Search NASA⌕ Search

SEARCH · Search NASA

Results for “thermal power dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Simulation of 15% and 50% Thermal Power Dispatch to an Industrial Facility Using a Flexible Generic Full-Scope Pressurized Water Reactor Plant Simulator

Nuclear power plants in the United States are increasingly challenged to compete in wholesale electricity markets due to the low electricity costs and increasingly dynamic grid conditions from competing generation sources. An alternative market for nuclear power is industrial facilities that can use the thermal and/or electrical power generated by a nuclear power plant to offset the economic losses incurred by electricity market challenges. A generic pressurized water reactor (PWR) simulator was used to show the results of a basic design for a generic thermal power extraction system and tests were run using a set of procedures to show what happens when a nuclear power plant transitions from full electrical power dispatch to 15% and 50% thermal power dispatch. This type of operation leads to losses in turbine performance efficiency due to the deviation from the design operating point, but because the thermal power is also used by the industry load without conversion losses, the combined thermal efficiency of the PWR increases. For the 15% case, the thermal efficiency increased from 32% to 41.9%, while for the 50% case, the efficiency increased up to 60.1%. In addition, for 50% thermal power dispatch, the power dissipated by the condenser decreased from approximately 2000 to approximately 1300 MW (thermal), indicating a substantially diminished impact on the environment in terms of releasing heat into the cooling water reservoir.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Reduced-Order Model of a Nuclear Power Plant with Thermal Power Dispatch

This paper presents reduced-order modeling of thermal power dispatch (TPD) from a pressurized water reactor (PWR) for providing heat to nearby heat consuming industrial processes that seek to take advantage of nuclear heat to reduce carbon emissions. The reactor model includes the neutronics of the reactor core, thermal–hydraulics of the primary coolant cycle, and a three-lump model of the steam generator (SG). The secondary coolant cycle is represented with quasi-steady state mass and energy balance equations. The secondary cycle consists of a steam extraction system, high-pressure and low-pressure turbines, moisture separator and reheater, high-pressure and low-pressure feedwater heaters, deaerator, feedwater and condensate pumps, and a condenser. The steam produced by the SG is distributed between the turbines and the extraction steam line (XSL) that delivers steam to nearby industrial processes, such as production of clean hydrogen. The reduced-order simulator is verified by comparing predictions with results from separate validated steady-state and transient full-scope PWR simulators for TPD levels between 0% and 70% of the rated reactor power. All simulators indicate that the flow rate of steam in the main steam line and turbine systems decrease with increasing TPD, which causes a reduction in PWR electric power generation. The results are analyzed to assess the impact of TPD on system efficiency and feedwater flow control. Due to the simplicity of the proposed reduced-order model, it can be scaled to represent a PWR of any size with a few parametric changes. In the future, the proposed reduced-order model will be integrated into a power system model in a digital real-time simulator (DRTS) and physical hardware-in-the-loop simulations.

08 HYDROGEN↗

Incorporation of Thermal Hydraulic Models for Thermal Power Dispatch into a PWR Power Plant Simulator

This report describes the development, modeling, and results of a generic pressurized water reactor power plant simulator that incorporates coupled electrical and thermal power dispatch to an industrial process located approximately one kilometer from the nuclear power plant. The simulator is a commercial PWR simulator that has been modified to include thermal power dispatch as described in past milestone reports [ , ]. The commercial PWR simulator is a generic simulator available from GSE SYSTEMS® (Sykesville, MD, USA) that is built using RELAP5-HDTM Real-Time Solution and in-house software developed by GSE Systems. This generic PWR (GPWR) simulator performs real-time simulation of the complete power plant from the reactor neutronics to the electricity generation and distribution. All primary, secondary, and auxiliary systems are modeled including all control logic in order to provide the most accurate representation of actual nuclear power plant (NPP) operation, and the simulator results have been rigorously verified by an actual NPP operating at approximately 1 GWe. This report is a continuation of worked performed in previous years, and supplemental information from previous reports is included in the appendix for reference.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Early-stage Testing of Thermal Power Dispatch Simulator for Subjective Mental Workload and Evolution Time

The excess thermal energy produced by nuclear power plants (NPPs) during low electricity demands can be utilized in industrial processes, such as hydrogen production, through a thermal power dispatch (TPD) system. Initial testing of the first iteration of a single-train TPD design with a manual control mode at the Idaho National Lab (INL) revealed a high operator workload and degraded control capability. The current study evaluated the impact of an enhanced dual-train TPD design on operators’ subjective mental workload and evolution task-time while completing two operating scenarios in manual and automatic control modes. The results showed no statistically significant difference between participants’ mental workload using both control modes. Evolution time in automatic control mode took a shorter time than in manual control, with participants completing all evolutions in less than the 10-min set as the design specification limit. The shorter evolution time is discussed within the context of plant safety and operational efficiency.

