Search NASA⌕ Search

SEARCH · Search NASA

Results for “verification tracking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Mission Operations and Command Assurance: Automating an Operations TQM Task

A long-term program is in progress at JPL to reduce cost and risk of mission operations through defect prevention and error management. A major element of this program, Mission Operations and Command Assurance (MO&QA), provides a system level function on flight projects to instill quality in mission operations. MO&CA embodies the Total Quality Management (TQM) principle of Continuous Process Inprovement (CPI) and uses CPI in applying automation to mission operations to reduce risk and costs. MO&CA has led efforts to apply and has implemented automation in areas that impact the daily flight project environment including Incident Surprise Anomoly tracking and reporting; command data verification, tracking, and reporting; and command support data usage. MO&CA's future work in automation will take into account that future missions systems must be designed to avoid increasing error through the introduction of automation, while adapting to the demands of smaller flight teams.

automation↗

Mission operations and command assurance - Automating an operations TQM task

A long-term program is in progress at JPL to reduce cost and risk of mission operations through defect prevention and error management. A major element of this program, Mission Operations and Command Assurance (MO&CA), provides a system level function on flight projects to instill quality in mission operations. MO&CA embodies the total quality management TQM principle of continuous process improvement (CPI) and uses CPI in applying automation to mission operations to reduce risk and costs. MO&CA has led efforts to apply and has implemented automation in areas that impact the daily flight project work environment including Incident Surprise Anomaly tracking and reporting; command data verification, tracking and reporting; and command support data usage. MO&CA's future work in automation will take into account that future mission operations systems must be designed to avoid increasing error through the introduction of automation, while adapting to the demands of smaller flight teams.

Welz, Linda↗

S&MA Internship to Support Orion and the European Service Module

As a University Space Research Association (USRA) intern for NASA Johnson Space Center (JSC) during the summer 2016 work term, I worked on three main projects for the Space Exploration Division (NC) of the Safety and Mission Assurance (S&MA) Directorate. I worked on all three projects concurrently. One of the projects involved facilitating the status and closure of technical actions that were created during European Service Module (ESM) safety reviews by the MPCV Safety & Engineering Review Panel (MSERP). The two main duties included accurately collecting and summarizing qualitative data, and communicating that information to the European Space Agency (ESA) and Airbus (ESA's prime contractor) in a clear, succinct and precise manner. This project also required that I create a report on the challenges and opportunities of international S&MA. With its heavy emphasis on soft skills, this project taught me how to communicate better, by showing me how to present and share information in an easy-to-read and understandable format, and by showing me how to cooperate with and culturally respect international partners on a technical project. The second project involved working with the Orion Thermal Protection System (TPS) Process Failure Modes and Effects Analysis (PFMEA) Working Group to create the first full version of the Orion TPS PFMEA. The Orion TPS PFMEA Working Group met twice a week to analyze the Avcoat block installation process for failure modes, the failure modes effects, and how such failure modes could be controlled. I was in charge of implementing changes that were discussed in meeting, but were not implemented real time. Another major task included creating a significant portion of the content alongside another team member outside the two weekly meetings. This project caused me to become knowledgeable about TPS, heatshields, space-rated manufacturing, and non-destructive evaluation (NDE). The project also helped me to become better at working with a small team and helped improved my technical communication skills. My main duty for the third project was creating a Safety Verification Tracking Log (SVTL) for the Orbital Maneuvering System Engine (OMS-E), and contacting subject matter experts to close Hazard Report (HR) control verifications. This project also required me to support other OMS-E safety process tasks, like monitoring OMS-E vibration testing for Quality Assurance (QA) purposes. This project helped me become even more proficient in Excel. Throughout the project, I gained knowledge about the OMS-E system and improved my understanding of pressure systems and propellant systems. In terms of education goals, this work term has affirmed my desire to take a few more space-related courses, like orbital mechanics, so that I can have a better understanding of human spaceflight and the industry surrounding it. However, the work term did not persuade me to pursue a master's degree. In terms of career goals, this work term has helped me clarify the direction I would like to head in the future. The perspective of three summer terms working for NASA in S&MA has allowed me to observe that most S&MA employees joined S&MA after working in other NASA directorates, such as Engineering or Flight Operations. It is my belief that it would be advantageous for both NASA and I for me to broaden my knowledge base and technical skill set by completing hands-on technical work on human spaceflight projects, and for me to integrate my safety experience directly into technical work in other directorates. The other significant advantage to this proposed situation is that if I were to eventually return to S&MA, I would be returning with a substantial set of hands-on technical experience and knowledge, which would be a significant resource for S&MA tasks and projects.

