Search NASA⌕ Search

SEARCH · Search NASA

Results for “variable projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Framework for Categorizing Important Project Variables

While substantial research has led to theories concerning the variables that affect project success, no universal set of such variables has been acknowledged as the standard. The identification of a specific set of controllable variables is needed to minimize project failure. Much has been hypothesized about the need to match project controls and management processes to individual projects in order to increase the chance for success. However, an accepted taxonomy for facilitating this matching process does not exist. This paper surveyed existing literature on classification of project variables. After an analysis of those proposals, a simplified categorization is offered to encourage further research.

Parsons, Vickie S.↗

Train Like a (Var)Pro: Efficient Training of Neural Networks with Variable Projection

Deep neural networks (DNNs) have achieved state-of-the-art performance across a variety of traditional machine learning tasks, e.g., speech recognition, image classification, and segmentation. The ability of DNNs to efficiently approximate high-dimensional functions has also motivated their use in scientific applications, e.g., to solve partial differential equations and to generate surrogate models. In this paper, we consider the supervised training of DNNs, which arises in many of the above applications. We focus on the central problem of optimizing the weights of the given DNN such that it accurately approximates the relation between observed input and target data. Devising effective solvers for this optimization problem is notoriously challenging due to the large number of weights, nonconvexity, data sparsity, and nontrivial choice of hyperparameters. To solve the optimization problem more efficiently, we propose the use of variable projection (VarPro), a method originally designed for separable nonlinear least-squares problems. Our main contribution is the Gauss--Newton VarPro method (GNvpro) that extends the reach of the VarPro idea to nonquadratic objective functions, most notably cross-entropy loss functions arising in classification. These extensions make GNvpro applicable to all training problems that involve a DNN whose last layer is an affine mapping, which is common in many state-of-the-art architectures. In our four numerical experiments from surrogate modeling, segmentation, and classification, GNvpro solves the optimization problem more efficiently than commonly used stochastic gradient descent (SGD) schemes. Finally, GNvpro finds solutions that generalize well, and in all but one example better than well-tuned SGD methods, to unseen data points.

97 MATHEMATICS AND COMPUTING↗

Parallel projected variable metric algorithms for unconstrained optimization

The parallel variable metric optimization algorithms of Straeter (1973) and van Laarhoven (1985) are reviewed, and the possible drawbacks of the algorithms are noted. By including Davidon (1975) projections in the variable metric updating, researchers can generalize Straeter's algorithm to a family of parallel projected variable metric algorithms which do not suffer the above drawbacks and which retain quadratic termination. Finally researchers consider the numerical performance of one member of the family on several standard example problems and illustrate how the choice of the displacement vectors affects the performance of the algorithm.

Freeman, T. L.↗

Emergence of robust anthropogenic increase of heat stress-related variables projected from CORDEX-CORE climate simulations

The information of when and where region-specific patterns in both mean and extreme temperatures leading to heat stress will emerge from the present-day climate variability is important to plan adaptation options, but to date studies on this issue still remain limited and fragmented. Here, we estimate the time of emergence (TOE) of temperature and wet-bulb temperature (Tw), a better indication of heat stress, using fine-scale, long-term regional climate model projections under the RCP2.6 and RCP8.5 scenarios across six different domains. Differently from previous studies, the TOE is determined using three methods applied on impact-relevant variables: two different signal-to-noise frameworks based on summer mean temperature and Tw and a statistical test to identify significant differences in daily extreme distributions. The TOE response to RCP2.6 and RCP8.5 with respect to the end of 20th century variability differs significantly regardless of which TOE metric is applied. For summer mean temperature, the land fraction reaching TOE is expected to exceed 90% by the 2050s under the RCP8.5, whereas the increase rate of land exposure to TOE tends to stagnate over time under the RCP2.6 so that more than 40% of land will not experience TOE by the end of the 21st century. Compared to temperature, the TOE of Tw is reached earlier in most of the wet tropics but is delayed in hot and dry regions because of the nonlinear response of Tw to humidity. For both temperature and Tw, the TOE appears earlier in regions with low baseline variability, such as in the tropics. Despite the uncertainties arising from the choice of TOE metrics, the vast majority of regions in Africa and southeast Asia experience TOE in the early 21st century under both the RCP2.6 and RCP8.5 scenarios, which stresses the urgent need for developing adequate adaptation strategies in these regions.

