Search NASA⌕ Search

SEARCH · Search NASA

Results for “turbine control system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Chapter 14: Wind Turbine Control Systems

Wind turbines are complex, nonlinear, dynamic systems forced by gravity, stochastic wind disturbances, and gravitational, centrifugal, and gyroscopic loads. The aerodynamic behavior of wind turbines is nonlinear, unsteady, and complex. Turbine rotors are subjected to a complicated three-dimensional turbulent wind inflow field that drives fatigue loading. Wind turbine modeling is also complex and challenging. Accurate models must contain many degrees of freedom (DOF) to capture the most important dynamic effects. The rotation of the rotor adds complexity to the dynamics modeling. Designs of control algorithms for wind turbines must account for these complexities. Algorithms must capture the most important turbine dynamics without being too complex and unwieldy. Off-the-shelf commercial soft ware is seldom adequate for wind turbine dynamics modeling. Instead, specialized dynamic simulation codes are usually required to model all the important nonlinear effects. As illustrated in Figure 14-1, a wind turbine control system consists of sensors, actuators and a system that ties these elements together. A hardware or software system processes input signals from the sensors and generates output signals for actuators. The main goal of the controller is to modify the operating states of the turbine to maintain safe turbine operation, maximize power, mitigate damaging fatigue loads, and detect fault conditions. A supervisory control system starts and stops the machine, yaws the turbine when there is a significant yaw misalignment, detects fault conditions, and performs emergency shut-downs. Other parts of the controller are intended to maximize power and reduce loads during normal turbine operation.

17 WIND ENERGY↗

Development of a Fleet-Level Human Factors Engineering Program to Support the Digital Modernization of Multiple Turbine Control Systems

A number of years ago, Duke Energy and the United States (U.S.) Department of Energy (DOE) entered into a collaboration to support Duke’s digital upgrade activities for the main control rooms at three of their commercial nuclear power stations. The collaboration specifically focused on the human factors engineering (HFE) aspects of Duke’s plans to upgrade the legacy turbine control systems (TCS) at their Brunswick, Robinson, and Harris plants. This TSC upgrade involved installing a common digital control system (DCS), or distributed instrumentation and control (I&C) system platform, which multiple digital plant control systems can be integrated onto as the control rooms are modernized over time. Given the breadth and depth of the scope of this upgrade, DOE researchers at Idaho National Laboratory (INL) with expertise in human factors collaborated with Duke throughout the entire HFE life cycle to help ensure the upgrade was performed in a manner consistent with regulatory human factors review criteria, such as the U.S. Nuclear Regulatory Commission’s (NRC) Human Factors Engineering Program Review Model (NUREG 0711, 2012). This paper describes the HFE researchers performed through the early and middle phases of these TCS upgrades. Specific HFE activities include: 1) the development of a human factors program management plan, 2) performing an operational experience review, 3) evaluating the design human system interface while it was still in the early stages of development, and 4) developing a framework to help map these HFE activities to NUREG-0711 to help understand and catalog the value of different types and phases of human performance data collection. These four HFE activities are described in more detail below.

99 GENERAL AND MISCELLANEOUS↗

FOCAL Campaign IV: Integrated System Control: Turbine + Hull

Campaign IV of the Floating Offshore-wind Controls Advanced Laboratory Experimental Program (FOCAL) aimed to generate a dataset enabling the validation of a floating offshore wind turbine with turbine and hull controls. The turbine considered in this campaign is the scaled IEA 15MW Reference Wind Turbine similar to the setup considered in FOCAL Campaign I. This turbine is mounted on the VolturnUS platform with integrated hull controls similar to the hull considered in FOCAL Campaign II/III. This system is deployed for a fully-coupled wind and wave testing campaign at the University of Maine's Harold Alfond Wind and Wave (W2) facility. System dynamics and turbine characteristics are measured to determine global performance and assess the effect of the control strategies employed. NREL's reference open-source controller (ROSCO) is used for active blade pitch control and hull structural control is examined through the use of tuned mass dampers (TMD's) tuned to the systems pitch and tower-bending natural frequency. The naming convention of the load cases considered are described in the data details section. Detailed properties on the modeled system are found in the following reference: Lenfest E., Floating Offshore-wind Controls Advanced Laboratory (FOCAL) Experimental Program - Campaign IV: 1:70 Model-scale Testing of the IEA-Wind 15MW Reference Turbine and the VolturnUS-S Platform. UMaine ASCC Report Number 23-57-1183.

