↗

Dynamic hosting capacity analysis for distributed photovoltaic resources—Framework and case study

Distributed photovoltaic systems can cause adverse distribution system impacts, including voltage violations at customer locations and thermal overload of lines, transformers, and other equipment resulting from high current. The installed capacity at which violations first occur and above which would require system upgrades is called the hosting capacity. Current static methods for determining hosting capacity tend to either consider infrequent worst-case snapshots in time and/or capture coarse time and spatial resolution. Because the duration of violations cannot be captured with these traditional methods, the metric thresholds used in these studies conservatively use the strictest constraints given in operating standards, even though both worse voltage performance and higher overloads may be temporarily acceptable. However, assessing the full details requires accurately capturing time-dependence, voltage-regulating equipment operations, and performance of advanced controls-based mitigation techniques. In this paper, we propose a dynamic distributed photovoltaic hosting capacity methodology to address these issues by conducting power flow analysis for a full year. A key contribution is the formulation of time aware metrics to take these annual results and identify the hosting capacity. Through a case study, we show that this approach can more fully capture grid impacts of distributed photovoltaic than traditional methods and the dynamic hosting capacity was 60%–200% higher than the static hosting capacity in this case study.

14 SOLAR ENERGY↗

First feedback-controlled divertor detachment in W7-X: Experience from TDU operation and prospects for operation with actively cooled divertor

In the last experimental campaign (OP1.2b) of the stellarator Wendelstein 7-X (W7-X), boronisation as a mean for first wall conditioning was applied for the first time which led to strongly reduced impurity fluxes from plasma-facing components. Thermal detachment at the uncooled target plates of the test divertor unit (TDU) was reached at higher plasma densities and was accompanied by high recycling of neutrals at the target plate. A feedback control system was established in W7-X to actively control the gas injection (actuator) for plasma fuelling and impurity seeding [3] through the divertors. It allowed very successful stabilisation of the detached plasma condition state as well as mitigation of thermal overloads to some baffle tiles. Different routinely available diagnostic signals were used as input parameters (sensors). We describe the setup of the feedback control system, its performance and provide some example results with the main focus on the development of the control scheme which led to the detachment stabilisation over the entire longest (30 s) high-power discharge at W7-X so far. In view of the achieved very successful detachment stabilisation and the necessity to include simultaneous optimisation of the core performance in the future, the feedback control system is being upgraded for the upcoming campaign (OP2.1) in which the water cooled and hereby inherently steady-state capable divertor has been currently installed. The prospects and some experiment ideas for active detachment control are discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Self-healing, self-assembling islanded power systems using only local measurements

This SAND report collects the results from the LDRD project “SHAZAM”, which aimed to push the limits of performance for self-healing, self-assembling power systems whose sectionalizing and load-control agents rely on local measurements only (i.e., only what they can measure at their own terminals, with no data sharing between agents). This work includes self-networking microgrids. The key objectives of this work were a) to demonstrate how high the performance of local-measurement-only self-assembling power systems can be; and b) to solve certain technical problems associated with such systems, such as their inability to prevent the accidental formation of closed loops and their tendency to thermally overload some conductors. “SHAZAM” investigators a) demonstrated that the performance of such systems can be surprisingly high, b) demonstrated that such systems are quite robust to all kinds of variations, and c) developed and demonstrated solutions to several key challenges associated with this type of system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Gemini status report.

Missions of Gemini VI through XI covering rendezvous, docking, thermal overloading, translation maneuver, etc

GEMINI PROJECT↗

High-Performance Heat Pipe With Screen Mesh

Liquid distributed more evenly in evaporator section. Improved heat pipe contains an artery and wick rolled from stainless-steel screen of 180 mesh (openings about 80 micrometers). Screen material helps to prevent dryout in evaporator section by conducting liquid through hotspots and to vaporchannel wall. Insert reduces incidence of dryout at hotspots or during intervals of general thermal overload.

Alario, J. P.↗

Foil Bearing Starting Considerations and Requirements for Rotorcraft Engine Applications

Foil gas bearings under development for rotorcraft-sized, hot core engine applications have been susceptible to damage from the slow acceleration and rates typically encountered during the pre-ignition stage in conventional engines. Recent laboratory failures have been assumed to be directly linked to operating foil bearings below their lift-off speed while following conventional startup procedures for the engines. In each instance, the continuous sliding contact between the foils and shaft was believed to thermally overload the bearing and cause the engines to fail. These failures highlight the need to characterize required acceleration rates and minimum operating speeds for these applications. In this report, startup experiments were conducted with a large, rotorcraft engine sized foil bearing under moderate load and acceleration rates to identify the proper start procedures needed to avoid bearing failure. The results showed that a bearing under a 39.4 kPa static load can withstand a modest acceleration rate of 500 rpm/s and excessive loitering below the bearing lift-off speed provided an adequate solid lubricant is present.

Radil, Kevin C.↗

A Methodology to Consider Combined Electrical Infrastructure and Real-Time Power-Flow Impact Costs in Planning Large-Scale Renewable Energy Farms

The U.S federal government's strategic vision encouraging renewable energy production has motivated several new energy generation projects. Among them are large-scale renewable energy farm building efforts, where one considers the renewable resource potential along with land, equipment and installation costs. The goal in the planning phase of these efforts is to maximize the return on investment as well as the utilization of resources. The challenge, however, that is specific to integrating new generation is the need to include the operational (both construction as well as run-time) cost of introducing power to the existing infrastructure. In this paper, we propose a methodology to compute and include energy transmission line proximity (a construction time cost) and thermal-overload, and voltage out-of-range (an infrastructure cost) factors. Thus we consider both distance to infrastructure and the power-flow impacts when we plan to tap into an existing infrastructure. We present results for a simulation study over regions in Texas, Kansas, Colorado, New Mexico and Oklahoma and discuss the observations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EV Hosting Capacity Analysis on Distribution Grids

The increasing trend in electric vehicle (EV) adoption can cause challenges to traditional electric grid operations if utilities are not equipped with tools and methods to effectively manage these fleets. Growing EV charging loads will alter the magnitude and duration of conventional peaks in demand profiles and even significantly shift them, potentially causing operational violations in the distribution grid. This paper presents the development and results of an EV hosting capacity tool to quantify the impacts of injecting large numbers of EV charging loads and to determine the available capacity of existing distribution feeders to continue providing reliable and affordable grid operations. Tools like the hosting capacity analysis would enable utilities to better prepare for grid operations in the near future while exploring the impact and effectiveness of strategies to manage these loads, such as peak pricing and smart charging. This paper evaluates the hosting capacity of some real-world feeders to accommodate EV charging loads, including extreme fast-charging options.

distribution grid↗