Hutcheson, Connor↗

Low cost tracking Navaids error model verification

Features and characteristics of the tracking navaids (Microwave Scanning Beam Landing System, Radar Altimeter, Tacan, rendezvous radar and one way Doppler extracter) were investigated. From the investigation, a set of specifications were developed for building equipment to verify the error model of the tracking navaids. Breadboard verification equipment (BVE) was built for the Microwave Scanning Beam Landing System and the radar altimeter. The breadboard verification equipment generates signals to the tracking navaids which simulate the space shuttles trajectory in the terminal area. The BVE simulates sources of navaids error by generating pseudorandom perturbations on the navaids signals. Differences between the trajectory value and the navaid derived values are taped and form the basis for the navaids error model.

Charych, A.↗

Block 2 SRM conceptual design studies. Volume 1, Book 2: Preliminary development and verification plan

Activities that will be conducted in support of the development and verification of the Block 2 Solid Rocket Motor (SRM) are described. Development includes design, fabrication, processing, and testing activities in which the results are fed back into the project. Verification includes analytical and test activities which demonstrate SRM component/subassembly/assembly capability to perform its intended function. The management organization responsible for formulating and implementing the verification program is introduced. It also identifies the controls which will monitor and track the verification program. Integral with the design and certification of the SRM are other pieces of equipment used in transportation, handling, and testing which influence the reliability and maintainability of the SRM configuration. The certification of this equipment is also discussed.

Source record↗

TOPEX/Poseidon orbit maintenance for the first five years

The TOPEX/Poseidon orbit maintenance strategy was changed following launch to include the effects of observed unmodeled, and hence anomalous, along-track accelerations. The anomalous force causes the semi-major axis, a, to either increase (called "boost") or decrease ("deboost" or "decay") depending on the satellite attitude and solar array pitch angle offset. Although this force is the most uncertain parameter in ground track prediction, it has been used as a passive technique for orbit maintenance, thereby reducing the number of propulsive maneuvers, enhancing maneuver spacing, and to place maneuvers at convenient times. This passive technique was first demonstrated in May 1993. The TOPEX/Poseidon orbit has been uniquely maintained using both passive (non-propulsive) and active (propulsive) maneuvers. Furthermore, the orbit has been maintained using only the passive technique since the ninth orbit maintenance maneuver on January 15, 1996. Only nine orbit maintenance maneuvers have been required to maintain the ground track, including verification site over flights, since achieving the operational orbit on September 21, 1992 (mission requirement: 95% within +/- l km). During this period, a has varied within 7,714,429 +/- 7 m, while the inclination i periodically fluctuated in the range 66.0408 deg. +/- 0.0040 deg. The frozen orbit (required e < 0.001 and omega approximately equals to 90 deg.) has been maintained without any dedicated eccentricity maneuvers. The frozen eccentricity vector has completed two periodic cycles and it is currently tracing its third cycle (period approximately equals 26.7 months).

Bhat, R. S.↗

JASON-1 Precise Orbit Determination (POD)with SLR and DORIS Tracking

Jason-1, the TOPEX/POSEIDON (T/P) radar altimeter follow-on, is intended to continue measurement of the ocean surface with the same, if not better accuracy. T/P has demonstrated that, the time variation of ocean topography can be determined with an accuracy of a few centimeters, thanks to the availability of highly accurate orbits based on SLR and DORIS tracking. For verification and cross-calibration, Jason-1, was initially injected into the T/P orbit, flying just 72 seconds ahead of T/P. This configuration lasted over 21 Jason cycles. In mid-August T/P was maneuvered into its final tandem configuration, a parallel groundtrack, in order to improve the combined coverage. Preliminary investigations using cycles 1-9, shown at the June 2002 SWT, indicated that nominal Jason orbits can achieve the 2-3 cm accuracy objective, however several puzzling aspects of SLR and DORIS measurement modeling were also observed. This paper presents recent analysis of Jason SLR+DORIS POD spanning more than 20 cycles, and revisits several of the more puzzling issues, including estimation of the Laser Retroreflector Array (LRA) offset. The accuracy of the orbits and of the measurement modeling are evaluated using several tests, including SLR, DORIS, and altimeter crossover residual analysis, altimeter collinear analysis, and direct comparison with GPS and other orbits. T/P POD results over the same period are used as a reference.