17 WIND ENERGY↗

NWTC Researchers Field-Test Advanced Control Turbine Systems to Increase Performance, Decrease Structural Loading of Wind Turbines and Plants

Researchers at the National Renewable Energy Laboratory's (NREL's) National Wind Technology Center (NWTC) are studying component controls, including new advanced actuators and sensors, for both conventional turbines as well as wind plants. This research will help develop innovative control strategies that reduce aerodynamic structural loads and improve performance. Structural loads can cause damage that increase maintenance costs and shorten the life of a turbine or wind plant.

17 WIND ENERGY↗

Fully vs. Sequentially Coupled Loads Analysis of Offshore Wind Turbines

The design and analysis methods for offshore wind turbines must consider the aerodynamic and hydrodynamic loads and response of the entire system (turbine, tower, substructure, and foundation) coupled to the turbine control system dynamics. Whereas a fully coupled (turbine and support structure) modeling approach is more rigorous, intellectual property concerns can preclude this approach. In fact, turbine control system algorithms and turbine properties are strictly guarded and often not shared. In many cases, a partially coupled analysis using separate tools and an exchange of reduced sets of data via sequential coupling may be necessary. In the sequentially coupled approach, the turbine and substructure designers will independently determine and exchange an abridged model of their respective subsystems to be used in their partners' dynamic simulations. Although the ability to achieve design optimization is sacrificed to some degree with a sequentially coupled analysis method, the central question here is whether this approach can deliver the required safety and how the differences in the results from the fully coupled method could affect the design. This work summarizes the scope and preliminary results of a study conducted for the Bureau of Safety and Environmental Enforcement aimed at quantifying differences between these approaches through aero-hydro-servo-elastic simulations of two offshore wind turbines on a monopile and jacket substructure.

17 WIND ENERGY↗

Tutorial of Wind Turbine Control for Supporting Grid Frequency through Active Power Control: Preprint

As wind energy becomes a larger portion of the world's energy portfolio and wind turbines become larger and more expensive, wind turbine control systems play an ever more prominent role in the design and deployment of wind turbines. The goals of traditional wind turbine control systems are maximizing energy production while protecting the wind turbine components. As more wind generation isinstalled there is an increasing interest in wind turbines actively controlling their power output in order to meet power setpoints and to participate in frequency regulation for the utility grid. This capability will be beneficial for grid operators, as it seems possible that wind turbines can be more effective at providing some of these services than traditional power plants. Furthermore,establishing an ancillary market for such regulation can be beneficial for wind plant owner/operators and manufacturers that provide such services. In this tutorial paper we provide an overview of basic wind turbine control systems and highlight recent industry trends and research in wind turbine control systems for grid integration and frequency stability.

17 WIND ENERGY↗

Floating Offshore WTG Integrated Load Analysis & Optimization Employing a Tuned Mass Damper

Floating offshore wind turbines (FOWTs) present complex design challenges due to the coupled dynamics of the platform motion, mooring system, and turbine control systems, in response to wind and wave loading. This can lead to higher extreme and fatigue loads than a comparable fixed bottom or onshore system. Previous research[1] has shown the potential to reduced extreme and fatigue loads on FOWT using tuned mass dampers (TMD) for structural control. This project aims to reduce maximum loads using passive TMDs located at the tower top during extreme storm events, when grid supplied power for other controls systems may not be available. The Alstom Haliade 6MW wind turbine is modelled on the Glosten Pelastar tension-leg platform (TLP). The primary objectives of this project are to provide a preliminary assessment of the load reduction potential of passive TMDs on real wind turbine and TLP designs.

