Search NASA⌕ Search

SEARCH · Search NASA

Results for “transmission planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

OPALS: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS

In spring 2014, the Optical PAyload for Lasercomm Science (OPALS) will launch to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a 90-day baseline mission, OPALS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) in Wrightwood, California. To achieve mission success, interfaces to the ISS payload operations infrastructure are established. For OPALS, the interfaces facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes such as pointing prediction and data processing satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The tests have provided valuable insight into operational considerations on the ISS.

Abrahamson, Matthew J.↗

Opals: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS

In April of 2014, the Optical PAyload for Lasercomm Science (OPALS) Flight System (FS) launched to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a planned 90-day baseline mission, the OPALS FS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) ground station in Wrightwood, California. Interfaces to the ISS payload operations infrastructure have been established to facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes, such as pointing prediction and data processing, satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The ORTs have provided valuable insight into operational considerations for the instrument on the ISS.

Technology Demonstration↗

Advanced communications technology satellite high burst rate link evaluation terminal communication protocol software user's guide, version 1.0

The Communication Protocol Software was developed at the NASA Lewis Research Center to support the Advanced Communications Technology Satellite High Burst Rate Link Evaluation Terminal (ACTS HBR-LET). The HBR-LET is an experimenters terminal to communicate with the ACTS for various experiments by government, university, and industry agencies. The Communication Protocol Software is one segment of the Control and Performance Monitor (C&PM) Software system of the HBR-LET. The Communication Protocol Software allows users to control and configure the Intermediate Frequency Switch Matrix (IFSM) on board the ACTS to yield a desired path through the spacecraft payload. Besides IFSM control, the C&PM Software System is also responsible for instrument control during HBR-LET experiments, uplink power control of the HBR-LET to demonstrate power augmentation during signal fade events, and data display. The Communication Protocol Software User's Guide, Version 1.0 (NASA CR-189162) outlines the commands and procedures to install and operate the Communication Protocol Software. Configuration files used to control the IFSM, operator commands, and error recovery procedures are discussed. The Communication Protocol Software Maintenance Manual, Version 1.0 (NASA CR-189163, to be published) is a programmer's guide to the Communication Protocol Software. This manual details the current implementation of the software from a technical perspective. Included is an overview of the Communication Protocol Software, computer algorithms, format representations, and computer hardware configuration. The Communication Protocol Software Test Plan (NASA CR-189164, to be published) provides a step-by-step procedure to verify the operation of the software. Included in the Test Plan is command transmission, telemetry reception, error detection, and error recovery procedures.

Reinhart, Richard C.↗

The Mars Exploration Rover/Collaborative Information Portal

Astrology has long argued that the alignment of the planets governs human affairs. Science usually scoffs at this. There is, however, an important exception: sending spacecraft for planetary exploration. In late May and early June, 2003, Mars will be in position for Earth launch. Two Mars Exploration Rovers (MER) will rocket towards the red planet. The rovers will perform a series of geological and meteorological experiments, seeking to examine geological evidence for water and conditions once favorable for life. Back on earth, a small army of surface operations staff will work to keep the rovers running, sending directions for each day's operations and receiving the files encoding the outputs of the Rover's six instruments. (Mars is twenty light minutes from Earth. The rovers must be robots.) The fundamental purpose of the project is, after all, Science. Scientists have experiments they want to run. Ideally, scientists want to be immediately notified when the data products of their experiments have been received, so that they can examine their data and (collaboratively) deduce results. Mars is an unpredictable environment. We may issue commands to the rovers but there is considerable uncertainty in how the commands will be executed and whether what the rovers sense will be worthy of further pursuit. The steps of what is, to a scientist, conceptually an individual experiment may be scattered over a large number of activities. While the scientific staff has an overall strategic idea of what it would like to accomplish, activities are planned daily. The data and surprises of the previous day need to be integrated into the negotiations for the next day's activities, all synchronized to a schedule of transmission windows . Negotiations is the operative term, as different scientists want the resources to run possibly incompatible experiments. Many meetings plan each day's activities.

