Search NASA⌕ Search

SEARCH · Search NASA

Results for “transit fleet”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluation of Flight Attendant Technical Knowledge

Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or lessen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research indicates that flight attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports. Chute and Wiener describe five factors which may produce communication barriers between cockpit and cabin crews: the historical background of aviation, the physical separation of the two crews, psychosocial issues, regulatory factors, and organizational factors. By examining these areas of division we can identify possible bridges and address the implications of deficient cockpit/cabin communication on flight safety. Flight attendant operational knowledge may provide some mitigation of these barriers. The present study explored both flight attendant technical knowledge and flight attendant and pilot expectations of flight attendant technical knowledge. To assess the technical knowledge of cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily completed a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendant operational knowledge and pilots' and flight attendants' expected and desired levels of technical knowledge. Implications for training will be discussed.

Dunbar, Melisa G.↗

Evaluation of Cabin Crew Technical Knowledge

Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or essen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research (Chute & Wiener, 1996) indicates that light attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports (National Transportation Safety Board, 1992; Transportation Safety Board of Canada, 1995; Chute & Wiener, 1996). The present study explored both flight attendant technical knowledge and flight attendant and dot expectations of flight attendant technical knowledge. To assess the technical knowledge if cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily :ompleted a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendants.

Dunbar, Melisa G.↗

Cyber Physical Security (CPS) Extension to Air Traffic Management (ATM) Testbed

The Air Traffic Management (ATM) Testbed is being developed at NASA to enable benefit, impact, safety and cost assessments for accelerating the deployment of Concept and Technologies (C&T) in the National Airspace System (NAS). Today, C&T introduction into the NAS takes decades. The primary reason for this is an inability to assess the operational impact of the interaction between the proposed C&T and operationally deployed systems (Realistic Technologies) in terms of NAS-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airline fleet operations. Transition of C&T to operations requires mathematical modeling and simulation, Human-in-the-Loop (HITL) testing and shadow-mode evaluation driven by operational data. Whereas interaction with the operational system during testing and stages of deployment is not permissible due to safety concerns, it is certainly possible to create a simulation environment that closely mimics the NAS using the same operational systems/hardware for enabling such assessments. This presentation focuses on a proposed Cyber Physical Security extension to the ATM Testbed for creating a modeling and simulation architecture to study how well the Air Traffic Management system will perform and analyze effectiveness of mitigating security measures against particular cyber-attack scenarios.

Datta, Koushik↗

Tug fleet and ground operations schedules and controls. Volume 2: part 1

This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

Source record↗

Learning About Cockpit Automation: From Piston Trainer to Jet Transport

Two experiments explored the idea of providing cockpit automation training to airline-bound student pilots using cockpit automation equipment commonly found in small training airplanes. In a first experiment, pilots mastered a set of tasks and maneuvers using a GPS navigation computer, autopilot, and flight director system installed in a small training airplane Students were then tested on their ability to complete a similar set of tasks using the cockpit automation system found in a popular jet transport aircraft. Pilot were able to successfully complete 77% of all tasks in the jet transport on their first attempt. An analysis of a control group suggests that the pilot's success was attributable to the application of automation principles they had learned in the small airplane. A second experiment looked at two different ways of delivering small-aeroplane cockpit automation training: a self-study method, and a dual instruction method. The results showed a slight advantage for the self-study method. Overall, the results of the two studies cast a strong vote for the incorporation of cockpit automation training in curricula designed for pilot who will later transition to the jet fleet.

Casner, Stephen M.↗

Transition to Glass: Pilot Training for High-Technology Transport Aircraft

This report examines the activities of a major commercial air carrier between 1993 and late 1996 as it acquired an advanced fleet of high-technology aircraft (Boeing 757). Previously, the airline's fleet consisted of traditional (non-glass) aircraft, and this report examines the transition from a traditional fleet to a glass one. A total of 150 pilots who were entering the B-757 transition training volunteered for the study, which consisted of three query phases: (1) first day of transition training, (2) 3 to 4 months after transition training, and (3) 12 to 14 months after initial operating experience. Of these initial 150 pilots, 99 completed all three phases of the study, with each phase consisting of probes on attitudes and experiences associated with their training and eventual transition to flying the line. In addition to the three questionnaires, 20 in-depth interviews were conducted. Although the primary focus of this study was on the flight training program, additional factors such as technical support, documentation, and training aids were investigated as well. The findings generally indicate that the pilot volunteers were highly motivated and very enthusiastic about their training program. In addition, the group had low levels of apprehension toward automation and expressed a high degree of satisfaction toward their training. However, there were some concerns expressed regarding the deficiencies in some of the training aids and lack of a free-play flight management system training device.

