Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Apollo 16 time and motion study

A time and motion study is presented of astronaut lunar surface activity on Apollo 16 which consists of five distinct analyses: an evaluation of lunar mobility, a comparison of task performance in 1-g training and lunar EVA, a study of metabolic costs and adaptation, a discussion of falls, and retrieval of fallen objects. Two basic mobility patterns, the hop or canter and the traditional walking gait, were consistently utilized in longer traverses. The metabolic rates associated with these two mobility types, each used by a different astronaut, were relatively equivalent. The time to perform tasks on the lunar surface was significantly longer (on the order of 70%) than the time to perform the same tasks during the last 1-g training session. These results corroborated the findings on Apollo 15 and were not significantly different from them. There was general improvement in lunar EVA performance upon repetition of tasks. Metabolic rate (BTU/hr.) and metabolic cost (BTU) decreased over successive EVAs. Specifically, the metabolic rate associated with riding the lunar roving vehicle (LRV) decreased by approximately 18% from EVA 1 to EVA 2 and by 15% from EVA 2 to EVA 3.

Kubis, J. F.↗

Apollo 15 time and motion study

A time and motion study of Apollo 15 lunar surface activity led to examination of four distinct areas of crewmen activity. These areas are: an analysis of lunar mobility, a comparative analysis of tasks performed in 1-g training and lunar EVA, an analysis of the metabolic cost of two activities that are performed in several EVAs, and a fall/near-fall analysis. An analysis of mobility showed that the crewmen used three basic mobility patterns (modified walk, hop, side step) while on the lunar surface. These mobility patterns were utilized as adaptive modes to compensate for the uneven terrain and varied soil conditions that the crewmen encountered. A comparison of the time required to perform tasks at the final 1-g lunar EVA training sessions and the time required to perform the same task on the lunar surface indicates that, in almost all cases, it took significantly more time (on the order of 40%) to perform tasks on the moon. This increased time was observed even after extraneous factors (e.g., hardware difficulties) were factored out.

Kubis, J. F.↗

Skylab task and work performance /Experiment M-151 - Time and motion study/

The primary objective of Experiment M151 was to study the inflight adaptation of Skylab crewmen to a variety of task situations involving different types of activity. A parallel objective was to examine astronaut inflight performance for any behavioral stress effects associated with the working and living conditions of the Skylab environment. Training data provided the basis for comparison of preflight and inflight performance. Efficiency was evaluated through the adaptation function, namely, the relation of performance time over task trials. The results indicate that the initial changeover from preflight to inflight was accompanied by a substantial increase in performance time for most work and task activities. Equally important was the finding that crewmen adjusted rapidly to the weightless environment and became proficient in developing techniques with which to optimize task performance. By the end of the second inflight trial, most of the activities were performed almost as efficiently as on the last preflight trial. The analysis demonstrated the sensitivity of the adaptation function to differences in task and hardware configurations. The function was found to be more regular and less variable inflight than preflight. Translation and control of masses were accomplished easily and efficiently through the rapid development of the arms and legs as subtle guidance and restraint systems.

Kubis, J. F.↗

Task and work performance on Skylab missions 2, 3, and 4: Time and motion study: Experiment M151

Human task performance was evaluated under weightlessness conditions during long duration space flight in order to study the characteristics of the adaptation function. Results show that despite pronounced variability in training schedules and in initial reaction to the Skylab environment, in-flight task performance was relatively equivalent among Skylab crews, and behavioral performance continued to improve from beginning to end of all missions.

Kubis, J. F.↗

Timber Harvesting Economics in Early Commercial Thinning and Group Selection Prescriptions

Forest management decisions that consider both short- and long-term objectives are becoming more challenging and costly, due to market uncertainty, labor shortages, and the evolving forest industry. Under such unpredictable circumstances, a better understanding of the production economics of various silvicultural prescriptions is crucial in implementing sound forest management activities. The objectives of this study were to: a) estimate stump to landing productivity and cost for Early Commercial Thinning (ECT) and Group Selection (GS) prescriptions; and b) compare the harvest system cost ($/PMH) using machine rate and PATH (Planning and Analysis in Timber Harvesting) methods. Detailed time-motion studies were conducted in the spruce-fir forest of Northern Maine, USA, during the summer of 2019. The results, as expected, indicated the harvesting costs were 23% higher for ECT (21.08 $/m3) compared to GS (16.32 $/m3). The average productivity of the harvester and forwarder were reduced by 15 and 37%, respectively, for ECT compared to GS. The estimated harvesting system cost ($/PMH) was 4% higher as indicated by PATH compared to machine rate method. Higher operational productivity in GS can be attributed to the larger volume of logs, and shorter travel loaded distance than ECT. These findings can help forest managers make more informed decisions while implementing appropriate silvicultural prescriptions under varying conditions based on management objectives and market conditions.