Walton, Joan↗

Enabling Communication Between Astronauts and Ground Teams for Space Exploration Missions

Over the last four years, Playbook’s Mission Log has evolved to become an enabling capability for analog missions that simulate deep space, exploration missions with communication transmission latency. Playbook is a planning and execution web-application for mission operations, aggregating multiple sources of information for astronauts to execute the mission in one place: timeline, procedures, chat interface. Playbook’s Mission Log provides a multimedia chat software interface with unique features and functionalities that support asynchronous communication between analog astronauts and ground support teams. This paper describes the iterative design the Mission Log has undergone based on user observations and solicited feedback. Key features include indicators that help users cope with asynchronous communication as well as aids that assist teams coordinate work. Future work and capabilities are outlined, which build upon the increased use of the Mission Log as a communication and coordination tool for space exploration.

communication↗

The Last Orbit: Planning Cassini's Plummet into Saturn

Cassini’s final orbit around Saturn will culminate in a dramatic ending as the spacecraft plunges into the ringed planet’s atmosphere, never to escape or be heard from again. The last hours of the mission prior to the final loss of signal have some of the most unique and valuable science to date. Cassini will take a unique trajectory to dive deep into the atmosphere on its approach to final disposal and no spacecraft, Cassini included, has entered these depths of Saturn’s atmosphere. The science community has placed heavy emphasis onthis once-in-a-lifetime opportunity to inspect these deeper regions of Saturn’s atmosphere. The Cassini project specifically aims to collect the very last bits of data during the final plunge to get samples of the deepest regions before the spacecraft is lost forever. The desire to collect the final bits of data presents several challenges. Cassini’s Mission Planning (MP) team has developed an End of Mission (EOM) scenario to tackle these demands. The EOM scenario outlines the framework for the entire last orbit of the mission and details thestrategy for data collection and transmission. Attaining near real-time transmission is key for the acquisition of the very last bits of data. The Cassini spacecraft will use a new mode of operations to successfully achieve this real-time transmission. In addition to this primary investigation and planning for telecommunications, key risks have been studied within the realm of the last orbit. Ultimately, this paper shows how the Cassini Project plans to ensurethe return of every last bit of data before the spacecraft is consumed by Saturn forever.

Bittner, Molly E.↗

Timing in private digital telecommunication networks

For proper operation of today's large digital private networks, high quality synchronization must be achieved. A general telecommunication performance objective is to maintain long-term frequency accuracy of ten parts per trillion at all synchronous digital equipment in the network. Many times, however, this is not achieved in private networks. Low quality clocks, errored transmission facilities, and incorrectly designed synchronization plans are often cause for poor performance. It is shown that properly-designed private networks can operate with long term frequency averages between ten parts per trillion to ten parts per million. These performance levels can adversely impact customer applications. The most demanding applications are digital and voice band data, encrypted voice, facsimile, and video. In a typical private network operating at 0.01 parts per million, the user would experience reduced data throughput, dropped encrypted calls, unreadable facsimile pages, or interrupted video transmission dozens of times per day. The major contribution to poor private network synchronization performance is the interaction of Customer Premises Equipment (CPE) clocks and the network facilities used to distribute timing. The performance of typical CPE clocks and facilities, and their impact on customer applications, are discussed. CPE clock performance issues, along with private network architectural constraints, make synchronization planning extremely difficult. Planning is usually costly and requires specialized expertise.

Abate, J. E.↗

Study of utilization of advanced composites in fuselage structures of large transports

The effort required by the transport aircraft manufacturers to support the introduction of advanced composite materials into the fuselage structure of future commercial and military transport aircraft is investigated. Technology issues, potential benefits to military life cycle costs and commercial operating costs, and development plans are examined. The most urgent technology issues defined are impact dynamics, acoustic transmission, pressure containment and damage tolerance, post-buckling, cutouts, and joints and splices. A technology demonstration program is defined and a rough cost and schedule identified. The fabrication and test of a full-scale fuselage barrel section is presented. Commercial and military benefits are identified. Fuselage structure weight savings from use of advanced composites are 16.4 percent for the commercial and 21.8 percent for the military. For the all-composite airplanes the savings are 26 percent and 29 percent, respectively. Commercial/operating costs are reduced by 5 percent for the all-composite airplane and military life cycle costs by 10 percent.