17 WIND ENERGY↗

Lessons Learned from Performing a Human Factors Engineering Validation of an Upgraded Digital Control System in a Nuclear Power Plant Control Room

The United States' fleet of nuclear power plants (NPPs) have exceeded their original 40-year licenses and many are seeking license renewals to continue operations into the future. To support continued operation the Department of Energy's (DOE) Light Water Reactor Sustainability Program (LWRS) provides support for utilities to maintain and upgrade their power production capabilities. Control room modernization is one focus area, which aims to modernization the analog control rooms with digital controls and human-system interfaces (HSIs). The Turbine Control System (TCS) is a non-safety related system undergoing modernization efforts at multiple plants and utilities. Considerable human factors research efforts, comprised of expert reviews and operator in the loop studies were performed to develop human factors compliant and usable TCS. This report documents the final phase of the human factors engineering program used to design and validate the new digital TCS. According to the NUREG-0711 review guide, one of the last steps of human factors engineering program prior to implementation is human factors validation. This report details the method, results and conclusions from the human factors validation study of a collaborating utilities TCS slated to be implemented in one of their plants. One control room team consisting of two control room supervisors and two reactor operators participated in the validation. All team members had participated in the BNP TCS training program foregoing the TCS validation. Performance measures included task performance, situation awareness and workload, expert observation of any negative influences of human-system interface features on control room team performance, and interviews with the participating operators. Performance criteria were based on the performance scores and the topics identified by interviews and expert observations. The results showed that the crew using the new TCS clearly could achieve their overall objectives in the test scenarios with sufficient situation awareness. The new TCS compared to the old system provided clear improvements of the control room work regarding shell and chest warming and regarding valve and other system testing. However, a number of Human Engineering Discrepancies (HEDs) were identified. HEDs were prioritized (level 1, 2 or 3) according to potential safety, plant availability, operability or personnel performance consequences. Since no priority 1 HEDs were identified there is no HFE reason not to continue implementation of the TCS. The TCS upgrade is acceptable if the Priority 2 HEDs are resolved and dispositioned in a satisfactory way. Priority 3 HEDs should be noted and considered for future modifications.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Gear-box fault detection using time-frequency based methods

Gear-box fault monitoring and detection is important for optimization of power generation and availability of wind turbines. The current industrial approach is to use condition monitoring systems, which runs in parallel with the wind turbine control system, using expensive additional sensors. An alternative would be to use the existing measurements which are normally available for the wind turbine control system. The usage of these sensors instead would cut down the cost of the wind turbine by not using additional sensors. One of these available measurements is the generator speed, in which changes in the gear-box resonance frequency can be detected. Two different time-frequency based approaches are presented in this paper. One is a filter based approach and the other is based on a Karhunen-Loeve basis. Both of them detects the gear-box fault with an acceptable detection delay.

Odgaard, Peter Fogh↗

Combining Droop Curve Concepts with Control Systems for Wind Turbine Active Power Control: Preprint

Wind energy is becoming a larger portion of the global energy portfolio and wind penetration has increased dramatically in certain regions of the world. This increasing wind penetration has driven the need for wind turbines to provide active power control (APC) services to the local utility grid, as wind turbines do not intrinsically provide frequency regulation services that are common withtraditional generators. It is common for large scale wind turbines to be decoupled from the utility grid via power electronics, which allows the turbine to synthesize APC commands via control of the generator torque and blade pitch commands. Consequently, the APC services provided by a wind turbine can be more flexible than those provided by conventional generators. This paper focuses on thedevelopment and implementation of both static and dynamic droop curves to measure grid frequency and output delta power reference signals to a novel power set point tracking control system. The combined droop curve and power tracking controller is simulated and comparisons are made between simulations using various droop curve parameters and stochastic wind conditions. The tradeoffs involvedwith aggressive response to frequency events are analyzed. At the turbine level, simulations are performed to analyze induced structural loads. At the grid level, simulations test a wind plant's response to a dip in grid frequency.