Gideon, Olugbenga↗

System design and analysis of thermal power dispatch systems for boiling water reactors

Nuclear power plants are crucial to meeting net zero emission goals and achieving energy sustainability. Integrating these plants with clean energy technologies such as high-temperature steam electrolysis (HTSE) may improve the efficiency and economic competitiveness of these plants. Here, the current study investigates the design and operation of a thermal power dispatch (TPD) system for coupling boiling water reactors (BWRs) to HTSE plants. The TPD system extracts a portion of the steam from the reactor’s main steam line and transfers its thermal energy to an HTSE plant through a power transport loop. A TPD system for 5 % steam extraction has been designed and the system performance during steady and transient operations has been analyzed. The TPD system dispatched a total of 197 MW thermal energy to the HTSE plant under nominal design conditions. Saturated steam at 7.17 MPa from the BWR plant was condensed and subcooled to a temperature of 168 °C, while a mass flow rate of 91.1 kg/s of superheated steam was dispatched to the HTSE plant. Furthermore, the system performance during transient operation showed a continuous transition from the initial hot standby mode to the nominal power dispatch level. The transient simulation results emphasized the importance of investigating component level performance for the TPD system design. The current results will guide future works on the development of integrated energy systems for hydrogen production or process heat applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dynamic Human-in-the-Loop Simulated Nuclear Power Plant Thermal Dispatch System Demonstration and Evaluation Study

An Idaho National Laboratory research team performed a human-in-the-loop study with two formerly licensed retired operators to evaluate thermal power dispatch operations supported by the modified GSE Systems GPWR plant simulator. Virtual representations of the analog control panels were presented on touch-screen bays configured to mimic the control room layout in the newly renovated Human Systems Simulation Laboratory. The operators performed 15 scenarios covering normal evolutions to transition the plant from full turbine operation to joint turbine and thermal power dispatch operations in addition to transient response scenarios induced with simulated faults to evaluate the impact of thermal power dispatch system on operator and plant responses. A prototype human-system interface (HSI) was developed and displayed in tandem with the virtual analog panels to support the operators executing the procedurally drive evolutions and transient responses. An interdisciplinary team of operations experts, nuclear engineers, and human factors experts observed the operators performing the scenarios to evaluate the operations. Only a preliminary analysis of the results has been performed. The full analysis will be shared in a milestone report scheduled for release at the end of September; however, some high-level conclusions were readily available. Two high level findings for the system design were captured in the study. The manual control supported by the HSI to transition from standard operations to thermal power dispatch operation imposed a considerable amount of workload on the operators due to tedious manual valve manipulations and system monitoring required to verify their intended effect. An additional operator would be required in the control room to support the daily evolution. Automatic control for the transition was deemed a requirement for plant adoption without imposing additional staffing costs. The second finding was the necessity for an automatic thermal power dispatch system trip isolation function linked to a turbine and reactor trip signal. The operators completed scenarios with automatic isolation functionality and manually required actuation of the thermal power dispatch system. The operator response was sufficiently slower in the manual trip condition, such that operators were unable to manually actuate key post trip safety functions an indicate a degraded control capability that should be avoided. With an automatic trip signal little to no impact of the thermal power dispatch system was identified on the primary plant response and therefore the system could be readily and safely adopted. Together these two findings represent the need to support the adoption of thermal power dispatch capability into existing operations by leveraging automation to augment any additional operator tasking required to control and monitor an additional system beyond existing operations.

