Search NASA⌕ Search

SEARCH · Search NASA

Results for “waste characterization and management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Revolutionizing Waste Management: AI-Powered Real-Time Characterization for Efficient Handling of Non-Recyclable Municipal Solid Waste

According to EPA, -300 MM tons of municipal solid waste (MSW) was available in the US as of 2018. Of that total material, nearly 50% was landfilled resulting in a significant loss for the potential to convert its energy value into cost effective and sustainable biofuels. Redirecting this material away from the landfill and into conversion ready feedstock for energy generation can directly address DOE's selling price < $2.50/GGE while securing the US national energy independence [1]. However, the paramount challenges in any rational fuel conversion strategy are understanding the chemical makeup, quality and associated calorific value of the MSW. Understanding these parameters is critical in achieving any acceptable fuel conversion and requires rapid characterization followed by accurate separation technologies. Therefore, we are proposing to address the rapid characterization by building a non-invasive, rapid, and highly accurate Artificial Intelligence (AI)-enabled spectrometric/optical approach augmented with multi-sensory information for advanced characterization of domestic heterogeneous MSW. North Carolina State University (NCSU) and the National Renewable Energy Laboratory (NREL), in partnership with strong support from the Town of Cary and IBM, Inc., will closely work together to implement this ground-breaking technology for the effective characterization of MSW for sustainable and affordable production of conversion-ready feedstocks, while solving the environment issue of planetary proportions.

artificial intelligence↗

Paper or Plastic? Multiscale Material Handling Properties of Two Model Municipal Solid Waste Streams

Purpose: Municipal Solid Waste (MSW) is a potentially valuable sustainable feedstock for fuel and chemical production due to its carbon-rich content and low cost. This study aims to assess the material handling properties of paperand plastic-rich MSW feedstocks to mitigate equipment failure and processing downtime. Methods: The material handling properties of crumbled MSW feedstocks were measured using apowder rheometer with mass flow hopper calculations to assess handling performance. Inverse gas chromatography was use to measure the surface energy differences between feedstocks. Electron microscopy and Raman spectroscopy was used to evaluate microscale features that may contribute to material handling differences. Results: Plastic and paper rich feedstocks crumbled to a nominal 2 mm particle size were observed to have similar flow and handling characteristics with reasonable hopper outlets. 2 mm plastic rich crumbles, with their higher bulk density, exhibited superior flow performance. By contrast, 4 mm material required significantly larger hopper outlets, indicating poor flowability. Paper rich and 4 mm plastic rich samples displayed broad particle size distributions, which contributed to particle interlocking, jamming, and other flow issues. Electron microscopy revealed that plastic rich samples were significantly smoother, enhancing their flowability compared to the rougher, paper rich materials. Conclusions: This study establishes critical material handling baselines for processing MSW as a viable feedstock for fuel and chemical production. The findings highlight the importance of optimizing particle size and feedstock composition to improve flowability and handling performance.

09 BIOMASS FUELS↗

Synthesis and characterization of rhenium chalcogenides for nuclear waste management

A new synthetic approach to binary rhenium (Re) chalcogenides was investigated to aid in the preparation of analogous technetium (Tc) compounds for Tc waste management efforts. The Boron-Chalcogen Mixture (BCM) method was utilized for the first time to prepare polycrystalline powders of ReS 2 , ReSe 2 , and Re 2 Te 5 using a perrhenate, NaReO4, as a rhenium source. Single crystals of ReS 2 were also synthesized using the combined BCM and molten flux methods by adding a K 2 CO 3 flux to the reagent mixture. Thermal analysis using TGA/DSC revealed negligible changes from ambient temperature up to ∼300 °C followed by the oxidation of the Re chalcogenides. High Temperature PXRD was used to investigate the crystallinity of ReS 2 at various temperatures revealing an increase in crystallinity up to 275 °C followed by a decrease in crystallinity due to oxidation. The research presented herein demonstrates a significant step towards technetium waste treatment efforts.

