Installation of Lysimeters Near Engineered Trench 3, Slit Trench 8, and Slit Trench 9
Nine new lysimeter stations were installed at the E-Area Low Level Waste Facility (ELLWF). Six lysimeter stations were installed near Engineered Trench 3 (ET3), one installed near Slit Trench 8 (ST8), and two installed near Slit Trench 9 (ST9) as shown in Figure ES-1. Two lysimeters were installed at each station at the depths shown in Table ES-1. Lysimeter placements were based on borehole lithology and were comparable to existing nearby lysimeter stations. The deepest lysimeter at each of the new lysimeter stations was designated as the action-level lysimeter. Following installation, the lysimeters were purged and placed under vacuum for sampling. Sampling occurred in April 2023. Analytical results from the sampling will be provided in the Spring 2023 Lysimeter Tritium Data technical memo and the 2023 Annual Summary Report. With the addition of the new lysimeters at ET3, ST8, and ST9, the vadose zone monitoring system is now comprised of 327 active lysimeters at 111 lysimeter stations. There are 102 action-level lysimeters at 111 stations.