54 ENVIRONMENTAL SCIENCES↗

Extended duration orbiter medical project variability of blood pressure and heart rate (STS-50/USML-1)

Decreases in arterial baroreflex function after space flight may be related to changes in blood pressure and heart rate patterns during flight. Ambulatory blood pressure and heart rate were measured for 24 hours, in fourteen astronauts on two occasions before flight, two to three occasions in flight, and 2 days after landing on Shuttle missions lasting 4 to 14 days. Blood pressure and heart rate were recorded every 20minutes during awake periods and every 30 minutes during sleep. In pre- and postflight studies, the 24-hour ambulatory measurements were followed by studies of carotid baroreceptor-cardiac reflex responses. Carotid baroreceptors were stimulated using a sequence of neck pressure and suction from +40 to -65 mmHg.

Fritsch-Yelle, Janice M.↗

Sensitivity of meteorological-forcing resolution on hydrologic variables

Projecting the spatiotemporal changes in water resources under a no-analog future climate requires physically based integrated hydrologic models which simulate the transfer of water and energy across the earth's surface. These models show promise in the context of unprecedented climate extremes given their reliance on the underlying physics of the system as opposed to empirical relationships. However, these techniques are plagued by several sources of uncertainty, including the inaccuracy of input datasets such as meteorological forcing. These datasets, usually derived from climate models or satellite-based products, are typically only resolved on the order of tens to hundreds of kilometers, while hydrologic variables of interest (e.g., discharge and groundwater levels) require a resolution at much smaller scales. In this work, a high-resolution hydrologic model is forced with various resolutions of meteorological forcing (0.5 to 40.5 km) generated by a dynamical downscaling analysis from the regional climate model Weather Research and Forecasting (WRF). The Cosumnes watershed, which spans the Sierra Nevada and Central Valley interface of California (USA), exhibits semi-natural flow conditions due to its rare undammed river basin and is used here as a test bed to illustrate potential impacts of various resolutions of meteorological forcing on snow accumulation and snowmelt, surface runoff, infiltration, evapotranspiration, and groundwater levels. Results show that the errors in spatial distribution patterns impact land surface processes and can be delayed in time. Localized biases in groundwater levels can be as large as 5–10 m and 3 m in surface water. Most hydrologic variables reveal that biases are seasonally and spatially dependent, which can have serious implications for model calibration and ultimately water management decisions.

54 ENVIRONMENTAL SCIENCES↗

"Intelligent Ensemble" Projections of Precipitation and Surface Radiation in Support of Agricultural Climate Change Adaptation

Earth's climate is changing and will continue to change into the foreseeable future. Expected changes in the climatological distribution of precipitation, surface temperature, and surface solar radiation will significantly impact agriculture. Adaptation strategies are, therefore, required to reduce the agricultural impacts of climate change. Climate change projections of precipitation, surface temperature, and surface solar radiation distributions are necessary input for adaption planning studies. These projections are conventionally constructed from an ensemble of climate model simulations (e.g., the Coupled Model Intercomparison Project 5 (CMIP5)) as an equal weighted average, one model one vote. Each climate model, however, represents the array of climate-relevant physical processes with varying degrees of fidelity influencing the projection of individual climate variables differently. Presented here is a new approach, termed the "Intelligent Ensemble, that constructs climate variable projections by weighting each model according to its ability to represent key physical processes, e.g., precipitation probability distribution. This approach provides added value over the equal weighted average method. Physical process metrics applied in the "Intelligent Ensemble" method are created using a combination of NASA and NOAA satellite and surface-based cloud, radiation, temperature, and precipitation data sets. The "Intelligent Ensemble" method is applied to the RCP4.5 and RCP8.5 anthropogenic climate forcing simulations within the CMIP5 archive to develop a set of climate change scenarios for precipitation, temperature, and surface solar radiation in each USDA Farm Resource Region for use in climate change adaptation studies.