Boron chalcogen mixture (BCM) method↗

Waste Compliance and Tracking System (WCATS) Version 3 Requirements Document

This document describes the end-user requirements for the Waste Compliance and Tracking System (WCATS) project in accordance with the WCATS Software Quality Management Plan, EPC-WMP-WCATSPLAN-001. The WCATS application shall support the generation, characterization, processing, and shipment of LANL radioactive, hazardous, and industrial waste. Regulatory drivers include RCRA hazardous waste, DOT shipping, NNSA nuclear material control and accountability, DOE nuclear safety, TSDF permit, and transuranic waste certification requirements. The system will utilize a task-based architecture that supports the spectrum of treatment, storage, disposal, administrative, and characterization based unit operations necessary to manage waste from cradle to grave. The application design shall readily accommodate new facilities, processes, workflow, signature requirements, and so forth, via end-user established metadata. WCATS will provide support for representing waste storage and disposal facilities, buildings, rooms, and grid layouts (x, y, z) to support waste and radioactive material inventory management. Nuclear material at risk (MAR), DOE hazard rating (e.g., Category II facility) compliance per DOE-STD-1027, and permit inventory requirements will be configurable for any storage or disposal facility, or waste operation, and the system will automatically evaluate and enforce those requirements. In addition, the application will support the characterization and management of the entire range of hazardous and radioactive wastes (TRU, MTRU, LLW, MLLW, hazardous waste, etc.) that might be colocated or processed at a permitted facility. Some capabilities not found in traditional systems include user-defined tank systems for liquid waste, user-defined work paths (i.e., sequence of operations), and an equipment subsystem for tracking the calibration, maintenance, and inspection of tools used to process waste, such as torque wrenches, scales, pH probes, etc. The application incorporates a desktop and mobile user interface as shown in Figure 1. The mobile interface supports field operations, such as waste item characterization, intra-facility transfers, internal and external audits, and shipment preparation and receipt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Functional Predictor Variables for the Leaching Potential of Arsenic and Selenium from Coal Fly Ash

The release of leachates from intact coal ash impoundments is a concern due to the enrichment and mobilization of toxic elements such as arsenic (As) and selenium (Se). This study aims to explore the intrinsic properties of coal fly ash that correlate with the relative leachability of As and Se. We performed leaching experiments with 52 fly ash samples collected from 15 different U.S. power plants and representing coal feedstocks from the three major domestic regions. We assessed the mobilization potential of As and Se in fly ash based on standardized leaching protocols and performed multivariate and lasso regression analyses to explore correlations of leachable As and Se contents with characteristics such as major element contents, loss on ignition, and pH. The results of regression models indicated that major elements (Fe, Ca, and Al) for a wide range of fly ashes can serve as predictor variables for the leaching potential of As but not for Se. LOI and pH were not important predictive variables in the models. Both regression approaches resulted in relatively strong fits for leachable As (correlation coefficient R 2 = 0.78 for both models) compared to models for leachable Se (R 2 = 0.49). Overall, these results suggest that correlation models combined with on-site elemental analysis with portable analyzers may enable a screening method for leachable As in coal ash.

01 COAL, LIGNITE, AND PEAT↗

Integrating Immersive Visualization in Molten-Salt Reactor Waste Management for Experimental Design and Planning

Molten-salt reactors (MSRs) represent a promising solution for next-generation nuclear energy, offering advantages in safety, fuel efficiency, and waste minimization. However, their liquid-fueled design presents unique challenges for spent fuel management, making post-shutdown waste characterization essential for developing effective strategies. Despite this need, there is a notable absence of visualization platforms specifically tailored to the unique characteristics and analytical requirements of MSR waste management. Existing tools in the nuclear industry are primarily designed for reactor operations or generic data exploration and lack both integration with MSR-specific multiphysics frameworks and the ability to simultaneously visualize time-dependent thermal fields, chemical composition evolution, and radiation distribution patterns. To address these limitations, this paper presents an immersive virtual reality (VR) visualization platform that processes and displays high-fidelity multiphysics simulation output from the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework in real-time, using Unity. The platform visualizes MSR waste characteristics such as nuclide decay, salt cooling, and corrosion by using Exodus II output data and running on a VR headset. It includes a user-friendly interface with features such as visibility toggling, cross-sectional slicing, and time-series animation for exploring simulation data. These capabilities support experimental design, stakeholder engagement, and public communication by making complex reactor behavior more accessible and understandable. By enhancing spatial reasoning and reducing cognitive load, this immersive environment fosters more effective communication and decision-making in MSR waste management.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A systematic analytical framework for multi-source municipal solid waste characterization for energy recovery

