Spacecraft commanding for unmanned planetary missions - The uplink process

A general description of the command generation process for unmanned planetary missions is presented. Emphasis is given to those mission characteristics which significantly affect the cost of the uplink process including: the level of mission activity; mission strategies; permissible risk; and spacecraft design. Pertinent examples of the command generation procedures used in the Voyager, Mariner, and Viking programs are given in order to illustrate the different stages of the uplink process.

Linick, T. D.↗

Automating the uplink process for planetary missions

The dual challenges of increased capability along with lower costs are addressed with regard to flight operations. A program has been formulated to take advantage of advances in software and hardware in order to design, and prototype where indicated, a set of tools which can be applied to the building of a more productive uplink process for NASA missions that are envisaged for the the next decade. Techniques such as object-oriented programming, expert systems, natural-language parsing, interactive graphics, and parallel processing are employed in the quest for increased productivity. The paper is organized hierarchically with the level of 'goal', 'objectives' and 'tasks'. A brief review of the uplink process is included.

Mclaughlin, William I.↗

Model-Based Verification and Validation of the SMAP Uplink Processes

This case study stands as an example of how a project can validate a system-level design earlier in the project life cycle than traditional V&V processes by using simulation on a system model. Specifically, this paper describes how simulation was added to a system model of the Soil Moisture Active-Passive (SMAP) mission's uplink process.Also discussed are the advantages and disadvantages of the methods employed and the lessons learned; which are intended to benefit future model-based and simulation-based V&V development efforts.

verification and validation (V&V)↗

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, the pace of this process was never intended to be continued indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5-day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

mission operations↗

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, there was never an intention of maintaining the pace of this process indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5- day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

Mars exploration↗

An application of computer aided requirements analysis to a real time deep space system

The entire procedure of incorporating the requirements and goals of a space flight project into integrated, time ordered sequences of spacecraft commands, is called the uplink process. The Uplink Process Control Task (UPCT) was created to examine the uplink process and determine ways to improve it. The Problem Statement Language/Problem Statement Analyzer (PSL/PSA) designed to assist the designer/analyst/engineer in the preparation of specifications of an information system is used as a supporting tool to aid in the analysis. Attention is given to a definition of the uplink process, the definition of PSL/PSA, the construction of a PSA database, the value of analysis to the study of the uplink process, and the PSL/PSA lessons learned.

Farny, A. M.↗

Cost, capability, and risk for planetary operations

The three key factors for flight projects - cost, capability, and risk - are examined with respect to their interplay, the uplink process, cost drivers, and risk factors. Scientific objectives are translated into a computer program during the uplink process, and examples are given relating to the Voyager Interstellar Mission, Galileo, and the Comet Rendezvous Asteroid Flyby. The development of a multimission sequence system based on these uplinks is described with reference to specific subsystems such as the pointer and the sequence generator. Operational cost drivers include mission, flight-system, and ground-system complexity, uplink traffic, and work force. Operational risks are listed in terms of the mission operations, the environment, and the mission facilities. The uplink process can be analyzed in terms of software development, and spacecraft operability is shown to be an important factor from the initial stages of spacecraft development.

Mclaughlin, William I.↗

Strategies for automatic planning: A collection of ideas

The main goal of the Jet Propulsion Laboratory (JPL) is to obtain science return from interplanetary probes. The uplink process is concerned with communicating commands to a spacecraft in order to achieve science objectives. There are two main parts to the development of the command file which is sent to a spacecraft. First, the activity planning process integrates the science requests for utilization of spacecraft time into a feasible sequence. Then the command generation process converts the sequence into a set of commands. The development of a feasible sequence plan is an expensive and labor intensive process requiring many months of effort. In order to save time and manpower in the uplink process, automation of parts of this process is desired. There is an ongoing effort to develop automatic planning systems. This has met with some success, but has also been informative about the nature of this effort. It is now clear that innovative techniques and state-of-the-art technology will be required in order to produce a system which can provide automatic sequence planning. As part of this effort to develop automatic planning systems, a survey of the literature, looking for known techniques which may be applicable to our work was conducted. Descriptions of and references for these methods are given, together with ideas for applying the techniques to automatic planning.

