Warm Front End Upgrade for the PIP-II Linac

The warm front end for the PIP-II Linac consists of an Ion-source, an RFQ, and four buncher cavities. The LLRF systems for these were the first ones developed more than a decade ago for use at the test stands. Some were VXI crate based, and others used early generation FPGA boards that are light in resources. These LLRF systems and the one for the first superconducting cryomodule, the HWR will be upgraded with the ARRIA 10 SOC-FPGA chassis with EPICS interfaces like the rest of the PIP-II Linac. The RFQ and the HWR have unique resonance control systems which are integrated into the LLRF controller hardware. The results of the initial testing with a cavity emulator will be presented.

Reyes, Lennon [Fermilab] (ORCID:0009000891155652)↗

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Ding_MICRE_V1.0_Environmental_Parameters

The files contain the a variety of quantities useful in the analysis of MICRE datasets. Specifically, 1) Local meteorological conditions including: sea surface temperature (SST), lower tropospheric stability (LTS), marine cold air outbreak (MCAO) index, inversion height, and lifting condensation level (LCL). 2) Location relative to the oceanic polar front (PF), center of the closest cyclone, and nearest warm fronts and cold fronts 3) Location of air parcels 72 hours prior to its arrival at/above the MICRE site computed using the HYSPLIT back trajectory model

54 ENVIRONMENTAL SCIENCES↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Characterization of oceanic post-cold frontal clouds and their model representation. Final report

Low-level clouds are ubiquitous over the oceans, and their impact on the Earth’ radiative budget is important. However, general circulation models (GCMs) that are used to represent our climate and its evolution still experience problems to represent their correct amount and radiative impact. In the extratropical latitudes (~30-60 N/S), cloud properties are strongly modulated by the occurrence of anti-cyclones (high pressure systems) and cyclones (low pressure systems). While deep clouds dominate in cyclones near the center and along the cold and warm fronts, low-level clouds populate the colder regions of the cyclones, and more specifically the region in the wake of the cold fronts, the post-cold frontal region (PCF). The GCMs mentioned above were found to underestimate the amount of these PCF clouds, and this caused errors in their representation of the amount of solar radiation at the surface of the southern hemisphere oceans, causing an excess in absorption and errors in long-term predictions. To better understand which processes are ill-represented in the GCMs to cause such issues, we used ground-based observations from the Eastern North Atlantic (ENA) ARM site and a high resolution regional model (called WRF) to examine the properties of PCF clouds. With the WRF model, we simulated the passage of a cold front at the ENA site using theoretically distinct representations of convection and the physics of the boundary layer. While these physical representations had little impact on the timing, structure and circulation of the cold front, we found a high sensitivity to how the large scale information was fed into the model. Errors rapidly developed if the incoming flow information was injected too far from the site, but 1000 km was found to be an optimal distance between the outer boundary and the ENA site for a realistic cold front passage. With this model, we then conducted a series of experiment where convection and boundary layer schemes were changed, and revealed that 1) the clouds were more sensitive to the convection than boundary layer schemes and 2) the interaction between the two has a large impact. Furthermore, changing the representation of the physics in the model had greater impacts on PCF clouds than changing the initial conditions. As large-scale models increase their spatial resolution, convection will eventually be resolved but it remains that their representation of the physics of the boundary layer will matter for the correct representation of shallow (low-level) clouds. Observations were used to find which large-scale information had a clear relationship with PCF cloud and precipitation properties, in view of helping with GCM parameterizations and evaluation. Both lower troposphere stability and surface forcing were found to be important for PCF clouds that experience more vigorous dynamics than their tropical or subtropical counterparts. For cloud base and top heights, a simple measure of the change in potential temperature between the surface and the 800 hPa was found to be a good predictor. This relationship was found to hold as well when using data from campaigns recently conducted in the southern ocean south of Tasmania. A recent GCM was found to succeed in representing similar relations. For cloud depth, water content, and different characteristics of precipitation both the temperature contrast between the surface and near-air and the near-surface wind speed had a strong relationship. To summarize, through observational constraints and regional model experiments, the project has provided guidance to evaluate GCMs and tools to improve their representation of low-level clouds in the extratropics. It has also highlighted differences in behavior between these clouds and those typically found in the subtropics, thus opening new avenues of research for shallow clouds in general.

