Search NASA⌕ Search

SEARCH · Search NASA

Results for “thermal overload”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

14 SOLAR ENERGY↗

First feedback-controlled divertor detachment in W7-X: Experience from TDU operation and prospects for operation with actively cooled divertor

In the last experimental campaign (OP1.2b) of the stellarator Wendelstein 7-X (W7-X), boronisation as a mean for first wall conditioning was applied for the first time which led to strongly reduced impurity fluxes from plasma-facing components. Thermal detachment at the uncooled target plates of the test divertor unit (TDU) was reached at higher plasma densities and was accompanied by high recycling of neutrals at the target plate. A feedback control system was established in W7-X to actively control the gas injection (actuator) for plasma fuelling and impurity seeding [3] through the divertors. It allowed very successful stabilisation of the detached plasma condition state as well as mitigation of thermal overloads to some baffle tiles. Different routinely available diagnostic signals were used as input parameters (sensors). We describe the setup of the feedback control system, its performance and provide some example results with the main focus on the development of the control scheme which led to the detachment stabilisation over the entire longest (30 s) high-power discharge at W7-X so far. In view of the achieved very successful detachment stabilisation and the necessity to include simultaneous optimisation of the core performance in the future, the feedback control system is being upgraded for the upcoming campaign (OP2.1) in which the water cooled and hereby inherently steady-state capable divertor has been currently installed. The prospects and some experiment ideas for active detachment control are discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Self-healing, self-assembling islanded power systems using only local measurements

This SAND report collects the results from the LDRD project “SHAZAM”, which aimed to push the limits of performance for self-healing, self-assembling power systems whose sectionalizing and load-control agents rely on local measurements only (i.e., only what they can measure at their own terminals, with no data sharing between agents). This work includes self-networking microgrids. The key objectives of this work were a) to demonstrate how high the performance of local-measurement-only self-assembling power systems can be; and b) to solve certain technical problems associated with such systems, such as their inability to prevent the accidental formation of closed loops and their tendency to thermally overload some conductors. “SHAZAM” investigators a) demonstrated that the performance of such systems can be surprisingly high, b) demonstrated that such systems are quite robust to all kinds of variations, and c) developed and demonstrated solutions to several key challenges associated with this type of system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Hosting Capacity Analysis on Distribution Grids

The increasing trend in electric vehicle (EV) adoption can cause challenges to traditional electric grid operations if utilities are not equipped with tools and methods to effectively manage these fleets. Growing EV charging loads will alter the magnitude and duration of conventional peaks in demand profiles and even significantly shift them, potentially causing operational violations in the distribution grid. This paper presents the development and results of an EV hosting capacity tool to quantify the impacts of injecting large numbers of EV charging loads and to determine the available capacity of existing distribution feeders to continue providing reliable and affordable grid operations. Tools like the hosting capacity analysis would enable utilities to better prepare for grid operations in the near future while exploring the impact and effectiveness of strategies to manage these loads, such as peak pricing and smart charging. This paper evaluates the hosting capacity of some real-world feeders to accommodate EV charging loads, including extreme fast-charging options.

distribution grid↗

Uncontrolled Electric Vehicle Charging Impacts on Distribution Electric Power Systems with Primarily Residential, Commercial or Industrial Loads

An increase in Electric Vehicles (EV) will result in higher demands on the distribution electric power systems (EPS) which may result in thermal line overloading and low voltage violations. To understand the impact, this work simulates two EV charging scenarios (home- and work-dominant) under potential 2030 EV adoption levels on 10 actual distribution feeders that support residential, commercial, and industrial loads. The simulations include actual driving patterns of existing (non-EV) vehicles taken from global positioning system (GPS) data. The GPS driving behaviors, which explain the spatial and temporal EV charging demands, provide information on each vehicles travel distance, dwell locations, and dwell durations. Then, the EPS simulations incorporate the EV charging demands to calculate the power flow across the feeder. Simulation results show that voltage impacts are modest (less than 0.01 p.u.), likely due to robust feeder designs and the models only represent the high-voltage (“primary”) system components. Line loading impacts are more noticeable, with a maximum increase of about 15%. Additionally, the feeder peak load times experience a slight shift for residential and mixed feeders (≈1 h), not at all for the industrial, and 8 h for the commercial feeder.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design and performance assessment of a dual-mode latent thermal storage integrated heat pump across multiple climate zones

