A Decomposition Approach for Solving Seasonal Transmission Switching

Economic transmission switching has been proposed as a new control paradigm to improve the economics of electric power systems. In practice, the transmission switching operation itself is a disruptive action to the system. Frequently switching lines into or out of service can create undesirable effects on the security and reliability of power systems and may require new investments in the automation and control systems. In this paper, we formulate an economic seasonal transmission switching model where transmission switching occurs once at the beginning of a time period (season) and then the transmission topology remains unchanged during that period. The proposed seasonal transmission switching model is a large-scale mixed integer programming problem. The objective of the optimization model is to minimize the total energy generation cost over the season subject to loads and N-1 reliability requirements. We develop a novel decomposition method that decomposes the seasonal problem into one-hour problems which are then solved efficiently. We demonstrate our model and the decomposition approach on the 14-bus, 39-bus, and 118-bus power systems and show potential cost savings in each case.

Decomposition↗

A Two-Stage Quantum Reinforcement Learning Method for Multi-Objective Transmission Switching

Multi-objective transmission switching (MO-TS) problems involve the strategic reconfiguration of network topology to simultaneously optimize multiple objectives. As the system scale increases, finding feasible solutions becomes increasingly challenging due to the problem's nonlinearity and high computational complexity. To address these challenges, this paper proposes a two-stage quantum reinforcement learning method that leverages potential quantum advantages for MO-TS. In the first stage, candidate switching lines are identified using a graph-theoretical approach to reduce the problem's dimensionality. The second stage introduces a quantum-classical reinforcement learning framework, where a learnable measurement-based CNN-ResVQC architecture is developed to effectively reduce the input dimension for quantum processing, mitigate vanishing gradients, and enhance trainability while improving the quantum circuit's flexibility in modeling complex decision policies for MO-TS. Numerical studies on IEEE 14-bus, 57-bus, and 118-bus systems demonstrate that the proposed algorithm achieves superior training stability and faster convergence with approximately 1% of the network parameters required by classical algorithms, highlighting its effectiveness, efficiency, and scalability. Furthermore, the practicality is validated through its stable convergence under three common quantum noise channels.

99 GENERAL AND MISCELLANEOUS↗

Virtual-Voltage Partition-Based Approach to Optimal Transmission Switching

This article deals with optimal transmission switching (OTS) problems involving binary decisions about network topology and nonconvex power flow constraints. We adopt a semidefinite programming formulation for the optimal power flow (OPF) problem that, however, remains nonconvex due to the presence of discrete variables and bilinear products between the decision variables. To tackle the latter, we introduce a physically inspired, virtual-voltage approximation that leads to provable lower and upper bounds on the solution of the original problem. To deal with the exponential complexity caused by the discrete variables, we introduce a graph partition-based algorithm that breaks the problem into several parallel mixed-integer subproblems of smaller size. Simulations on the IEEE bus test cases demonstrate the high degree of accuracy and affordable computational requirements of our approach.

42 ENGINEERING↗

Feasible region-based heuristics for optimal transmission switching

In this paper, we develop a optimal transmission switching (OTS) heuristic based on DC optimal power flow (OPF) and assess the efficacy of the approach when implemented within AC OPF. Traditional formulations of the OTS problem can result in hundreds or thousands of binary variables for large networks, making the OTS problem challenging to solve on fast timescales even for relatively small networks. Here, we identify which constraints and therefore which variables are constraining the DC OPF feasible region, and rank them based on their impact on the cost function. We develop a heuristic algorithm which iteratively removes these constraints and solves a series of standard DC OPF problems. The heuristic is tested on a variety of PGlib networks and the results show that the algorithm can provide substantial cost decreases without having to solve any mixed integer programs. Additionally, we provide insights about the OTS problem, including identifying scenarios outside congestion where OTS can prove useful. Lastly, the performance of the DC-based heuristic is shown when the line switching decisions are implemented within AC OPF.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ACOPF Transmission Switching Using Open-Source MINLP Solvers

The optimal transmission switching (OTS) problem with AC physics represents a mixed integer non-linear non-convex optimization problem which can provide benefits to transmission level power system operations. In this paper we benchmark a set of open-source mixed integer non-linear programming (MINLP) solvers on the OTS problem with AC physics using the pglib set of power system test cases. Results characterizing the performance of the different solvers are reported and discussed.

ACOPF↗

Convex Relaxations for Quadratic On/Off Constraints and Applications to Optimal Transmission Switching

This paper studies mixed-integer nonlinear programs featuring disjunctive constraints and trigonometric functions and presents a strengthened version of the convex quadratic relaxation of the optimal transmission switching problem. We first characterize the convex hull of univariate quadratic on/off constraints in the space of original variables using perspective functions. Next, we introduce new tight quadratic relaxations for trigonometric functions featuring variables with asymmetrical bounds. These results are used to further tighten recent convex relaxations introduced for the optimal transmission switching problem in power systems. Using the proposed improvements, along with bound propagation, on 23 medium-sized test cases in the PGLib benchmark library with a relaxation gap of more than 1%, we reduce the gap to less than 1% on five instances. The tightened model has promising computational results when compared with state-of-the-art formulations.

