Search NASA⌕ Search

SEARCH · Search NASA

Results for “thermal vacuum chamber”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Refurbishment of a 39 foot thermal vacuum chamber

The 39' thermal vacuum chamber at Space Systems/Loral has been used to test numerous spacecraft including those of the GOES, Intelsat, Insat, Superbird, N-Star, NATO and other programs. Ten years ago, the aluminum LN2 shroud experienced serious fatigue failures in the field welded jumper tubing, effectively shutting down the chamber for vacuum testing. The problem was repaired at the time, but new failures began to reappear a few months ago and are now occurring at a rate that suggests that the shroud may again become inoperable. Consequently, Space Systems/Loral is spending in excess of $6 million to replace the shroud and the existing LN2 equipment with a new, state of the art cryogenic system. In May, 1994, a contract was awarded to remove the existing shroud and LN2 pumping system and replace it with a gravity fed shroud and distribution system. Included in the contract are eight skid mounted gaseous nitrogen pumping systems capable of controlling shroud zone temperatures between +150 C and -180 C. The project is scheduled to be completed in April 1995.

Edwards, Arthur A.↗

Technical Capability Upgrades to the NASA Langley Research Center 6 ft. by 6 ft. Thermal Vacuum Chamber

The 6 ft. by 6 ft. thermal vacuum chamber (TVAC), housed in Building 1250 at the NASA Langley Research Center (LaRC), and managed by the Systems Integration and Test Branch within the Engineering Directorate, has undergone several significant modifications to increase testing capability, safety, and quality of measurements of articles under environmental test. Significant modifications include: a new nitrogen thermal conditioning unit for controlling shroud temperatures from -150degC to +150degC; two horizontal auxiliary cold plates for independent temperature control from -150degC to +200degC; a suite of contamination monitoring sensors for outgassing measurements and species identification; signal and power feed-throughs; new pressure gauges; and a new data acquisition and control commanding system including safety interlocks. This presentation will provide a general overview of the LaRC 6 ft. by 6 ft. TVAC chamber, an overview of the new technical capabilities, and illustrate each upgrade in detail, in terms of mechanical design and predicted performance. Additionally, an overview of the scope of tests currently being performed in the chamber will be documented, and sensor plots from tests will be provided to show chamber temperature and pressure performance with actual flight hardware under test.

Thornblom, Mark N.↗

Technical Capability Upgrades to the NASA Langley Research Center 8 ft. by 15 ft. Thermal Vacuum Chamber

The 8 ft. by 15 ft. thermal vacuum chamber (TVAC), housed in Building 1250 at the NASA Langley Research Center (LaRC), and managed by the Systems Integration and Test Branch within the Engineering Directorate, has undergone several significant modifications to increase testing capability, safety, and quality of measurements of articles under environmental test. Significant modifications include: a new nitrogen distribution manifold for supplying the shroud and other cold surfaces to liquid nitrogen temperatures; a new power supply and distribution system for accurately controlling a quartz IR lamp suite; a suite of contamination monitoring sensors for outgassing measurements and species identification; a new test article support system; signal and power feed-throughs; elimination of unnecessary penetrations; and a new data acquisition and control commanding system including safety interlocks. This paper will provide a general overview of the LaRC 8 ft. by 15 ft. TVAC chamber, an overview of the new technical capabilities, and will illustrate each upgrade in detail, in terms of mechanical design and predicted performance. Additionally, an overview of the scope of tests currently being performed in the chamber will be documented, and sensor plots from tests will be provided to show chamber temperature and pressure performance with actual flight hardware under test.

Thornblom, Mark N.↗

In-Situ Focusing Inside a Thermal Vacuum Chamber

Traditionally, infrared (IR) space instruments have been focused by iterating with a number of different thickness shim rings in a thermal vacuum chamber until the focus meets requirements. This has required a number of thermal cycles that are very expensive as they tie up many integration and test (I&T)/ environmental technicians/engi neers work ing three shifts for weeks. Rather than creating a test shim for each iteration, this innovation replaces the test shim and can focus the instrument while in the thermal vacuum chamber. The focus tool consists of three small, piezo-actuated motors that drive two sets of mechanical interface flanges between the instrument optics and the focal- plane assembly, and three optical-displacement metrology sensors that can be read from outside the thermal vacuum chamber. The motors are used to drive the focal planes to different focal distances and acquire images, from which it is possible to determine the best focus. At the best focus position, the three optical displacement metrology sensors are used to determine the shim thickness needed. After the instrument leaves the thermal vacuum chamber, the focus tool is replaced with the precision-ground shim ring. The focus tool consists of two sets of collars, one that mounts to the backside of the interface flange of the instrument optics, and one that mounts to the backside of the interface flange of the focal plane modules. The collars on the instrument optics side have the three small piezo-actuated motors and the three optical displacement metrology systems. Before the instrument is focused, there is no shim ring in place and, therefore, no fasteners holding the focal plane modules to the cameras. Two focus tooling collars are held together by three strong springs. The Orbiting Carbon Observatory (OCO) mission spectrometer was focused this way (see figure). The motor described here had to be moved five times to reach an acceptable focus, all during the same thermal cycle, which was verified using pupil slicing techniques. A focus accuracy of .20.100 microns was achieved.