The electrification of space cooling and heating systems risks overloading the existing electrical grid during peak hours. Heat pumps integrated with thermal energy storage (HP-TES) offer a promising solution by shifting peak loads to off-peak hours, reducing grid strains. This work presents the design and assessment of a dual-mode HP-TES that uses a single 22°C phase-change material (PCM) as a heat source or sink in heating and cooling modes, respectively. Performance assessment was conducted using Modelica-based transient models, and full-year simulations were conducted across eight US climate zones using typical weather data. Two HP-TES performance metrics: peak energy reduction and recharge energy increases, were defined by comparing HP-TES energy consumption with base HP peak consumptions. Annual heating demand reductions (40–65%) exceeded cooling demand reductions (15–20%) due to the elimination of peak-hour backup heating. Cooling mode recharge energy requirements (0–10%) were reduced in locations with lower summer nighttime temperatures, while heating recharge requirements were lower than the high base-peak energy demand from backup heating. Simplified rapid methods that were 10 7 times faster than annual simulations were developed to predict seasonal cooling and heating energy reductions, and recharge energy requirements, with maximum deviations of ±2.5% and ±3.5% points. These methods enabled rapid parametric studies that identified optimal location-specific PCM temperatures between 22°C and 27°C, highlighting the need to consider both discharge and recharge energy requirements to achieve sustainable, energy-efficient peak load shifting across various climate zones.

25 ENERGY STORAGE↗

Insulating Nanofluids and Solids to Upgrade our Large Aging Transformer Equipment (Advanced Research Projects Agency – Energy Research Final Report)

This project developed a highly promising, minimally invasive pathway for transformers with up to double the thermal life that is achieved today. Thermal life is important because it is occasionally necessary to overload transformers in service and this overload raises the internal temperature, accelerating aging2. A seminal initial finding in the research was that a likely achievable increase in the thermal conductivity of the transformer paper could double the thermal life. Oil-impregnated paper is used to wrap the electrical conductors in a transformer to provide a good balance of electrical insulation and thermal conductivity. The novel approach to increase the thermal conductivity was to add micrometer boron nitride particles to the paper during manufacturing. This is encouraging because it provides benefits with minimal impact on the manufacturing processes of the paper or of a transformer.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transient Stability-Enhancing Method for Grid-Forming Inverters Under Current Limiting

The primary controller of a grid-forming (GFM) inverter governs the internal reference voltage and angle, which enables the inverter to naturally synchronize and share power with the connected grid; however, during disturbances on the grid caused by, e.g., line faults, overloading, or frequency and phase shifts, a GFM inverter can be pushed into a current-limited operation to protect the device against thermal damage. This can lead to a windup of the internal reference frequency generated by the primary controller and cause a total loss of synchronism with the grid. Here, to make the primary controller of GFM inverters more robust against transient instability, this paper proposes a method that manipulates the reference signals governed by the primary controller by introducing the concept of fictitious power. The fictitious power counteracts the integrator windup in the primary controller, which enables the current-limited inverter to conceive a stable operating point. This method is benchmarked against five state-of-the-art GFM inverter stabilization methods to evaluate its stability-enhancing performance. Full-order electromagnetic-transient simulations and experimental results of a hardware inverter test setup validate the benefits of the method to improve the transient stability of GFM inverters in the face of grid disturbances.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Assessment of a Dual-purpose HP-TES for a Typical Year Comparing Different Climate Zones