99 GENERAL AND MISCELLANEOUS↗

Advancements in Development and Testing of Thermal Power Dispatch Simulators

Flexible plant operations and generation (FPOG) offer nuclear power plants (NPPs) the chance to leverage alternative, non-electric revenue streams while ensuring their continued role as reliable, clean, and constant sources of baseload electrical power. The excess thermal energy generated from NPPs during periods of low electricity demand can be channeled as raw materials to numerous industrial processes via a thermal power dispatch (TPD) system. Hydrogen production via high-temperature steam electrolysis (HTSE) is an optimal use case based on technical and economic feasibility. Researchers at Idaho National Laboratory (INL) have conducted previous works that developed and implemented TPD system models within the GSE Solutions Generic Pressurized Water Reactor (GPWR) simulator to support human-in-the-loop (HITL) scenario-based evaluations. The first part of this report documents modifications made to the GPWR TPD model and HMI from the previous iteration in line with a new Sargent and Lundy (S&L) TPD design with an automatic control system. The was done in collaboration with Westinghouse using their three-loop pressurizer water reactor (W3LPWR) simulator which contains an industrial grade automatic control system for the TPD. This was installed in the Human Systems Simulation Laboratory (HSSL) at INL. The second part of the report documents findings from an all-hands-on-deck integration and verification workshop that was conducted in the HSSL over several days. The research team comprised INL human factors and TPD experts, a nuclear engineer from GSE Solutions who implemented the revised TPD model for GPWR, the human-machine interface (HMI) prototyping and human factors team from the University of Idaho, and personnel with operations experience with pressurized water reactors. The workshop provided time and expertise to conduct the final activities to bring the operations, HMI, and simulator into a functional state. The goals of the integration and verification workshop were: 1. to install the revised GPWR TPD model into the HSSL 2. verify the TPD HMI prototype was functional 3. integrate the HTSE Simulink model to GPWR. 3. Issues were identified for resolution, but overall the workshop accomplished its goal to integrated and verify the majority of the intended functional. Future work will resolve the identified issues and use the integrated simulation to support an evaluation and demonstration in the next fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Tale of Two Simulators—A Comparative Human-in-the-Loop Nuclear Power Plant Operations Study on Thermal Power Dispatch for Hydrogen Production

A study was designed for a reconfigurable, full-scale, full-scope nuclear power plant control room simulator to compare two different thermal power dispatch systems, on separate simulator platforms, demonstrating a TPD concept of operation. A TPD system can provide a desirable alternative revenue source for utilities but requires addressing new and unique operational issues. The selection of representative scenarios and the scenario-based experimental design are presented as key elements to capture evidence for validating the developed TPD concept of operations overcome these operational issues.

Ulrich, Thomas A.↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Development and Demonstration of a Reduced-Order PWR Power Dispatch Simulator

This report describes the development, modeling, and results of a reduced-order thermal power dispatch pressurized water reactor (RO-TPD-PWR) power plant simulator that incorporates coupled electrical and thermal power dispatch to an industrial process. The simulator is built on models that have been developed in previous work, including a Rancor Microworld model previously developed by INL and the University of Idaho [Ref] and reactor core and secondary system models that have been published previously [Ref]. The simulator also includes a scalable model of a high temperature electrolysis (HTE) system that has been developed at INL. A particular benefit of the Rancor Microworld model is that it is compatible with a human-system interface (HMI) that has already been developed by the Human System Simulation Laboratory (HSSL) at INL that can emulate the control room of a PWR for realistic human-in-the-loop studies with mock nuclear power plant operating procedures. The results of these human-in-the-loop tests will be compared with similar tests using a commercial full-scope generic PWR (GPWR) simulator that has been modified to include thermal power dispatch, referred to as the TPD-GPWR [ , ]. The simplicity of the RO-TPD-PWR helps to better understand and verify the results of the TPD-GPWR, which employs >1,000 variables and has much greater complexity. A second key purpose of the RO-TPD-PWR simulator is that its relative simplicity allows it scale between lab-size equipment (~100 kW) and full-scale nuclear power plants (~1 GW) by adjusting only a few parameters in the models, such as fluid masses and heat exchanger areas. The RO-TPD-PWR simulator will be used to guide the controls of lab tests, so that equipment in those tests, such as the Thermal Energy Distribution System (TEDS) and pilot-scale high temperature electrolysis (HTE) units at scales of 50-250 kW, may operate in a manner that is relevant to full-scale PWR operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Rapid Procedure Development Approach for Multi-stage Validation of Novel Nuclear Power Plant Systems

The integration of renewable energy sources into the modern grid introduces variability in generation, challenging nuclear reactors to remain economically viable amid low wholesale electricity prices. To address this, Idaho National Laboratory?s Flexible Plant Operation and Generation program explores alternative revenue streams, including commoditizing excess thermal energy. A Thermal Power Dispatch (TPD) system enables steam extraction from the secondary loop for industrial uses like hydrogen production via high-temperature steam electrolysis.