Forestry↗

Study of modeling and evaluation of remote manipulation tasks with force feedback

The use of time and motion study methods to evaluate force feedback in remote manipulation tasks are described. Several systems of time measurement derived for industrial workers were studied and adapted for manipulator use. A task board incorporating a set of basic motions was designed and built. Results obtained from two subjects in three manipulation situations for each are reported: a force-reflective manipulator, a unilateral manipulator, and the unaided human hand. The results indicate that: (1) a time-and-motion study techniques are applicable to manipulation; and that (2) force feedback facilitates some motions (notably fitting), but not others (such as positioning).

Hill, J. W.↗

Observations and Lessons Learned From Installing Residential Roofing-Integrated Photovoltaics

Building-sited solar photovoltaics (PV) could play a key role in decarbonizing the building sector either through racked and mounted PV or through Building-integrated PV (BIPV). BIPV is installed into the building envelope itself, with solar cells and/or modules forming the outer layer of a building structure, thus transforming a single-purpose structure into one that serves the dual purposes of the building envelope and electricity. BIPV can be applied to building roofs, facades, awnings, pergolas, windows, skylights, balustrades, and other external surfaces. Given BIPV products vary widely, the focus of this research is residential roofing integrated PV (RIPV), where solar is incorporated into or otherwise replaces the roofing material. Previous research suggests that residential RIPV could reduce customer acquisition, labor, supply chain, and equipment costs. These products have yet to realize these cost savings and deployment remains significantly less than conventional rooftop PV as a relative share of the addressable market in the US. One potential barrier to broader residential roofing integrated PV deployment may be higher costs relative to conventional rooftop PV, primarily because the design and installation of these products is still evolving. Here, we explore residential RIPV cost-reduction opportunities by analyzing installation processes. Our study documents residential RIPV installations at 2 reroofing sites and the equivalent of 9 new construction sites in California through a methodology known as time and motion study. We also conducted interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration. Our time and motion study breaks the RIPV installation process into four steps: 1) staging, unloading, and roof preparation; 2) fire resistant underlayment(s) (synthetic material laid between roof shingles and roof deck); 3) flashings and PV installation; and 4) wiring and monitoring. We measure the time required for each step in terms of worker-hours, representing an hour of labor from a single worker. We further normalize process time by dividing worker-hours by kilowatt (kW) of system capacity. The most time-intensive step was flashings and PV installation, taking around 2.4 worker-hours per kW on average and accounting for around 60% of the process time for an average installation. The total installation process took on average about 6.4 and 3.5 worker-hours per kW at the reroofing sites and new construction sites, respectively. For comparison, a previous time and motion study documented a time of 6.9 worker-hours per kW for conventional rooftop PV. The shorter RIPV installation times are consistent with previous studies suggesting that RIPV could be installed faster than conventional rooftop PV. The time and motion results and feedback from interviewees provide insights into potential residential RIPV cost reduction opportunities. Several interviewees suggested that these products would be more efficient if PV installation was more fully integrated into the roofing/construction industries, which currently use separate supply chains and skillsets. Further integration could reduce supply chain delays and labor force redundancies. Future research could explore specific ways to integrate these industries to help realize the cost savings potential of RIPV.

14 SOLAR ENERGY↗

A human factors analysis of EVA time requirements

Human Factors Engineering (HFE), also known as Ergonomics, is a discipline whose goal is to engineer a safer, more efficient interface between humans and machines. HFE makes use of a wide range of tools and techniques to fulfill this goal. One of these tools is known as motion and time study, a technique used to develop time standards for given tasks. A human factors motion and time study was initiated with the goal of developing a database of EVA task times and a method of utilizing the database to predict how long an ExtraVehicular Activity (EVA) should take. Initial development relied on the EVA activities performed during the STS-61 mission (Hubble repair). The first step of the analysis was to become familiar with EVAs and with the previous studies and documents produced on EVAs. After reviewing these documents, an initial set of task primitives and task time modifiers was developed. Videotaped footage of STS-61 EVAs were analyzed using these primitives and task time modifiers. Data for two entire EVA missions and portions of several others, each with two EVA astronauts, was collected for analysis. Feedback from the analysis of the data will be used to further refine the primitives and task time modifiers used. Analysis of variance techniques for categorical data will be used to determine which factors may, individually or by interactions, effect the primitive times and how much of an effect they have.

