Search NASA⌕ Search

SEARCH · Search NASA

Results for “utility bill validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

NASA Crew Launch Vehicle Approach Builds on Lessons from Past and Present Missions

The United States Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with a new human-rated system suitable for missions to the Moon and Mars. The Crew Exploration Vehicle (CEV) that the new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. NASA is using its extensive experience gained from past and ongoing launch vehicle programs to maximize the CLV system design approach, with the objective of reducing total lifecycle costs through operational efficiencies. To provide in-depth data for selecting this follow-on launch vehicle, the Exploration Systems Architecture Study was conducted during the summer of 2005, following the confirmation of the new NASA Administrator. A team of aerospace subject matter experts used technical, budget, and schedule objectives to analyze a number of potential launch systems, with a focus on human rating for exploration missions. The results showed that a variant of the Space Shuttle, utilizing the reusable Solid Rocket Booster as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit, was the best choice to reduce the risks associated with fielding a new system in a timely manner. The CLV Project, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operation of this new human-rated system. The CLV Project works closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch system . leveraging a wealth of lessons learned from Shuttle operations. The CL V is being designed to reduce costs through a number of methods, ranging from validating requirements to conducting trades studies against the concept design. Innovations such as automated processing will build on lessons learned from the Shuttle, other launch systems, Department of Defense operations experience, and subscale flight tests such as the Delta Clipper-Experimental Advanced (DCXA) vehicle operations that utilized minimal touch labor, automated cryogen ic propellant loading , and an 8-hour turnaround for a cryogenic propulsion system. For the CLV, the results of hazard analyses are contributing to an integrated vehicle health monitoring system that will troubleshoot anomalies and determine which ones can be solved without human intervention. Such advances will help streamline the mission operations process for pilots and ground controllers alike. In fiscal year 2005, NASA invested approximately $4.5 billion of its $16 bill ion budget on the Space Shuttle. The ultimate goal of the CLV Project is to deliver a safe, reliable system designed to minimize lifecycle costs so that NASA's budget can be invested in missions of scientific discovery. Lessons learned from developing the CLV will be applied to the growth path for future systems, including a heavy lift launch vehicle.

Dumbacher, Daniel L.↗

ASRM Process Development in Aqueous Cleaning

Viewgraphs are included on process development in aqueous cleaning which is taking place at the Aerojet Advanced Solid Rocket Motor (ASRM) Division under a NASA Marshall Space and Flight Center contract for design, development, test, and evaluation of the ASRM including new production facilities. The ASRM will utilize aqueous cleaning in several manufacturing process steps to clean case segments, nozzle metal components, and igniter closures. ASRM manufacturing process development is underway, including agent selection, agent characterization, subscale process optimization, bonding verification, and scale-up validation. Process parameters are currently being tested for optimization utilizing a Taguci Matrix, including agent concentration, cleaning solution temperature, agitation and immersion time, rinse water amount and temperature, and use/non-use of drying air. Based on results of process development testing to date, several observations are offered: aqueous cleaning appears effective for steels and SermeTel-coated metals in ASRM processing; aqueous cleaning agents may stain and/or attack bare aluminum metals to various extents; aqueous cleaning appears unsuitable for thermal sprayed aluminum-coated steel; aqueous cleaning appears to adequately remove a wide range of contaminants from flat metal surfaces, but supplementary assistance may be needed to remove clumps of tenacious contaminants embedded in holes, etc.; and hot rinse water appears to be beneficial to aid in drying of bare steel and retarding oxidation rate.

Swisher, Bill↗

A Uniform Search for Nearby Planetary Companions to Hot Jupiters in TESS Data Reveals Hot Jupiters Are Still Lonely

We present the results of a uniform search for additional planets around all stars with confirmed hot Jupiters observed by the Transiting Exoplanet Survey Satellite (TESS) in its Cycle 1 survey of the southern ecliptic hemisphere. Our search comprises 184 total planetary systems with confirmed hot Jupiters with Rp > 8 R⊕ and orbital period <10 days. The Transit Least Squares algorithm was utilized to search for periodic signals that may have been missed by other planet search pipelines. While we recovered 169 of these confirmed hot Jupiters, our search yielded no new statistically validated planetary candidates in the parameter space searched (P < 14 days). A lack of planet candidates nearby hot Jupiters in the TESS data supports results from previous transit searches of each individual system, now down to the photometric precision of TESS. This is consistent with expectations from a high-eccentricity migration formation scenario, but additional formation indicators are needed for definitive confirmation. We injected transit signals into the light curves of the hot Jupiter sample to probe the pipeline's sensitivity to the target parameter space, finding a dependence proportional to ${R}_{p}^{2.32}{P}^{-0.88}$ for planets within 0.3 ≤ Rp ≤ 4 R⊕ and 1 ≤ P ≤ 14 days. A statistical analysis accounting for this sensitivity provides a median and 90% confidence interval of ${7.3}_{-7.3}^{+15.2} \% $ for the rate of hot Jupiters with nearby companions in this target parameter space. This study demonstrates how TESS uniquely enables comprehensive searches for nearby planetary companions to nearly all the known hot Jupiters.

Benjamin J Hord↗

Comprehensive Modeling and Analysis of Rotorcraft Variable Speed Propulsion System With Coupled Engine/Transmission/Rotor Dynamics

This project develops comprehensive modeling and simulation tools for analysis of variable rotor speed helicopter propulsion system dynamics. The Comprehensive Variable-Speed Rotorcraft Propulsion Modeling (CVSRPM) tool developed in this research is used to investigate coupled rotor/engine/fuel control/gearbox/shaft/clutch/flight control system dynamic interactions for several variable rotor speed mission scenarios. In this investigation, a prototypical two-speed Dual-Clutch Transmission (DCT) is proposed and designed to achieve 50 percent rotor speed variation. The comprehensive modeling tool developed in this study is utilized to analyze the two-speed shift response of both a conventional single rotor helicopter and a tiltrotor drive system. In the tiltrotor system, both a Parallel Shift Control (PSC) strategy and a Sequential Shift Control (SSC) strategy for constant and variable forward speed mission profiles are analyzed. Under the PSC strategy, selecting clutch shift-rate results in a design tradeoff between transient engine surge margins and clutch frictional power dissipation. In the case of SSC, clutch power dissipation is drastically reduced in exchange for the necessity to disengage one engine at a time which requires a multi-DCT drive system topology. In addition to comprehensive simulations, several sections are dedicated to detailed analysis of driveline subsystem components under variable speed operation. In particular an aeroelastic simulation of a stiff in-plane rotor using nonlinear quasi-steady blade element theory was conducted to investigate variable speed rotor dynamics. It was found that 2/rev and 4/rev flap and lag vibrations were significant during resonance crossings with 4/rev lagwise loads being directly transferred into drive-system torque disturbances. To capture the clutch engagement dynamics, a nonlinear stick-slip clutch torque model is developed. Also, a transient gas-turbine engine model based on first principles mean-line compressor and turbine approximations is developed. Finally an analysis of high frequency gear dynamics including the effect of tooth mesh stiffness variation under variable speed operation is conducted including experimental validation. Through exploring the interactions between the various subsystems, this investigation provides important insights into the continuing development of variable-speed rotorcraft propulsion systems.

DeSmidt, Hans A.↗

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform↗