Jackson, A. C.↗

Joint ASRS and NASA Callback on FANS-1 Datalink Operational Incidents

The recent certification and implementation of the Future Air Navigation System (FANS- 1) was based on the benefits of reduced separation minima, ability to optimize flight plans enroute, and the prompt transmission and reception of messages between oceanic controllers and 747-400 aircraft transiting the Pacific. In addition, FANS was intended to supersede High Frequency (HF) radio which has been the staple, yet problematic, long distance communication link for years. However, in the three initial years of operation, FANS has revealed its own unique operational issues. Although some technical and engineering problems have been studied and addressed, little research has been conducted on human factors issues associated with the use of FANS on the flight deck. This lack of prior data on the operational use of FANS prompted a joint NASA/Aviation Safety Reporting System (ASRS) inquiry into FANS datalink. In addition, two foreign air carriers and their respective safety agencies were recruited to participate. This international FANS research effort consisting of three aviation safety agencies and three international commercial air-carriers has provided a unique opportunity for conducting human factors research in an operational environment. An ASRS 'callback' format was chosen for the study as a practical and viable method for capturing FANS events on the flight deck. Initially, 747-400 pilots were encouraged to submit reports to their respective safety agencies if they had experienced any positive or negative incidents with the use of FANS. Upon receipt of a report, it was evaluated and if deemed pertinent to the study, a telephone interview or 'callback' was conducted on the FANS incident to elicit further details, capture the key events, and gather contextual information. Once the operational data collection phase was completed, the reports and interviews were analyzed with two purposes in mind: primarily to identify and address problematic human factors issues with current FANS technology, and, secondarily, to provide 'lessons learned' for future datalink systems and implementation.

Moses, John↗

Results of tests at Goonhilly using the experimental communication satellites Telstar I and Telstar II

The first active communication satellite-Telstar I-was launched from Cape Canaveral by the National Aeronautics and Space Administration (NASA) on 10th July, 1962, and was later followed by Relay and Telstar II. Since the 10th July, 1962, many tests and demonstrations of television, multichannel telephony and telegraphy, facsimile and data transmission have been made via these experimental satellites. In addition, much data has been accumulated on microwave propagation, earth-station receiving system noise temperatures and satellite tracking accuracy. Such tests and data will be of considerable value for the planning and design of future operational communication-satellite systems.

GROUND STATION↗

Lewis Investigates Frequency Sharing Between Future NASA Space Systems and Local Multipoint Distribution Systems in the 27-GHz Band

At the request of the Federal Communications Commission (FCC), the NASA Lewis Research Center undertook an intensive study to examine the feasibility of frequency sharing between future NASA space services and proposed Local Multipoint Distribution Systems (LMDS) in the 25.25- to 27.5-GHz band. This follows NASA's earlier involvement in the FCC's 1994 Negotiated Rule Making Committee which studied frequency sharing between Ka-band Fixed Satellite Services and LMDS in the 27.5- to 29.5-GHz band. LMDS is a terrestrial, cellular, wireless communication service primarily intended to provide television distribution from hub stations located within relatively small cells to fixed subscriber receivers. Some proposed systems, however, also plan to offer interactive services via subscriber-to-hub transmissions. LMDS providers anticipate that their systems will be a cost-effective alternative to cable television systems, especially in urban areas. LMDS proponents have expressed an interest in using frequencies below 27.5 GHz. NASA, however, plans to operate three types of space systems below 27.5 GHz. The H, I, and J follow-on satellites for the Tracking and Data Relay Satellite System (TDRSS), which are planned for launch beginning in 1999, are designed to receive high-data-rate transmissions (up to 800 Mbps) from low-Earth orbiting "user" spacecraft in the 25.25- to 27.5-GHz band. In this case, the potential interference is the aggregate interference from LMDS transmitters (both hubs and subscribers) into the TDRSS tracking receive beams as they sweep over the Earth's surface while tracking lower altitude user spacecraft.

Source record↗

Solar power satellite system definition study, phase 2. Part 1: Midterm briefing

An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.

Source record↗

Utilization of the International Space Station for Crew Autonomous Scheduling Test (CAST)

The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This paper presents the results from a single astronaut test subject who participated in five CAST sessions. The details on the operational philosophy of CAST are discussed, including the approach to crew training, selection criteria for test days, and data collection methods. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers. It is hoped the results of this investigation will guide NASA's implementation of autonomous mission operations for long duration human space missions to Mars and beyond.