Complete electrification of heating and cooling systems in the United States would overload the existing electrical grid. To this end, recent research efforts have focused on energy storage as one way to reduce ever-increasing peak electricity demands. One such technology is heat pump integrated thermal-energy storage (HP-TES) systems, which can enable load-shifting and reduce demand during peak hours. In this work, a Modelica model of a 4-Ton, dual-mode (heating and cooling) HP-TES system using a room-temperature phase-change material (PCM) integrated through a secondary hydronic loop was developed and simulated for a typical meteorological year in Riverside, CA (ASHRAE Climate Zone 2B), and Chicago, IL (ASHRAE Climate Zone 5A), for a DOE small office prototype building. The COP improvement and demand reduction were analyzed during the time-of-use peak hours along with the required recharge cycle energy demand. A typical summer in Riverside, CA resulted in model-predicted peak COP increases of 50 – 100% compared to the baseline heat pump, especially at higher outdoor temperatures, coupled with maximum peak energy reductions of 22%. During shoulder and winter season simulations, heating energy savings were higher as outdoor temperatures dropped below the PCM phase change temperature. For Chicago, IL, backup heating was necessary to meet the required system capacity for very cold ambient conditions, resulting in winter peak energy savings between 16 – 60% when accounting for backup heating requirements. The recharge energy was found to be mostly below the baseline HP energy during the peak. With improved component selections and controls, the recharge energy may be reduced. The outcomes from the simulations can provide first-order estimates for potential peak energy savings, challenges, and required controls in any location before conducting any field testing.

25 ENERGY STORAGE↗

Investigation of Nonflammable Electrolytes for Behind-the-Meter Storage Batteries

Behind-the-Meter Storage (BTMS) is a battery-based, stationary energy storage system that is connected to the residential or industrial customer's side of the electrical grid utility service meter. BTMS systems enable consumers to (A) economically schedule charging and usage of stored energy, (B) store and use energy from on-site generation, especially from inconstant, renewable sources like solar and wind, and (C) avoid overloading the grid during peak hours via supplementation with stored energy. BTMS battery performance requirements and general priorities differentiate from other applications, like EVs, which has prompted the development of batteries with tailored electrode and electrolyte materials. These materials prioritize low cost, avoiding critical materials; longevity, achieving 8000 cycle and 20-year shelf lives; and importantly, high safety. Nonflammable electrolytes show promise to improve safety by mitigating thermal runaway, yet often come with sacrifices to battery performance. In this presentation (1) primary categories of nonflammable electrolytes will be discussed; (2) a rational design of experiment will be presented for efficient performance evaluation of several nonflammables electrolyte in BTMS-relevant battery chemistry, Li4Ti5O12- and LiNi0.90Mn0.10O2; and (3) preliminary results will be presented.

battery↗

Performance and Durability of Hybrid Fuel Cell Systems for Class-8 Long Haul Trucks

Hybrid fuel cell-battery configurations are investigated that overcome thermal management issues in fuel cell powertrains for heavy-duty Class 8 trucks. The battery is sized so that it has sufficient capacity to provide supplemental power and energy on a hill climb transient at end-of-life. A dynamic load sharing strategy is developed to distribute the power demand between the fuel cell system (FCS) and the energy storage system in a manner that optimizes their lifetimes. The FCS end-of-life is identified as the terminal point beyond which the stack cannot generate the rated power with target power density at 0.7 V and 40 °C ambient temperature. Reaching the target lifetime with a-Pt/C cathode catalyst in one hybrid configuration requires voltage clipping to 813 mV, idle power limited to 50 kW, catalyst overloading to 0.45 mg cm -2 total Pt in anode and cathode, and 44% active membrane area oversizing. The stack and FCS drive cycle efficiencies decrease by 4.2% and 5.4%, respectively, during the electrode lifetime. Further, the FCS performance, durability and cost are compared with the targets of 68% peak efficiency, 0.30 mg cm -2 total Pt loading, 2.5 kW/g PGM Pt group metal (PGM) loading, 750 mW cm -2 power density, 25,000-h lifetime and $80/kW cost.

33 ADVANCED PROPULSION SYSTEMS↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on Banshee Distribution Network

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on the Banshee Distribution Network: Preprint

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