Wiener, Earl L.↗

Incorporation of EGPWS in the NASA Ames Research Center 747-400 Flight Simulator

The NASA Ames Research Center CAE Boeing 747300 flight simulator is used primarily for the study of human factors in aviation safety. The simulator is constantly upgraded to maintain a configuration match to a specific United Airlines aircraft and maintains the highest level of FAA certification to ensure credibility to the results of research programs. United's 747-400 fleet and hence the simulator are transitioning from the older Ground Proximity Warning System (GPWS) to the state-of-the-art Enhanced Ground Proximity Warning System (EGPWS). GPWS was an early attempt to reduce or eliminate Controlled Flight Into Terrain (CFIT). Basic GPWS alerting modes include: excessive descent rate, excessive terrain closure rate, altitude loss after takeoff, unsafe terrain clearance, excessive deviation below glideslope, advisory callouts and windshear alerting. However, since GPWS uses the radar altimeter which looks straight down, ample warning is not always provided. EGPWS retains all of the basic functions of GPWS but adds the ability to look ahead by comparing the aircraft position to an internal database and provide additional alerting and display capabilities. This paper evaluates three methods of incorporating EGPWS in the simulator and describes the implementation and architecture of the preferred option.

Sallant, Ghislain↗

Validation and Verification of Future Integrated Safety-Critical Systems Operating under Off-Nominal Conditions

Loss of control remains one of the largest contributors to aircraft fatal accidents worldwide. Aircraft loss-of-control accidents are highly complex in that they can result from numerous causal and contributing factors acting alone or (more often) in combination. Hence, there is no single intervention strategy to prevent these accidents and reducing them will require a holistic integrated intervention capability. Future onboard integrated system technologies developed for preventing loss of vehicle control accidents must be able to assure safe operation under the associated off-nominal conditions. The transition of these technologies into the commercial fleet will require their extensive validation and verification (V and V) and ultimate certification. The V and V of complex integrated systems poses major nontrivial technical challenges particularly for safety-critical operation under highly off-nominal conditions associated with aircraft loss-of-control events. This paper summarizes the V and V problem and presents a proposed process that could be applied to complex integrated safety-critical systems developed for preventing aircraft loss-of-control accidents. A summary of recent research accomplishments in this effort is also provided.

Belcastro, Christine M.↗

Validation and Verification (V&V) of Safety-Critical Systems Operating Under Off-Nominal Conditions

Loss of control (LOC) remains one of the largest contributors to aircraft fatal accidents worldwide. Aircraft LOC accidents are highly complex in that they can result from numerous causal and contributing factors acting alone or more often in combination. Hence, there is no single intervention strategy to prevent these accidents. Research is underway at the National Aeronautics and Space Administration (NASA) in the development of advanced onboard system technologies for preventing or recovering from loss of vehicle control and for assuring safe operation under off-nominal conditions associated with aircraft LOC accidents. The transition of these technologies into the commercial fleet will require their extensive validation and verification (V&V) and ultimate certification. The V&V of complex integrated systems poses highly significant technical challenges and is the subject of a parallel research effort at NASA. This chapter summarizes the V&V problem and presents a proposed process that could be applied to complex integrated safety-critical systems developed for preventing aircraft LOC accidents. A summary of recent research accomplishments in this effort is referenced.