Liebe, Carl Christian↗

Updating the Thermal Vacuum Chambers at the NASA Johnson Space Center

Chambers A and B are two large thermal vacuum chambers at Johnson Space Center which enable space simulation for unmanned and human-rated missions, respectively. With the resurgence in deep space missions for scientific research and various private commercial ventures, these chambers are expected to be used frequently for at least the next decade. For qualifying the James Webb Space Telescope, upgrades to Chamber A were performed which included the addition of a 12.5 kW refrigeration system with helium shrouds capable of simulating deep space environment and an efficient and reliable LN2 natural flow thermosiphon system for the thermal shield. Continuous improvements since then have focused on ensuring operational readiness by modernizing the data acquisition, recording, controls, and visualization systems for both chambers and clean room. These upgrades will be the focus of this paper. Controlling the Cryochambers was enhanced by moving from a 32-bit SCADA system to a 64-bit architected system. Infrastructural changes involved installing redundant power circuits, adding new servers, network switches, and including load balancing with fail-over between servers to minimize downtime. Instead of distributed servers, 3 redundant servers are used to share configurations. Configurations are now kept in a shared SQL instance making it easy to deploy and maintain. During this upgrade process many sub-systems (PLCs and NI PXI interfaces to sensors) were upgraded from the prior OPC-DA to the more secure OPC-UA protocol. Cryo-system PLCs were updated to allow Ganni cycle floating pressure calculations from any cold box to be sent to any compressor. During the project, the team recreated over 70,000 live data points, 50000 historical data points, and 4000 alarms. Finally, the graphical interfaces were upgraded to support HTML 5 in conjunction shared pages were implemented reducing the total number of webpages by over 75%. These system updates reinvigorated the previous SCADA system which had reached its end of life. The same look and feel was maintained while providing operators with an updated interface to control, troubleshoot, and record. The new system architecture is more robust and easier to maintain creating a path forward to address remaining problem points and implement additional features.

Cody Schaefer↗

Updating the Thermal Vacuum Chambers at the NASA Johnson Space Center

Chambers A and B are two large thermal vacuum chambers at Johnson Space Center which enable space simulation for unmanned and human-rated missions, respectively. With the resurgence in deep space missions for scientific research and various private commercial ventures, these chambers are expected to be used frequently for at least the next decade. For qualifying the James Webb Space Telescope, upgrades to Chamber A were performed which included the addition of a 12.5 kW refrigeration system with helium shrouds capable of simulating deep space environment and an efficient and reliable LN2 natural flow thermosiphon system for the thermal shield. Continuous improvements since then have focused on ensuring operational readiness by modernizing the data acquisition, recording, controls, and visualization systems for both chambers and clean room. These upgrades will be the focus of this paper. Controlling the Cryochambers was enhanced by moving from a 32-bit SCADA system to a 64-bit architected system. Infrastructural changes involved installing redundant power circuits, adding new servers, network switches, and including load balancing with fail-over between servers to minimize downtime. Instead of distributed servers, 3 redundant servers are used to share configurations. Configurations are now kept in a shared SQL instance making it easy to deploy and maintain. During this upgrade process many sub-systems (PLCs and NI PXI interfaces to sensors) were upgraded from the prior OPC-DA to the more secure OPC-UA protocol. Cryo-system PLCs were updated to allow Ganni cycle floating pressure calculations from any cold box to be sent to any compressor. During the project, the team recreated over 70,000 live data points, 50000 historical data points, and 4000 alarms. Finally, the graphical interfaces were upgraded to support HTML 5 in conjunction shared pages were implemented reducing the total number of webpages by over 75%. These system updates reinvigorated the previous SCADA system which had reached its end of life. The same look and feel was maintained while providing operators with an updated interface to control, troubleshoot, and record. The new system architecture is more robust and easier to maintain creating a path forward to address remaining problem points and implement additional features.