17 WIND ENERGY↗

Digital Twin-Enabled Adaptive Control for Hydroelectric Systems: Turbine Governor and Voltage Regulation

This paper presents a comprehensive digital twin (DT) framework for hydroelectric systems that enables adaptive control of turbine governors and excitation systems without requiring detailed manufacturer specifications. The proposed framework integrates neural network-based system identification with stabilizing adaptive control laws for the installed turbine controller and middle-branch adaptive tuning for the installed voltage regulator. Using real operational data from Unit C-8 at Rocky Reach Dam (1,349 MW capacity), highfidelity neural network models are developed to capture turbine and generator dynamics without requiring detailed manufacturer specifications. The DT enables safe controller synthesis and validation in simulation before deployment. For turbine control, the proposed method achieves a 79.9% mean square error (MSE) reduction compared with that of an optimal controller. For voltage regulation, the adaptive excitation controller achieves approximately 42.6% MSE reduction while preserving installed protection logic. The results demonstrate that DT technology provides a practical pathway for modernizing hydropower control systems with minimal operational disruption.

Gui, Yonghao [ORNL] (ORCID:0000000250435534)↗

Control Board Digital Interface Input Devices – Touchscreen, Trackpad, or Mouse?

The authors collaborated with a power utility to evaluate input devices for use in the human system interface (HSI) for a new digital Turbine Control System (TCS) at a nuclear power plant (NPP) undergoing a TCS upgrade. A standalone dynamic software simulation of the new digital TCS and a mobile kiosk were developed to conduct an input device study to evaluate operator preference and input device effectiveness. The TCS software presented the anticipated HSI for the TCS and mimicked (i.e., simulated) the turbine systems’ responses to operator commands. Twenty-four licensed operators from the two nuclear power units participated in the study. Three input devices were tested: a trackpad, mouse, and touchscreen. The subjective feedback from the survey indicates the operators preferred the touchscreen interface. The operators subjectively rated the touchscreen as the fastest and most comfortable input device given the range of tasks they performed during the study, but also noted a lack of accuracy for selecting small targets. The empirical data suggest the mouse input device provides the most consistent performance for screen navigation and manipulating on screen controls. The trackpad input device was both empirically and subjectively found to be the least effective and least desired input device.

control room modernization↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

Human Factors Engineering Design Phase Report for Control Room Modernization

In this report, we review recent work performed at the Human System Simulation Laboratory (HSSL) at the Idaho National Laboratory. The U.S. Department of Energy has sponsored work under the Light Water Reactor Sustainabilty (LWRS) program to assist U.S. utilities in extending the operating life of the U.S. fleet of commercial reactors. Control room modernization is a key research and demonstration area within LWRS. The U.S. Nuclear Regulatory Commission’s Human Factors Engineering Program Review Model (NUREG-0711) outlines four phases of developing a new human-system interface (HSI). One of the key steps in NUREG-0711 is the design phase. In this report, we outline the process and findings from several simulator workshops, which centered on early design phase activities. Prototypes for a turbine control system upgrade for a main control room at a commercial nuclear power plant were developed and evaluated using licensed reactor operators at the HSSL. This iterative design-evaluation cycle succeeded in refining the design of the HSI and readying it for final implementation and formal validation and verification exercises. This report serves as a useful template to explicate design steps that are not currently required by NUREG-0711 but that ensure a usable and safe control room replacement system.