Belcastro, Christine M.↗

Bootstrapping Multi-Agent Unmanned Aerial Vehicle (UAV) System Integration Using Ground-Based Assets: Lessons Learned

The highly dynamic nature of UAVs imposes significant challenges when conducting initial testing ranging from safety risks posed by high-capacity lithium batteries and spinning propellers to rigorous timing demands on controllers and the consequences of failures mid-air. Flight testing of a single vehicle is time and labor intensive due to these challenges and more, and the complexity increases exponentially with the number of vehicles. While simulations and hardware-in-the-loop bench testing can provide adequate environments for preliminary validation, differences in system deployment architecture, software interfaces, and hardware infrastructure between simulation and a fleet of real UAVs create a sizable gap that must be navigated carefully during system integration. In support of the Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) project, which had the goal of establishing a basis of certification of trust and trustworthiness in multi-agent autonomous systems, this gap was tackled from two directions. First, a novel mixed-reality simulation environment was engineered to blur the transition from simulation to flight hardware. Second, a fleet of Unmanned Surface Vehicles (USVs) was developed as a test and evaluation platform that more closely represented the final aerial fleet while eliminating many of the risks associated with air vehicles. This paper delves into the second element, analyzing the efficacy of the USV platform in performing system integration testing for the UAV system. In this paper we present the USV fleet and its role in reducing the aforementioned gaps in deployment architecture, software interfaces, and hardware infrastructure when moving from simulation to flight. An overview of the hardware and software onboard the vehicles will be provided along with supporting infrastructure. The system integration process will be documented including results in supporting both the overarching design reference mission (DRM) of ATTRACTOR and individual research efforts conducted during the project. Finally, we will discuss some of the practical lessons learned regarding the testing, deployment, and operation of multi-agent autonomous systems.

Matthew P Vaughan↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Bootstrapping Multi-Agent Unmanned Aerial Vehicle (UAV) System Integration Using Ground-Based Assets: Lessons Learned

In support of the Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) project, a fleet of unmanned ground vehicles (UGVs) was developed as a test and evaluation (T\&E) platform to reduce system integration gaps between simulation and live flight hardware. While simulation and hardware-in-the-loop bench testing provide adequate environments for preliminary validation, differences in system deployment architecture, software interfaces, and hardware infrastructure increase the risks to safety, property, and the project. Given ATTRACTOR’s goal of establishing a basis of certification of trust and trustworthiness in multi-agent autonomous systems, bridging these gaps was critical to successful project execution and feasibility assessment. In this paper we present the UGV fleet and its role in speeding up system integration, smoothing the transition from simulation to flight, and providing researchers an easy-to-use hardware test bed. An overview of the hardware and software on-board the vehicles is provided along with supporting infrastructure. The system integration process is documented including results in supporting both the overarching design reference mission (DRM) of ATTRACTOR and individual research efforts conducted since the creation of the fleet. Finally, we discuss the practical lessons learned regarding the testing, deployment, and operation of multi-agent autonomous systems.

Matthew P. Vaughan↗

NASA Tech Briefs, January 2009

Tech Briefs are short announcements of innovations originating from research and development activities of the National Aeronautics and Space Administration. They emphasize information considered likely to be transferable across industrial, regional, or disciplinary lines and are issued to encourage commercial application. Topics covered include: The Radio Frequency Health Node Wireless Sensor System; Effects of Temperature on Polymer/Carbon Chemical Sensors; Small CO2 Sensors Operate at Lower Temperature; Tele-Supervised Adaptive Ocean Sensor Fleet; Synthesis of Submillimeter Radiation for Spectroscopy; 100-GHz Phase Switch/Mixer Containing a Slot-Line Transition; Generating Ka-Band Signals Using an X-Band Vector Modulator; SiC Optically Modulated Field-Effect Transistor; Submillimeter-Wave Amplifier Module with Integrated Waveguide Transitions; Metrology System for a Large, Somewhat Flexible Telescope; Economical Implementation of a Filter Engine in an FPGA; Improved Joining of Metal Components to Composite Structures; Machined Titanium Heat-Pipe Wick Structure; Gadolinia-Doped Ceria Cathodes for Electrolysis of CO2; Utilizing Ocean Thermal Energy in a Submarine Robot; Fuel-Cell Power Systems Incorporating Mg-Based H2 Generators; Alternative OTEC Scheme for a Submarine Robot; Sensitive, Rapid Detection of Bacterial Spores; Adenosine Monophosphate-Based Detection of Bacterial Spores; Silicon Microleaks for Inlets of Mass Spectrometers; CGH Figure Testing of Aspherical Mirrors in Cold Vacuums; Series-Coupled Pairs of Silica Microresonators; Precise Stabilization of the Optical Frequency of WGMRs; Formation Flying of Components of a Large Space Telescope; Laser Metrology Heterodyne Phase-Locked Loop; Spatial Modulation Improves Performance in CTIS; High-Performance Algorithm for Solving the Diagnosis Problem; Truncation Depth Rule-of-Thumb for Convolutional Codes; Efficient Method for Optimizing Placement of Sensors.