Zelensky, N. P.↗

Earth Science Enterprise Scientific Data Purchase Project: Verification and Validation

This paper presents viewgraphs on the Earth Science Enterprise Scientific Data Purchase Project's verification,and validation process. The topics include: 1) What is Verification and Validation? 2) Why Verification and Validation? 3) Background; 4) ESE Data Purchas Validation Process; 5) Data Validation System and Ingest Queue; 6) Shipment Verification; 7) Tracking and Metrics; 8) Validation of Contract Specifications; 9) Earth Watch Data Validation; 10) Validation of Vertical Accuracy; and 11) Results of Vertical Accuracy Assessment.

Jenner, Jeff↗

Real-time edge tracking using a tactile sensor

Object recognition through the use of input from multiple sensors is an important aspect of an autonomous manipulation system. In tactile object recognition, it is necessary to determine the location and orientation of object edges and surfaces. A controller is proposed that utilizes a tactile sensor in the feedback loop of a manipulator to track along edges. In the control system, the data from the tactile sensor is first processed to find edges. The parameters of these edges are then used to generate a control signal to a hybrid controller. Theory is presented for tactile edge detection and an edge tracking controller. In addition, experimental verification of the edge tracking controller is presented.

Berger, Alan D.↗

General Environmental Verification Specification

The NASA Goddard Space Flight Center s General Environmental Verification Specification (GEVS) for STS and ELV Payloads, Subsystems, and Components is currently being revised based on lessons learned from GSFC engineering and flight assurance. The GEVS has been used by Goddard flight projects for the past 17 years as a baseline from which to tailor their environmental test programs. A summary of the requirements and updates are presented along with the rationale behind the changes. The major test areas covered by the GEVS include mechanical, thermal, and EMC, as well as more general requirements for planning, tracking of the verification programs.

Milne, J. Scott, Jr.↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, the Intuitive Machines IM-1 NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan Anzalone↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, Intuitive Machines NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan J Anzalone↗

Performance and verification of the Keck Interferometer fringe detection and tracking system

We briefly discuss the instrument design of the Keck Interferometer from a hardware and realtime controls standpoint. We also show some recent visibility data from the instrument and summarize Fatcat's limiting sensitivity. Finally, we will discuss near and longterm evolution of the instrument through planned upgrades and summarize avenues for enhanced capability.

stellar↗

A Statistical Model to Predict the Extratropical Transition of Tropical Cyclones

This paper introduces a logistic regression model for the extratropical transition(ET) of tropical cyclones in the North Atlantic and the Western North Pacific, using elastic net regularization to select predictors and estimate coefficients.Predictors are chosen from the 1979-2017 best track and reanalysis datasets, and verification is done against the tropical/extratropical labels in the best track data. In an independent test set, the model skillfully predicts ET at lead times up to two days, with latitude and sea surface temperature as its most important predictors. At a lead time of 24 h, it predicts ET with a Matthews correlation coefficient of 0.4 in the North Atlantic, and 0.6 in the Western North Pacific. It identifies 80% of storms undergoing ET in the North Atlantic, and 92% of those in the Western North Pacific. 90% of transition time errors are less than 24 h. Select examples of the model's performance on individual storms illustrate its strengths and weaknesses.Two versions of the model are presented: an "operational model" that may provide baseline guidance for operational forecasts, and a "hazard model"that can be integrated into statistical TC risk models. As instantaneous diagnostics for tropical/extratropical status, both models' zero lead time predictions perform about as well as the widely used Cyclone Phase Space (CPS) in the Western North Pacific and better than the CPS in the North Atlantic, and predict the timings of the transitions better than CPS in both basins.

Melanie Bieli↗

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