Collins, Carol↗

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗

Evolution of the Scope and Capabilities of Uplink Support Software for Mars Surface Operations

In January of 2004 both of the Mars Exploration Rover spacecraft landed safely, initiating daily surface operations at the Jet Propulsion Laboratory for what was anticipated to be approximately three months of mobile exploration. The longevity of this mission, still ongoing after ten years, has provided not only a tremendous return of scientific data but also the opportunity to refine and improve the methodology by which robotic Mars surface missions are commanded. Since the landing of the Mars Science Laboratory spacecraft in August of 2012, this methodology has been successfully applied to operate a Martian rover which is both similar to, and quite different from, its predecessors. For MER and MSL, daily uplink operations can be most broadly viewed as converting the combined interests of both the science and engineering teams into a spacecraft-safe set of transmittable command files. In order to accomplish these ends a discrete set of mission-critical software tools were developed which not only allowed for conformation to established JPL standards and practices but also enabled innovative technologies specific to each mission. Although these primary programs provided the requisite capabilities for meeting the high-level goals of each distinct phase of the uplink process, there was little in the way of secondary software to support the smooth flow of data from one phase to the next. In order to address this shortcoming a suite of small software tools was developed to aid in phase transitions, as well as to automate some of the more laborious and error-prone aspects of uplink operations. This paper describes the evolution of this software suite, from its initial attempts to merely shorten the duration of the operator's shift, to its current role as an indispensable tool enforcing workflow of the uplink operations process and agilely responding to the new and unexpected challenges of missions which can, and have, lasted many years longer than originally anticipated.

CoUGAR↗

The Space Shuttle Ground Terminal Delta Modulation System

Shuttle voice processing uses a Variable Slope Delta Modulation scheme which is a variant of the ABATE algorithm. This paper summarizes the ground terminal subsystem which processes the multiplexed voice and telemetry data digital sequence in the downlink processing and digitizes the voice signal in the uplink processing. The Delta Modulation System (DMS) performance characteristics are given in terms of an intelligibility test score and in terms of time and frequency responses measured on a production system developed for NASA Goddard Space Flight Center. Implementation details of the encoder and decoder algorithms are given in terms of the circuit logic used to implement them.

Auger, R. L.↗

Integrated command, control, communications and computation system functional architecture

The functional architecture for an integrated command, control, communications, and computation system applicable to the command and control portion of the NASA End-to-End Data. System is described including the downlink data processing and analysis functions required to support the uplink processes. The functional architecture is composed of four elements: (1) the functional hierarchy which provides the decomposition and allocation of the command and control functions to the system elements; (2) the key system features which summarize the major system capabilities; (3) the operational activity threads which illustrate the interrelationahip between the system elements; and (4) the interfaces which illustrate those elements that originate or generate data and those elements that use the data. The interfaces also provide a description of the data and the data utilization and access techniques.

Cooley, C. G.↗

How to feed a spacecraft

The uplink process between ground computers and the spacecraft computer is examined. Data is uplinked to a spacecraft by a load (a sequence of preplanned commands) or by real-time commands; the differences between these two types of uplinks are discussed. The sequencing of a load involves: (1) request generation, (2) request integration, (3) reference generation, and (4) transmitting the load. The functions of each of the sequencing steps are described. The development of new sequencing methods using expert systems and AI is being studied. A symbolic processing software which has the ability to transmit data typed into a computer in English was developed. Consideration is given to the composition, capabilities of the parser, and application of the symbolic processing software to the Comet Renedezvous Asteroid Flyby spacecraft.

Mclaughlin, William↗

Automated Sequence Processor: Something Old, Something New

High productivity required for operations teams to meet schedules Risk must be minimized. Scripting used to automate processes. Scripts perform essential operations functions. Automated Sequence Processor (ASP) was a grass-roots task built to automate the command uplink process System engineering task for ASP revitalization organized. ASP is a set of approximately 200 scripts written in Perl, C Shell, AWK and other scripting languages.. ASP processes/checks/packages non-interactive commands automatically.. Non-interactive commands are guaranteed to be safe and have been checked by hardware or software simulators.. ASP checks that commands are non-interactive.. ASP processes the commands through a command. simulator and then packages them if there are no errors.. ASP must be active 24 hours/day, 7 days/week..

Automated↗