97 MATHEMATICS AND COMPUTING↗

Optimal Transmission Switching Using the IV-ACOPF Linearization

In this paper we seek to investigate the performance of transmission switching using the iterative linear program approximation to the Current Voltage AC Optimal Power Flow (IV-ACOPF). Several different methods of using this switching are investigated to find a method that addresses the MIP challenges and is both fast and accurate. We consider opening only one line, opening up to five lines, and progressively opening one line at a time. The linear method with switching is much faster than the nonlinear ACOPF and generally finds solutions within 1% of the nonlinear ACOPF.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Computationally Improved Heuristic Algorithm for Transmission Switching Using Line Flow Thresholds for Load Shed Reduction

We present a computationally improved heuristic algorithm for transmission switching (TS) to recover load shed. Research from the past showed that changing power system topology may control power flows and remove line congestion. Hence, TS may reduce the required load shed. One of the main challenges is to find a potential TS candidate in a suitable time. Here, we propose a novel heuristic method that is capable of finding the potential TS candidate faster than existing algorithms in literature. The proposed method is compatible with both the AC and DC optimal power flows (OPF). Three metrics are used to compare the proposed algorithm with the state-of-the-art from literature to show the speedup and accuracy achieved. The proposed method is implemented on the IEEE 30-bus system, PEGASE 89-bus system, IEEE 118-bus system, and Polish 2383- bus system. The results on the large-scale Polish 2383-bus system shows that the proposed algorithm is scalable to large real-world systems. Parallel computing is implemented to further improve the computational performance of the proposed algorithm.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Improved Transmission Switching Algorithm for Managing Post-(N-1) Contingencies in Electricity Networks

In this presentation, we detail the shortcomings of existing transmission switching (TS) methodologies for preventing post-contingency loss of load in wide area electric power networks. Following that, we present a bi-level algorithm as an improvement to the state of the art. We show proof-of-concept level results that indicate computational viability, fast solutions, and the ability to pick the same best candidate as non computationally viable methods. Further, our method also minimizes load shedding after the contingency, thus enhancing the reliability and security of electricity supply. We also include a futuristic scenario of increased renewables and decreased natural gas sourced generators to show promising results. We grant permission for our presentation to be recorded and uploaded by the conference organizers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Load Shed Recovery With Transmission Switching and Intentional Islanding Methods After (N-2) Line Contingencies

Changing power system configuration may result in load shed recovery (LSR) because topology change can provide power flow control in meshed network. Some topologies may favor generation redispatch as compared to others and can eliminate line congestion which leads to LSR. One of the known methods for topology change is called transmission switching (TS) and research conducted in the past showed that TS is an effective means of mitigating load shedding. Another method of topology control is intentional islanding (IIS). In this manuscript, we explore IIS as a potential solution for LSR. IIS based on generator coherency has been presented in literature for mitigating cascading failures. However, IIS has not been explored solely as a LSR mechanism. In this paper, we compare the LSR based on IIS with well known LSR algorithm based on TS. The comparison is performed for IEEE 39-bus system and IEEE 118- bus system. The results show that IIS has a potential to perform better than TS in terms of computational efficiency and LSR.

42 ENGINEERING↗

A two-phase investment model for optimal allocation of phasor measurement units considering transmission switching

Ensuring the reliability of an electrical power system requires a wide-area monitoring and full observability of the state variables. Phasor measurement units (PMUs) collect in real time synchronized phasors of voltages and currents which are used for the observability of the power grid. Due to the considerable cost of installing PMUs, it is not possible to equip all buses with PMUs. In this paper, we propose an integer linear programming model to determine the optimal PMU placement plan in two investment phases. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUs are installed in the second phase to guarantee the N - 1 observability of the power grid. The proposed model also accounts for transmission switching and single contingencies such as failure of a PMU or a transmission line. Results are provided on several IEEE test systems which show that our proposed approach is a promising enhancement to the methods available for the optimal placement of PMUs.

Phasor measurement unit↗

Chance-Constrained Transmission Switching With Guaranteed Wind Power Utilization

Due to the significant variability and uncertainty of wind power over short time scales, high penetration of wind power can be problematic in an electric grid. One of the critical issues is how to keep increasing wind penetration without jeopardizing grid security and reliability. This paper explores the possibility of changing transmission network topology, by transmission switching, to accommodate higher utilization of wind power and reduce the generation costs of thermal units. Considering the uncertainty in wind power output, we use chance constraints to ensure that the wind energy utilized exceeds a minimal usage level at a certain probability. We develop a deterministic approximation approach using sample average approximation and provide a strong extended formulation. Numerical results show the potential benefit the proposed model can achieve.

17 WIND ENERGY↗