Cody Schaefer↗

Affect of Air Leakage into a Thermal-Vacuum Chamber on Helium Refrigeration Heat Load

NASA s Johnson Space Center (JSC) Building 32 houses two large thermal-vacuum chambers (Chamber A and Chamber B). Within these chambers are liquid nitrogen shrouds to provide a thermal environment and helium panels which operate at 20K to provide cryopumping. Some amount of air leakage into the chambers during tests is inevitable. This causes "air fouling" of the helium panel surfaces due to the components of the air that adhere to the panels. The air fouling causes the emittance of the helium panels to increase during tests. The increase in helium panel emittance increases the heat load on the helium refrigerator that supplies the 20K helium for those panels. Planning for thermal-vacuum tests should account for this increase to make sure that the helium refrigerator capacity will not be exceeded over the duration of a test. During a recent test conducted in Chamber B a known-size air leak was introduced to the chamber. Emittance change of the helium panels and the affect on the helium refrigerator was characterized. A description of the test and the results will be presented.

Garcia, Sam↗

Thermal vacuum chamber shroud performance with gaseous nitrogen cooling

The results are presented for calculations of shroud surface temperature for various flow rates of gaseous nitrogen through the liquid nitrogen shrouds of a large thermal vacuum chamber. The conditions imposed provide conservative bounds for Mars surface simulation inside the chamber during thermal testing of an appropriate test object. It is shown that the shroud surfaces seen by the object can be held within an acceptable temperature range by providing a reasonable flow of gaseous nitrogen to the shrouds at a reasonable pressure, and that no change to the present shroud system need be made which would affect its suitability for liquid nitrogen cooling.

Farmer, R. A.↗

Cleaning of a thermal vacuum chamber with shrouds in place

In February, 1991, a failure of a rotary booster pump caused the diffusion pumps to backstream into a 10 ft x 15 ft thermal vacuum chamber. Concerns existed about the difficulty of removing and reinstalling the shrouds without causing leaks. The time required for the shroud removal was also of concern. These concerns prompted us to attempt to clean the chamber without removing the shrouds.

Bond, William R.↗

Static Testing of A Conductively-Cooled, High Temperature Superconducting Rotor for A 1.4 MW Electric Machine in a Thermal Vacuum Chamber

NASA’s high efficiency megawatt motor (HEMM) is a partially superconducting, 1.4 MW electric machine designed for electrified aircraft propulsion. HEMM’s high performance is enabled by a field winding composed of 2nd generation high temperature superconducting (HTS) coils that are designed to operate at temperatures below 62 K. The superconducting rotor is conductively cooled to cryogenic temperatures using a rotating cryocooler embedded inside the machine’s shaft. This paper presents a static test of the full-scale superconducting rotor in a thermal vacuum chamber. The experimental setup is described in detail. Thermal and electromagnetic 3D finite element analyses of the experimental setup are shown along with a comparison of the model results to model results for HEMM. The thermal response during cool down from room temperature is discussed. Electrical measurements are presented for operation at different dc current excitations up to the rated current of the rotor (57.2 A) and temperature limit of the HEMM design (62 K). The results suggest that minor damage to one superconducting coil occurred at 50 A and 61.2 K, causing increased resistance in the system, but that the system could still be stably operated at 57.2 A and 62 K when conductively cooled by a cryocooler.

electrified aircraft propulsion↗

Sunspot: A program to model the behavior of hypervelocity impact damaged multilayer insulation in the Sunspot thermal vacuum chamber of Marshall Space Flight Center

The development of a computer program to predict the degradation of the insulating capabilities of the multilayer insulation (MLI) blanket of Space Station Freedom due to a hypervelocity impact with a space debris particle is described. A finite difference scheme is used for the calculations. The computer program was written in Microsoft BASIC. Also described is a test program that was undertaken to validate the numerical model. Twelve MLI specimens were impacted at hypervelocities with simulated debris particles using a light gas gun at Marshall Space Flight Center. The impact-damaged MLI specimens were then tested for insulating capability in the space environment of the Sunspot thermal vacuum chamber at MSFC. Two undamaged MLI specimens were also tested for comparison with the test results of the damaged specimens. The numerical model was found to adequately predict behavior of the MLI specimens in the Sunspot chamber. A parameter, called diameter ratio, was developed to relate the nominal MLI impact damage to the apparent (for thermal analysis purposes) impact damage based on the hypervelocity impact conditions of a specimen.