Healy, Matthew↗

Progress of Crew Autonomous Scheduling Test (CAST) On the ISS

The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This presentation shows the progress done in this study with a single astronaut test subject participating in five CAST sessions. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers.

Healy, Matthew↗

AI and Autonomy Initiatives for NASA’s Deep Space Network (DSN)

NASA’s Deep Space Network (DSN) consists of thirteen large (34- and 70-meter) antennas that are used to communicate with approximately 40 NASA and partner spacecraft, all at great distance from the earth (generally at Lunar distances and beyond). The DSN has a long history — over 50 years — and has evolved with cutting edge, often custom, telecommunications equipment and associated software systems. In recent years, and in preparation for an increasing future demand, there has been an effort to invest in initiatives that will result in significant cost savings in the future. These efforts are building on, or augmenting, the recent deployment of “Follow-the-Sun” operations (day shift remote operational control of the entire network from each of the three antenna complexes in turn) — which is being deployed in 2017. This paper focuses on Adaptive Demand Access: in a paradigm shift from completely pre-planned operations, this concept calls for spacecraft to signal their intent (or not) for near-future contacts, in case they have science results of interest, or have experienced an anomaly. This would take advantage of a beacon tone transmission, which can be detected using smaller antennas. When a connection request is received, the DSN ground systems would adaptively accommodate the request, inserting the contact into the plan as soon as possible, subject to constraints and priorities. The demand access concept incorporates onboard data analysis and science data processing, so that beacon tones can be generated with maximum information. This area is representative of several where infusing AI technologies can lead to improved effectiveness of the DSN as the network readies for support of expanded Mars exploration efforts in the 2020’s and beyond.

Wyatt, E. Jay↗

The 20 and 30 GHz communications system for the ATS-F millimeter wave experiment.

The first space communications system operating at millimeter wavelengths is planned for the sixth Applications Technology Satellite (ATS-F), scheduled for launch in May of 1973. The ATS-F experiment is designed to provide engineering data on wideband space-to-earth transmissions at 20 and 30 GHz as a function of meteorological conditions and modulation techniques. The system design for both the spacecraft and ground station portions of the experiment is presented, and the unique design characteristics of these relatively new and unexplored frequency bands are emphasized. The experiment is designed to provide wideband 1440-MHz propagation links and 40-Megabit communications links with simultaneous operation at 20, 30, and 4 GHz for link comparisons.

Ippolito, L. J.↗

Autonomous spacecraft executive and its application to rendezvous and docking

Autonomy is needed for future spacecraft to solve the problems of human operator overload and transmission delay. This paper describes the autonomous spacecraft executive for rendezvous and docking. It is an onboard expert system and has decision making capability for mission planning of nominal and contingency cases. The executive has been developed and verified using a hardware motion based simulator.

Komura, Fuminobu↗

Reinforcement Learning for Spacecraft Navigation & Environment Characterization in the Planar-Restricted Two-Body Problem

As science, exploration, and commercial space missions become increasingly complex, so does the need for efficient, autonomous, and integrated spacecraft navigation and operations techniques. Key operational functions, including data collection and transmission, environment characterization, systems constraints, human factors, and navigation, often are intertwined and conflicted. Deep Reinforcement Learning (DRL) offers a framework for addressing integrated spacecraft navigation and planning in an uncertain dynamical environment. The goal of this study is to evaluate the utility of DRL for integrated spacecraft navigation and planning. This is achieved by developing a simple environmental characterization training environment in the Planar-Restricted 2-Body Problem (PR2BP), establishing benchmarks and heuristic baselines, and designing a previously unstudied Markov Decision Process (MDP) formulation. This MDP formulation enables the spacecraft DRL agents to appropriately balance navigation and actuation capabilities. The resulting DRL-derived policy exceeds a random or untrained policy and meets or exceeds the level of performance of a heuristic without actuation. In the process, valuable intuition is gained about the problem with insight into how DRL methods could scale to increasingly more realistic scenarios, including net-work design and training architectures, efficient state space representations, and methods for encouraging exploration in a parametric action space, among others.

navigation↗