Taylor, Patrick C.↗

Revolutionary Vertical Lift Technology Project: Variable-Speed Power Turbine Technology Demonstration

Demonstrate 50% improvement in efficient operational capability using a Variable-Speed Power Turbine concept. To enable this improvement, thermodynamics mechanical challenges from operating across variable shaft speeds must be accommodated. Also, aerodynamics research for the engine high-efficiency turbine component design must be conducted over a wide range of incidence angle variation.

Susan A Gorton↗

An independent analysis of bias sources and variability in wind plant pre-construction energy yield estimation methods

The wind resource assessment community has long had the goal of reducing the bias between wind plant pre-construction energy yield assessment (EYA) and the observed annual energy production (AEP). This comparison is typically made between the 50% probability of exceedance (P50) value of the EYA and the long-term corrected operational AEP (hereafter OA P50), and is known as the P50 bias. The industry has critically lacked an independent analysis of bias reduction investigated across multiple consultants to identify the greatest sources of uncertainty and variance in the EYA process and the best opportunities for uncertainty reduction. The present study addresses this gap by benchmarking consultant methodologies against each other and against operational data at a scale not seen before in industry collaborations. We consider data from 10 wind plants and evaluate discrepancies between eight consultancies in the steps taken from estimates of gross to net energy. Consultants tend to overestimate the gross energy produced at the turbines and then compensate by further overestimating downstream losses, leading to a mean P50 bias near zero, still with significant variability among the individual wind plants. Within our data sample, we find that consultant estimates of all loss categories, except environmental losses, tend to reduce the project-to-project variability of the P50 bias. The disagreement between consultants, however, remains flat throughout the addition of losses. Finally, we find that differences in consultants’ estimates of project performance can lead to differences up to $10/MWh in the levelized cost of energy for a wind plant.

Todd, Austin C.↗

A Strategy for Autogeneration of Space Shuttle Ground Processing Simulation Models for Project Makespan Estimations

Space Shuttle Processing is a complicated and highly variable project. The planning and scheduling problem, categorized as a Resource Constrained - Stochastic Project Scheduling Problem (RC-SPSP), has a great deal of variability in the Orbiter Processing Facility (OPF) process flow from one flight to the next. Simulation Modeling is a useful tool in estimation of the makespan of the overall process. However, simulation requires a model to be developed, which itself is a labor and time consuming effort. With such a dynamic process, often the model would potentially be out of synchronization with the actual process, limiting the applicability of the simulation answers in solving the actual estimation problem. Integration of TEAMS model enabling software with our existing schedule program software is the basis of our solution. This paper explains the approach used to develop an auto-generated simulation model from planning and schedule efforts and available data.

Madden, Michael G.↗

A Comparison of Preconstruction and Operational Wake Loss Estimates for Land-Based Wind Plants

Recent studies suggest that biases between wind plant pre-construction energy yield estimates and actual energy production are decreasing over time. However, variability in energy yield prediction accuracy across different projects and wind energy consultants remains high. Wake effects are one of the largest categories comprising the pre-construction energy yield assessment process. To assess the accuracy of wake loss predictions, we compare pre-construction wake loss estimates provided by 8 consultants to the estimated operational wake losses for 10 North American wind plants, as part of the Wind Plant Performance Prediction (WP3) Benchmark project. We estimate operational wake losses using supervisory control and data acquisition (SCADA) data by comparing total wind plant energy production to the potential energy production based on the power produced by freestream wind turbines. In the presentation, we will discuss the overall wake loss prediction bias as well as the project-to-project variability in the prediction accuracy. Further, we will highlight challenges encountered when estimating operational wake losses, including the impact of complex terrain and the presence of neighboring wind plants.

benchmark↗

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)↗

US Climate Variability and Predictability Project. Final Report

The primary goal of the US Climate Variability and Predictability (CLIVAR) Project Office is to enable science community planning and implementation of research activities to advance the program mission to understand and predict climate variability and change on intraseasonal-to-centennial timescales, through observations and modeling, with emphasis on the role of the ocean and its interaction with other elements of the Earth system, and to serve the climate community and society through the coordination and facilitation of research on outstanding climate questions.

54 ENVIRONMENTAL SCIENCES↗