Rule, W. K.↗

Thermal Vacuum Chamber Demonstration of a Cryocooled, HTS Rotor for a 1.4 MW Electric Machine for Electrified Aircraft Propulsion

Aircraft with electrified propulsion systems require electric machines that are very lightweight and highly efficient. Advancements to the state of the art are required to meet this demand. This is particularly true for large transport aircraft with more than about 150 passengers, which will require electric machines with power ratings in the 1 to 30+ MW range. At this scale of power, superconducting technology becomes attractive for electrified aircraft propulsion to increase efficiency and reduce mass [1]. A mass reduction relative to non-superconducting machines can result from an increase in the specific power of the machine and indirectly through a significant reduction in the amount of waste heat generated on the aircraft, which reduces the mass of the thermal management system [2]. NASA’s high efficiency megawatt motor (HEMM) is a 1.4 MW partially superconducting machine that is being developed to achieve an efficiency greater than 98% and electromagnetic specific power greater than 16 kW/kg. HEMM contains a copper stator operating at an average temperature around 423 K and a superconducting rotor composed of no-insulation 2nd generation high temperature superconducting (HTS) coils that operates around 60 K. The superconducting coils are conductively cooled by a pulse tube cryocooler embedded inside and rotating with the rotor shaft. This paper presents a full-scale demonstration of the rotor in a thermal vacuum chamber at the designed operating temperature. The test was designed to validate the design of HEMM’s rotor, namely the ability to operate the 2G HTS coils at their rated direct current in a relevant thermal environment while being conductively cooled.

high temperature superconductors↗

Development of a Thermal Vacuum Chamber for Lunar Surface Simulation

Simulating the lunar surface environment is a critical component in advancing the Technology Readiness Level (TRL) of newly developed lunar surface exploration systems and understanding regolith dynamics. Developing systems with the ability to simulate the lunar surface environment presents unique challenges associated with both the hardware requirements of the system and the uniqueness of the lunar environment. Additionally, many thermal vacuum testing systems are large and expensive to maintain and operate, increasing the cost for the end users. Many low TRL prototypes are small-scale and low-cost, making it unfeasible and unnecessary to utilize larger scale testing facilities. A small-scale, modular, and easily reconfigurable chamber with a quick testing turnaround time could allow rapid TRL advancement with minimal costs and time commitments relative to many of the current testing facilities. Here, we introduce a thermal vacuum chamber system that will support experimentation and rapid testing and maturation of small-scale hardware systems and subsystems for lunar surface exploration.

Thermal Vacuum Chamber↗

Capabilities, Design, Construction and Commissioning of New Vibration, Acoustic, and Electromagnetic Capabilities Added to the World's Largest Thermal Vacuum Chamber at NASA's Space Power Facility

NASA s human space exploration plans developed under the Exploration System Architecture Studies in 2005 included a Crew Exploration Vehicle launched on an Ares I launch vehicle. The mass of the Crew Exploration Vehicle and trajectory of the Ares I coupled with the need to be able to abort across a large percentage of the trajectory generated unprecedented testing requirements. A future lunar lander added to projected test requirements. In 2006, the basic test plan for Orion was developed. It included several types of environment tests typical of spacecraft development programs. These included thermal-vacuum, electromagnetic interference, mechanical vibration, and acoustic tests. Because of the size of the vehicle and unprecedented acoustics, NASA conducted an extensive assessment of options for testing, and as result, chose to augment the Space Power Facility at NASA Plum Brook Station, of the John H. Glenn Research Center to provide the needed test capabilities. The augmentation included designing and building the World s highest mass capable vibration table, the highest power large acoustic chamber, and adaptation of the existing World s largest thermal vacuum chamber as a reverberant electromagnetic interference test chamber. These augmentations were accomplished from 2007 through early 2011. Acceptance testing began in Spring 2011 and will be completed in the Fall of 2011. This paper provides an overview of the capabilities, design, construction and acceptance of this extraordinary facility.

Motil, Susan M.↗

Thermal Vacuum Chamber Repressurization with Instrument Purging

At the conclusion of cryogenic vacuum testing of the James Webb Space Telescope Optical Telescope Element Integrated Science Instrument Module (JWST-OTIS) in NASA Johnson Space Center’s (JSCs) thermal vacuum (TV) Chamber A, contamination control (CC) engineers are postulating that chamber particulate material stirred up by the repressurization process may be kept from falling into the Integrated Science Instrument Module (ISIM) interior to some degree by activating instrument purge flows over some initial period before opening the chamber valves. This manuscript describes development of a series of models designed to describe this process. The models are strung together in tandem with a fictitious set of conditions to estimate overpressure evolution from which net outflow velocity behavior may be obtained. Creeping flow assumptions are then used to determine the maximum particle size that may be kept suspended above the ISIM aperture, keeping smaller particles from settling within the instrument module.

Repressurization↗