54 ENVIRONMENTAL SCIENCES↗

GEANT4 Simulations on Faraday Cup Design for PIP-II Laser Wire Scanner System

The PIP-II accelerator upgrade at Fermilab represents a groundbreaking leap forward in high-energy physics research. This ambitious initiative involves enhancing Fermilab's accelerator complex by replacing the current linear accelerator with a warm front end (WFE) capable of accelerating H- beams up to 2.1 MeV. Subsequently, a superconducting linac further accelerates these beams up to 800 MeV. To precisely measure the transverse beam profile, a combination of traditional wire scanners at the WFE section and Laser wire scanners along the superconducting linac are planned for implementation. This investigation centers on refining the Faraday cup design for the PIP-II Laser wire scanners by utilizing GEANT4, a Monte Carlo simulation toolkit. Leveraging this method enables a comprehensive analysis of particle trajectories, energy deposition, secondary electron emission, backscattering, etc., facilitating optimization through adjustments to cup geometries, materials, and placement to maximize its efficiency.

43 PARTICLE ACCELERATORS↗

Geant4-based Analysis of Faraday Cup Performance for PIP-II Laser Wire Scanner System

The Proton Improvement Plan-II (PIP-II) accelerator upgrade at Fermilab marks a significant advancement in high-energy physics research. This initiative aims to enhance Fermilab's accelerator complex by replacing the existing linear accelerator (linac) with a warm front end (WFE) capable of accelerating H- beams up to 2.1 MeV. Subsequently, a superconducting linac (SCL), that further accelerates these beams up to 800 MeV. To accurately measure the transverse beam profile, traditional wire scanners will be utilized in the WFE section, while Laser wire scanners will be implemented along the SCL. The Faraday cup for the Laser wire scanners has been designed using the GEANT4 simulation toolkit. This poster presents a detailed analysis of its performance along the SCL, focusing on electron absorption, secondary electron emission, backscattering, etc.

Wijethunga, S. A.K.↗

Controls Status for Fermilab’s PIP-II Project

Testing of Cryomodule first articles at PIP-II's on-site Cryomodule Test Facility (CMTF), where EPICS based controls are already being used, has been invaluable to the project. In addition to validating hardware and controls components, it has provided opportunities to build buy-in and illicit meaningful feedback early-on. A device naming convention has also been significantly refined with an internal working group and the PIP-II integration team. Compressed air and Process Control Water (PCW) systems have been installed, and operations has been engaged in Phoebus display development in preparation for a transition to operations for these systems by 2026. Cryoplant hardware has been put in place, and collaboration between controls and PIP-IIs cryo group for IOC and display development is well underway for commissioning of cryoplant systems to begin early 2026. The project has also received beneficial occupancy of the High-Bay Building in October 2025, keeping us on schedule for Warm Front End commissioning to begin in 2027.

Crisp, Dan [Fermilab]↗

Controls Status of Fermilab's PIP-II Project

The Fermilab Proton Improvement Project II (PIP-II) is building a new Super Conducting Linear Accelerator (SCL) accelerating protons to 800 MeV for injection into the rest of the FNAL beam complex. Key progress since the last status report given at ICALEPCS includes the adoption of modern DevOps practices with continuous integration and GitOps-based deployments, commissioning of EPICS-based systems at the Cryomodule Test Facility, and integration of a Virtual Accelerator framework for application development ahead of installation. In parallel, web-based applications using Dart and Flutter have matured, providing secure, unified access to both EPICS and legacy ACNET data. Data acquisition and timing systems have also evolved. This paper presents the current state of controls, emphasizing these recent developments and outlining upcoming milestones as PIP-II approaches commissioning of its cryoplant in 2026 and the Warm Front End in 2027.

Crisp, D. B. [Fermilab]↗

Cosmic Ray Mediated Thermal Fronts in the Warm-Hot Circumgalactic Medium

We investigate the 1D plane-parallel front connecting the warm ($10^4$ K) and hot ($10^6$ K) phases of the circumgalactic medium (CGM), focusing on the influence of cosmic rays (CRs) in shaping these transition layers. We find that cosmic rays dictate the thermal balance while other fluxes (thermal conduction, radiative cooling, and gas flow) adjust to compensate. We compute column density ratios for selected transition temperature ions and compare them with observational data. While most of our models fail to reproduce the observations, a few are successful, although we make no claims for their uniqueness. Some of the discrepancies may indicate challenges in capturing the profiles in cooler, photoionized regions, as has been suggested for by previous efforts to model thermal transition layers.