Pate, D. W.↗

A Human Factors Analysis of EVA Time Requirements

Human Factors Engineering (HFE) is a discipline whose goal is to engineer a safer, more efficient interface between humans and machines. HFE makes use of a wide range of tools and techniques to fulfill this goal. One of these tools is known as motion and time study, a technique used to develop time standards for given tasks. During the summer of 1995, a human factors motion and time study was initiated with the goals of developing a database of EVA task times and developing a method of utilizing the database to predict how long an EVA should take. Initial development relied on the EVA activities performed during the STS-61 (Hubble) mission. The first step of the study was to become familiar with EVA's, the previous task-time studies, and documents produced on EVA's. After reviewing these documents, an initial set of task primitives and task-time modifiers was developed. Data was collected from videotaped footage of two entire STS-61 EVA missions and portions of several others, each with two EVA astronauts. Feedback from the analysis of the data was used to further refine the primitives and modifiers used. The project was continued during the summer of 1996, during which data on human errors was also collected and analyzed. Additional data from the STS-71 mission was also collected. Analysis of variance techniques for categorical data was used to determine which factors may affect the primitive times and how much of an effect they have. Probability distributions for the various task were also generated. Further analysis of the modifiers and interactions is planned.

Pate, Dennis W.↗

A time lag study of the vertical motion simulator computer system

A study was performed to evaluate an experimental method to determine time lags in real-time computer systems as the one associated with the Vertical Motion Simulator at Ames Research Center. The approach was to use an ordinary frequency analyzer to measure the phase difference between inputs and outputs of the computer system. The various elements of the program and computational architecture were modeled. Various factors, such as computer frame time and input frequency, were varied so that they were representative of the operational use of the simulator facilities. Experimentally determined results were compared with predictions derived from the simulation models. The results indicate that the frequency analyzer can be readily used to evaluate time lags in systems of this type. Differences between predicted and measured phase values indicate that the hardware and software imparts a time lag of about 5 msec to this facility.

Cleveland, W. B.↗

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)↗

Medical results of the Skylab program

The Skylab food system, waste management system, operational bioinstrumentation, personal hygiene provisions, in-flight medical support system, and the cardiovascular counterpressure garment worn during reentry are described. The medical experiments program provided scientific data and also served as the basis for real-time decisions on flight duration. Premission support, in-flight operational support, and postflight medical activities are surveyed. Measures devised to deal with possible food spoilage, medical instrument damage, and toxic atmosphere caused by the initial failures on the Orbital Workshop (OWS) are discussed. The major medical experiments performed in flight allowed the study of physiological changes as a function of exposure to weightless flight. The experiments included studies of the cardiovascular system, musculoskeletal and fluid/electrolyte balance, sleep, blood, vestibular system, and time and motion studies.

Johnston, R. S.↗

Next Generation Integrated PV Products Cost and Workflow Analysis (Final Report)

Residential photovoltaic (PV) costs have fallen consistently for over a decade (Ardani et al. 2018). DOE has subsequently developed a new residential PV cost target for 2030 of $0.05/kilowatt hour (SETO 2023). Ardani et al. (2018) conclude that integrated roofing and PV (RIPV) products may be key to achieving the residential target for both new construction and retrofit residential PV. In RIPV, the PV product is incorporated into or replaces the roofing material. RIPV systems can use conventional crystalline or thin-film technologies, may be aesthetically attractive alternatives to traditional racked and mounted PV systems, and may increase building property values (Cook et al. 2023). These products also have the potential to provide customer acquisition, labor, and equipment cost savings over traditional, racked and mounted residential rooftop PV and several companies have recently introduced integrated roofing and PV (RIPV) products (Cook et al. 2023). In 2022, Tesla was the market leader, representing 94% of RIPV capacity installed in 2022 through its Solar Roof offering, while GAF Energy and its Timberline Solar product was second capturing 3% (Feldman et al. 2023). In this project, NREL analyzed three research questions: (1) How do current RIPV products compare to racked and mounted PV in terms of costs, install times and processes? (2) How are RIPV products installed and are there opportunities for cost savings? (3) What are the key barriers to expanding market opportunities for integrating solar and roofing products? In this project, we explored residential RIPV cost reduction opportunities by analyzing installation processes. Our study documented residential RIPV installations at two reroofing sites (20.52 kilowatts) and the equivalent of nine new construction sites (71.75 kW) in California through a methodology known as time and motion study. We also conducted 15 interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration.