99 GENERAL AND MISCELLANEOUS↗

Analog, Digital, or Enhanced Human-System Interfaces? Results of an Operator-in-the-Loop Study on Main Control Room Modernization for a Nuclear Power Plant

The second Operator Study of System Overviews (OSSO-2) was conducted with a three-person reactor operator crew in the Human Systems Simulation Laboratory (HSSL) at Idaho National Laboratory (INL) in August, 2017. The study supported control room modernization at a nuclear power plant and featured a benchmark comparison of three variants of a turbine control system (TCS): the existing analog TCS, a proposed standalone digital TCS with two displays, and the digital TCS with the addition of a third display consisting of a system overview screen. TCS prototypes were developed at INL to allow evaluation of operator performance and preferences during realistic turbine scenarios in the full-scope simulator. The study revealed that completion of turbine startup was several minutes faster with the digital TCS variants than with the conventional analog TCS. Eye tracking scan paths were more widely distributed in the overview vs. standalone TCS condition, suggesting the overview screen was cueing reactor operators to verify values across the boards. There was no significant difference in workload or situation awareness across the three interfaces. Reviewing key plant parameters showed smoother transitions during load following for the digital vs. analog TCS. Despite some performance advantages for the digital TCS variants, operators preferred the existing analog TCS. Open-ended responses suggested this finding may be more an artifact of familiarity than a reflection of dissatisfaction with the new TCS. OSSO-2 provides compelling evidence that the new digital TCS was used successfully by the operators without extensive training of rewriting of the operating procedures, suggesting high usability for the digital TCS design. Further advantages were realized through the addition of the system overview screen to provide crews with at-a-glance indicators of key turbine parameters.

99 GENERAL AND MISCELLANEOUS↗

BWR modernization project: installation of a new digital feedwater control system - 295

A European BWR plant carried out a relevant and pioneering modernization project regarding the Feedwater and Feed Pump Turbine Control System, replacing the legacy analogic control with the new General Electric MarkVIe digital system. This digital instrumentation and control modernization, motivated by obsolescence, had a great impact on the main control room and on the plant operation. Tecnatom collaborated with the nuclear power plant in the project performing the following activities: early installation of the system in the full scope and classroom simulators, Human Factors Engineering (HFE) Verification and Validation (V and V), Simulation Assisted Engineering (SAE), design and implementation of cyber secure communication with the Plant Process Computer (PPC), operating procedures modification and plant operators training. Those activities contributed to the success of the project that was completed during the refueling outage as planned. Scheduling HFE verification before the design freeze allowed the plant to modify the Human Machine Interface (HMI) to comply with the standards and increase safety without overcharging the project. SAE resulted in the reduction of costs and time during the system commissioning through the detection of discrepancies and improvements in the control, covering different plant scenarios. All the activities carried out in the simulators before the implementation of the system in the plant contributed to validate it and to build confidence in the new control among the plant personnel. New digital system communication interfaces with the PPC saved cable laying works and allowed future expansions. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.

99 GENERAL AND MISCELLANEOUS↗

A review of human-system interface design issues observed during analog-to-digital and digital-to-digital migrations in U.S. nuclear power plants - 312

The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program is developing a scientific basis through targeted research and development (R and D) to support the U.S. nuclear power plant (NPP) fleet in extending their existing licensing period and ensuring their long-term reliability, productivity, safety, and security. Over the last several years, human factors engineering (HFE) professionals at the Idaho National Laboratory (INL) have supported the LWRS Advanced Instrumentation, Information, and Control (II and C) System Technologies pathway across several U.S. commercial NPPs in analog-to-digital migrations (i.e., turbine control systems) and digital-to-digital migrations (i.e., Safety Parameter Display System). These efforts have included in-depth human factors evaluation of proposed human-system interface (HSI) design concepts against established U.S. Nuclear Regulatory Commission (NRC) design guidelines from NUREG-0700, Rev 2 to inform subsequent HSI design prior to transitioning into Verification and Validation. This paper discusses some of the overarching design issues observed from these past HFE evaluations. In addition, this work presents some observed challenges such as common tradeoffs utilities are likely to face when introducing new HSI technologies into NPP hybrid control rooms. The primary purpose of this work is to distill these observed design issues into general HSI design guidance that industry can use in early stages of HSI design. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