Source record↗

Commercial Development Plan for the International Space Station

The long term objective is to establish the foundation for a marketplace and stimulate a national economy for space products and services in low-Earth orbit, where both demand and supply are dominated by the private sector. The short term objective is to begin the transition to private investment and offset a share of the public cost for operating the space shuttle fleet and space station through commercial enterprise in open markets.

Source record↗

Commercial Development Plan for the International Space Station

The long term objective of the development plan for the International Space Station (ISS) is to establish the foundation for a marketplace and stimulate a national economy for space products and services in low-Earth orbit, where both demand and supply are dominated by the private sector. The short term objective is to begin the transition to private investment and offset a share of the public cost for operating the space shuttle fleet and space station through commercial enterprise in open markets.

Source record↗

Effect of Airspace Characteristics on Urban Air Mobility Airspace Capacity

As interest in urban air mobility grows, increasingly high density traffic poses a challenge for the transition to safe, efficient, and timely operations. Hundreds of simultaneously demanded flights will need to share the same fleet, infrastructure, and constrained airspace. This paper investigates the feasibility of effectively managing high density traffic in congested urban environments by optimizing the design of airspace route structures. Demand estimations for the Dallas-Fort Worth and Los Angeles areas are used to evaluate potential improvements to airspace route design with the goal to accommodate the projected level of demand.

Urban Air Mobility↗

Effect of Airspace Characteristics on Urban Air Mobility Airspace Capacity

As interest in urban air mobility grows, increasingly high density traffic poses a challenge for the transition to safe, efficient, and timely operations. Hundreds of simultaneously demanded flights will need to share the same fleet, infrastructure, and constrained airspace. This paper investigates the feasibility of effectively managing high density traffic in congested urban environments by optimizing the design of airspace route structures. Demand estimations for the Dallas-Fort Worth and Los Angeles areas are used to evaluate potential improvements to airspace route design with the goal to accommodate the projected level of demand.

Urban Air Mobility↗

Understanding Workforce Agility at NASA Kennedy Space Center

NASA leads the world in space research and provides other government agencies, educational institutions, and companies opportunities to explore, launch, and conduct research in and around space. NASA has 11 formal locations based around the United States, and each has different goals and objectives to help NASA meet its overall mission. 2004, President George Bush announced a new vision for the Space Exploration program. During his grand announcement, he discussed that the Space Shuttles would retire due to the 2003 Space Shuttle Columbia accident, where the crew and the space vehicle were lost. The Kennedy Space Center (KSC) would no longer manage the day-to-day operations of maintaining the US Space Shuttle fleet. Our NASA teams would continue working to finish the Space Shuttle program's mission to build the International Space Station. Afterward, NASA would transition to develop and test a new spacecraft, the Crew Exploration Vehicle. The third goal was to return to the moon by 2020 as the launching point for missions beyond, to get humans from lower Earth orbit to the moon and Mars. (Secretary, 2004) The KSC engineering workforce had to prepare to transition from Operational support of the Space Shuttle program to the design and development of over 50 subsystems for the future SLS and Orion Launch Systems at the Kennedy Space Center. These subsystems developed at the Kennedy Space Center Engineering Directorate followed a comprehensive design process that required several different product deliverables during various phases for each subsystem. (Schafer et al., 2013) What allowed these systems to be successful? What enabled NASA KSC to complete over 130 Artemis 1 Design Certification and System Acceptance Reviews, closing over 21,656 Requirements to deem the Artemis 1 rocket ready for launch? Little is known about the NASA engineering workforce agility characteristics that enabled the organization to transition from the Space Shuttle program that ended in 2011 and launch the Artemis Program's SLS rocket on November 16, 2022.

Workforce Agility↗