79 ASTRONOMY AND ASTROPHYSICS↗

Beam Profile Measurements Utilizing an Amplitude Modulated Pulsed Fiber Laser at PIP2IT

Fermilab is undertaking the development of a new 800 MeV superconducting RF linac to replace its present normal conducting 400 MeV linac. The PIP-II linac consists of a warm front-end generating 2 mA of 2.1 MeV H⁻ followed immediately by a series of superconducting RF cryomodules to 800 MeV. To limit the potential damage to the superconducting RF cavities, PIP-II will utilize laser-based monitors to obtain beam profiles via photoionization. This paper will present the results of transverse and longitudinal beam profile measurements using a prototype profile monitor that was tested with 2.1 MeV H⁻ beam at the PIP-II Injector Test (PIP2IT) accelerator. This prototype profile monitor utilizes a high repetition rate fiber laser and fiber optic transport into the PIP2IT enclosure. In addition, results will be shown of narrow-band electron detection from amplitude modulated laser pulses.

43 PARTICLE ACCELERATORS↗

Resonance Control System for the PIP-II IT HWR Cryomodule

The HWR (half-wave-resonator) cryomodule is the first one in the superconducting section of the PIP-II LINAC project at Fermilab. PIP-II IT is a test facility for the project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The HWR cryomodule comprises 8 cavities operating at a frequency of 162.5 MHz and accelerating beam up to 10 MeV. Resonance control of the cavities is performed with a pneumatically operated slow tuner which compresses the cavity at the beam ports. Helium gas pressure in a bellows mounted to an end wall of the cavity is controlled by two solenoid valves, one on the pressure side and one on the vacuum side. The resonant frequency of the cavity can be controlled in one of two modes. A pressure feedback control loop can hold the cavity tuner pressure at a fixed value for the desired resonant frequency. Alternately, the feedback loop can regulate the cavity tuner pressure to bring the RF detuning error to zero. The resonance controller is integrated into the LLRF control system for the cryomodule. The control system design and performance of the resonance control system are described in this paper.

43 PARTICLE ACCELERATORS↗

Performance of the LLRF System for the Fermilab PIP-II Injector Test

PIP-II IT is a test facility for the PIP-II project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The 8-cavity half-wave-resonator (HWR) cryomodule operating at 162.5 MHz is followed by the 8-cavity single-spoke resonator(SSR1) cryomodule operating at 325 MHz. The LLRF systems for both cryomodules are based on a common SOC FPGA-based hardware platform. The resonance control systems for the two cryomodules are quite different, the first being a pneumatic system based on helium pressure and the latter a piezo/stepper motor type control. The data acquisition and control system can support both CW and Pulsed mode operations. Beam loading compensation is available which can be used for both manual/automatic control in the LLRF system. The user interfaces include EPICS, Labview, and ACNET. Testing of the RF system has progressed to the point of being ready for a 2 mA beam to be accelerated to 25 MeV. The design and performance of the field control and resonance control system operation with beam are presented in this paper.

43 PARTICLE ACCELERATORS↗

Progress in developing a superconducting accelerator for efficient eBeam and X-ray production

The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.

43 PARTICLE ACCELERATORS↗

Timing and Synchronization in the LLRF systems of the Fermilab PIP-II Linac

The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.

Varghese, Philip↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴ speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously previously impossible with conventional tools while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

LLRF System for the Fermilab PIP-II Superconducting LINAC

PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting cryo-modules comprised of five different acceleration \(\beta\). The LLRF system for the LINAC has to provide field and resonance control for a total of 125 RF cavities.The LLRF system design is in the final design review phase and will enter the production phase next year. The PIP-II project is an international collaboration with various partner labs contributing subsystems. The LLRF system design for the PIP-II Linac is presented and the specification requirements and system performance in various stages of testing are described in this paper.

43 PARTICLE ACCELERATORS↗