14 SOLAR ENERGY↗

Productivity and cost of energy chipping with non-integrated harvesting systems in the Coastal Plain of the US south

Research from the 1980s–2010s suggested that integrated harvesting systems that harvest conventional products (e.g., sawtimber, pulpwood) and energy chips simultaneously were the most effective solution to produce energy chips in the US South. Alternatives, such as biomass-only systems, have important advantages in forest stands with low volumes of merchantable timber. The goal of this study was to estimate the productivity and cost of producing energy chips using non-integrated systems. Innovative chipping contractors using non-integrated systems were identified through contacts with procurement foresters responsible for purchasing energy chips. Elemental time-and-motion studies were conducted to estimate harvesting productivity on five operations, including one clearcut harvest and four first thinnings in overstocked stands. The hourly cost of equipment was estimated using the machine rate method. Cost per tonne was estimated by combining hourly productivity and hourly costs in a modified version of the Auburn Harvesting Analyzer. System productivity averaged 37 tonnes per scheduled machine hour (smh) and cut-and-haul costs averaged $33.86 t −1 (USD), which was comparable to previous estimates from integrated systems. In conclusion, this study suggests there are viable alternatives to integrated harvesting systems to produce energy chips, especially in stands with low volumes of merchantable timber.

09 BIOMASS FUELS↗

Refurbishment cost study of the thermal protection system of a space shuttle vehicle, phase 2

Labor costs and techniques associated with the refurbishment of representative TPS and their attach concepts suitable for space shuttle application have been identified on the basis of experimental tests. Ablative and reusable surface insulation TPS configurations were designed, fabricated, and tested on a full-scale mockup. The TPS attachment methods investigated included pi-strap, multiple mechanical fasteners, key/keyway, and direct bond concepts. Techniques for performing installation, inspection, repair and replacement of TPS components were studied by examining a variety of shop procedures. Major problem areas associated with these procedures and the designs to which they were applied were analyzed for several significant parameters such as handling, gaskets between joints, repair techniques, ablator plugs, etc. Results of time and motion studies of specific maintenance tasks, simulating operational procedures, were obtained. Using these data, refurbishment labor cost projections were generated for a representative Space Shuttle orbiter.

Haas, D. W.↗

Refurbishment cost study of the thermal protection system of a space shuttle vehicle, phase 2

The labor costs and techniques associated with the refurbishment and maintenance of representative thermal protection system (TPS) components and their attachment concepts suitable for space shuttle application are defined, characterized, and evaluated from the results of an experimental test program. This program consisted of designing selected TPS concepts, fabricating and assembling test hardware, and performing a time and motion study of specific maintenance functions of the test hardware on a full-scale- mockup. Labor requirements and refurbishment techniques, as they relate to the maintenance functions of inspection, repair, removal, and replacement were identified.

Haas, D. W.↗

Productivity and Cost of Post-Tornado Salvage Logging in Upper Coastal Plain of South Carolina, USA

Salvage harvesting is common in the US South following natural disasters such as tornadoes and hurricanes; nevertheless, few studies have evaluated the productivity and costs of these harvests because of their geographic dispersion and the short interval between natural disasters and salvage harvesting. An Enhanced Fujita Scale 3 (EF3) tornado with winds in excess of 250 km per hour struck Aiken County, South Carolina in April of 2020, uprooting trees and severing other stems above breast height. The goal of this study was to estimate the productivity and cost of salvage harvesting in loblolly pine (Pinus taeda L.) stands following severe tornado damage. Salvage harvests were conducted with a rubber-tired drive-to-tree feller-buncher, grapple skidder, tracked loader, and chipper. All stems were chipped and used to produce energy; no roundwood was produced from the harvests. Elemental time-and-motion studies were conducted in three pulpwood-sized stands (<30 cm large-end diameter) and three sawtimber-sized stands (≥30 cm large-end diameter). Hourly harvesting costs were estimated using the machine rate method and per-ton costs were estimated using a modified version of the Auburn Harvesting Analyzer. Skidding productivity was low in each harvest unit, but especially so in the three pulpwood-sized stands because of stem breakage and low weight per stem. Harvesting costs averaged $\$$29.78 and $\$$19.97 (USD) per tonne (onboard truck) in the pulpwood- and sawtimber-sized stands, respectively. High salvage harvesting costs mean that landowners can expect significantly reduced stumpage prices from these harvests; nonetheless, landowners do benefit from reduced reforestation costs. Harvesting promptly after a tornado can reduce harvesting costs and increase timber value recovery.

60 APPLIED LIFE SCIENCES↗