99 - GENERAL AND MISCELLANEOUS↗

Preliminary Evaluation of Joint Electricity-Hydrogen Concept of Operations

An initial thermal power dispatch (TPD) concept of operations was evaluated that couples a nuclear power plant to a nearby hydrogen production plant. GSE Systems’ generic pressurized water reactor full-scope simulator was modified with a TPD model comprised of a thermal power extraction and delivery system. A prototype human-system interface (HSI) was developed to interact with the TPD model and allow participants to execute the basic operating scenarios for normal operations. Four retired operators performed the evaluation, and due to COVID-19 travel restrictions, the original in-person experimental design was restructured to support a remote participator evaluation using a web meeting platform. Data from operator feedback, observations from the research team, and quantitative survey responses revealed that the initial TPD concept of operations is feasible. The operators were comfortable with the engineered system and HSI and could manage it without adverse impacts to reactor power, plant safety, or equipment. Findings are discussed in terms of both the TPD system design and HSI performance.

human factors↗

Real-time dispatch optimization for concentrating solar power with thermal energy storage

Concentrating solar power (CSP) plants present a promising path towards utility-scale renewable energy. The power tower, or central receiver, configuration can achieve higher operating temperatures than other forms of CSP, and, like all forms of CSP, naturally pairs with comparatively inexpensive thermal energy storage, which allows CSP plants to dispatch electricity according to market price incentives and outside the hours of solar resource availability. Currently, CSP plants commonly include a steam Rankine power cycle and several heat exchange components to generate high-pressure steam using stored thermal energy. The efficiency of the steam Rankine cycle depends on the temperature of the plant's operating fluid, and so is a main concern of plant operators. However, the variable nature of the solar resource and the conservatism with which the receiver is operated prevent perfect control over the receiver outlet temperature. Therefore, during periods of solar variability, collection occurs at lower-than-design temperature. To support operator decisions in a real-time setting, we develop a revenue-maximizing non-convex mixed-integer, quadradically-constrained program which determines a dispatch schedule with sub-hourly time fidelity and considers temperature-dependent power cycle efficiency. The exact nonlinear formulation proves intractable for real-time decision support. Here we present exact and inexact techniques to improve problem tractability that include a hybrid nonlinear and linear formulation. Our approach admits solutions within approximately 3% of optimality, on average, within a five-minute time limit, demonstrating its usability for decision support in a real-time setting.

14 SOLAR ENERGY↗

Flexible Plant Operation and Generation Technical Program Plan for FY2023

This report presents the Technical Program Plan for Fiscal Years 2023-2027 (FY2023 to FY2027) for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program—Flexible Plant Operation and Generation Research Pathway. The objective of this pathway is to carry out the research needed to help nuclear power plants diversify revenue generation for the life of these plants. The purpose of these research and development activities is two fold: (1) to reduce the technical and economic risks of implementing FPOG applications and (2) to provide guidance on relevant safety and environmental operating license reviews, amendments, and renewals. This pathway provides a clear understanding of the benefits of nuclear energy beyond electricity markets. A detailed description of the research and development activities that have been completed and that are planned for FY2023—FY2027 are presented in this report. These activities include completing the development of analysis tools to perform technical and economic assessments of realistic market opportunities for producing secondary energy products near nuclear power plants. They also include developing and demonstrating engineering systems and control concepts to dispatch thermal and electrical power to an industrial user. Additionally, this plan includes developing guidance for addressing potential regulatory and licensing requirements. In addition, the formation, purpose, and activities of a group referred to as the Hydrogen Regulatory Research and Review Group is discussed. An overview is also provided on the potential benefits of the Infrastructure Investment and Jobs Act (IIJA) Bill that will support the commencement of Regional Clean Hydrogen Hubs, and the Inflation Reduction Act (IRA) that provides compelling production tax credits for nuclear electricity and clean hydrogen using nuclear energy.

08 HYDROGEN↗

Leveraging concentrating solar power plant dispatchability: A review of the impacts of global market structures and policy

Concentrating solar power (CSP) integrated with thermal energy storage delivers flexible and dispatchable power, which is an increasingly valuable quality as electricity systems integrate growing penetrations of variable renewable energy. Valuing and compensating CSP's dispatchability and flexibility requires electricity market structures and policies that appropriately remunerate generation during high-value portions of the day. In this paper, we review previous analyses of CSP economics and deployment, and we find that continued CSP growth will require valuation mechanisms that appropriately compensate for CSP's flexibility during both plant design and plant operation. We then review market structures that drive CSP operations and dispatch in jurisdictions where CSP is being developed, with perspectives from Spain, Chile, Australia, Morocco, South Africa, the United States, China, and the United Arab Emirates (Dubai). Despite broad agreement that CSP's dispatchability provides value to electricity grids, countries' policies for remunerating and leveraging such dispatchability varies widely. As deployment of CSP and variable renewable energy grows, it will be increasingly important to redesign current integration policies to signal the delivery of CSP's grid services more appropriately.

14 SOLAR ENERGY↗

Demonstration of a multi-channel fluidized bed particle–supercritical carbon dioxide heat exchanger for concentrating solar applications

High-temperature thermal energy storage in oxide particles at temperatures above 600°C can couple concentrated solar energy with high-efficiency thermal power cycles to provide dispatchable solar-driven electricity. Challenges remain in developing cost-effective primary heat exchangers, which require expensive alloys, to extract the high-temperature thermal energy from the particles to power cycle fluids, such as supercritical CO 2 (sCO 2 ) in recuperated Brayton cycles. To explore one pathway for cost-effective, high-temperature particle heat exchangers, the current study demonstrates a shell-and-plate, particle–sCO 2 heat exchanger with narrow- channel fluidized beds coupled with micro-channel sCO 2 flows in the heat exchanger walls. This study evaluates the feasibility of multiple parallel, narrow-channel fluidized beds in shell-and-plate particle–sCO 2 HXs, to achieve high bed-wall heat fluxes at elevated temperatures. A reduced-order model simulates the narrow- channel, fluidized-bed particle–sCO 2 heat exchanger to design the fluidized bed geometry, in terms of depth, height, and number of channels,for a nominal 40-kWth heat exchanger at particle and sCO 2 inlet temperatures up to 600 °C and 400 °C respectively. The resulting shell-and-plate heat exchanger design operates with bubbling fluidization of the downward-flowing oxide particles to enhance bed-wall heat transfer. The heat exchanger core is fabricated with etched sCO 2 micro-channels in thin wall plates that are diffusion bonded to spacer frames to form the shell-and-plate structure with 12 parallel, fluidized bed channels, 10.4 mm deep. The heat exchanger is tested at the National Solar Thermal Test Facility at Sandia National Laboratories with CARBOBEAD HSP particles at design particle flow rates of 0.20 kg s –1 and inlet temperatures up to 525 °C. Results show that fluidization across multiple parallel channel beds can maintain uniform particle inventory with a common freeboard zone above the heat exchanger core. Bubbling fluidization improves particle–wall heat transfer coefficients but also increases axial dispersion of particle thermal energy, which lowers the log- mean temperature difference such that total heat transfer remains relatively constant to within ±10% over a broad range of fluidization gas velocities. The axial dispersion required particle and sCO 2 flow rates to be increased by 25% over model-designed conditions to achieve the targeted 40 kWth, which indicates the importance of incorporating axial dispersion into heat exchanger design models and of deploying bed structures to suppress it. Furthermore, this study demonstrates the feasibility and preferred fluidizing gas conditions for particle heat exchangers for releasing high-temperature thermal energy storage systems.

14 SOLAR ENERGY↗

Deep reinforcement learning based optimization for a tightly coupled nuclear renewable integrated energy system

New ways to integrate energy systems to maximize efficiency are being sought to meet carbon emissions goals. Nuclear-renewable integrated energy system (NR-IES) concepts are a leading solution that couples a nuclear power plant with renewable energy, hydrogen generation plants, and energy storage systems, such that thermal and electrical power are dispatchable to fulfill grid-flexibility requirements while also producing hydrogen and maximizing revenue. Here, this paper introduces a deep reinforcement learning (DRL)-based framework to address the complex decision-making tasks for NR-IES. The objective is to maximize revenue by generating and selling hydrogen and electricity simultaneously according to their time-varying prices while keeping the energy flow in the subsystems in balance. A Python-based simulator for a NR-IES concept has been developed to integrate with OpenAI Gym and Ray/RLlib to enable an efficient and flexible computational framework for DRL research and development. Three state-of-the-art DRL algorithms have been investigated, including two-delayed deep deterministic policy gradient (TD3), soft-actor critic (SAC), proximal policy optimization (PPO), to illustrate DRL’s superiority for controlling NR-IES by comparing it with a conventional control approach, particle swarm optimization (PSO). In this effort, PPO has shown more-stable performance and also better generalization capability than SAC and TD3. Comparisons with PSO have demonstrated that, on average, PPO can achieve 13.9% more mean episode returns from the training process and 29.4% more mean episode returns from the testing process when different hydrogen-production targets are applied.

08 HYDROGEN↗