Advancing municipal solid waste (MSW) management from disposal-oriented practices toward circular, value-driven systems requires standardized methodologies capable of identifying material composition and resource recoverable potential at the point of generation. Despite extensive research, MSW characterization remains fragmented due to inconsistences in sampling methodologies, waste sorting categories, and temporal coverage across previous studies which limit cross-site comparability, reproducibility, and constrain the reliable evaluation of potential resource recovery pathways. This lack of consistency has hindered the development of a unified framework for MSW characterization and resource assessment. This study introduces a standardized, field-validated protocol for MSW sampling and composition analysis that ensures consistent, traceable data across diverse waste sources. The protocol integrates randomized spatial sampling, systematic material sorting, and controlled subsampling for multi-site and multi-season field campaigns. Validation included MSW collection from residential, grocery, restaurant, and school MSW streams across five U.S. states, including Maryland, Idaho, Virginia, Ohio, and Mississippi, to demonstrate the protocol’s ability to identify source-based composition patterns relevant to resource recovery applications. Grocery and restaurant streams were dominated by food waste and high-moisture organics, while school waste contained higher paper content and residential waste showed greater heterogeneity. Aggregation into energy-relevant fractions highlighted practical recovery pathways via anaerobic digestion or gasification, supporting data-driven planning, policy, and circular economy strategies for sustainable waste management across waste sources.

09 BIOMASS FUELS↗

Case Study: Systems Analysis of Y-12 Waste Sample Collection

The Environmental Management Organization has established a 90-Day Goal for characterizing, packaging, and dispositioning all waste after it has been declared. If adequate process knowledge is not available, a waste sample must be collected and analyzed. The objective of this case study is to reduce the cycle time for waste sample collection from 14.5 calendar days to 10 calendar days 95% of the time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Recovery of Critical Metals from Municipal Solid Waste Incineration Ashes

The dependence on international supplies and lack of diverse supplies of critical materials (such as rare earth elements, REEs) have prompted the US to explore new sources and develop environmentally friendly technologies for critical metal extraction, processing, and manufacturing. Secondary wastes have been explored for the recovery of REEs. Municipal solid waste (MSW) is a large solid waste stream and may constitute the largest resource for REEs and other critical metals; yet its incineration ashes (MSWI ashes) have received limited attention in terms of critical metal recovery. On the other hand, management of MSWI ashes also presents significant challenges both operationally and financially, such as landfill costs, volume reduction, and contaminant immobilization. To address the challenges associated with the management of and resource recovery from MSWI ashes, this project developed a closed-loop, integrated, scalable, and environmentally friendly waste management and resource recovery system. This system is characterized with maximum recovery of REEs, production of additional salable products, minimal production of secondary waste, and high immobilization of heavy metal contaminants.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Panel Session 89: Progress on Deep Repository Around the World

This panel focused on the progress of deep repository programs, worldwide. While efforts on a deep geological repository for SNF/UNF and HLW in the USA were terminated in 2010, several other repository programs continue to make considerable progress 10 and deserve to be recognized. Panelists from national, multi-national, and international repository programs and organizations reported on the status and future plans as well as the perceived reasons underlying the success and the failure of components of their respective repository program. This session provided a forum for interested parties to present, exchange, and take advantage of, as appropriate, repository progress, challenges, concepts/designs and other lessons learned around the world, including site characterization, site selection, research and development, licensing, construction, operation, and public acceptance and participation. Panelists with presentations: Switzerland's Geological Repository Program for Radioactive Waste (Tim Vietor); Update on NWMO's Progress in Implementing Canada's Plan (Sarah Hirschorn); Cigeo Project Progress and Next Milestones (Corinne Bauer)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Calibration and Uncertainty Estimation Using the Ensemble Kalman Filter with a Large Subsurface Flow and Transport Model - 20321

At routinely monitored groundwater contamination sites, periodically measured environmental conditions such as groundwater levels and contaminant concentrations are used to inform and confirm a conceptual site model (CSM) and guide the development and calibration of a numerical groundwater flow and transport model. The calibration of groundwater flow and transport models after each measurement (sampling) event can illuminate deficiencies in a CSM, identify areas where additional monitoring is warranted, and predict the behavior of the system to guide decision making. However, manual and automated (e.g. PEST) model calibration tools can be time-consuming and computationally expensive to implement after each sampling event. Perhaps as a result, such calibration tools generally utilize all available monitoring data simultaneously rather than sequentially assimilating monitoring data one sampling event at a time as the results from sampling become available. A more real-time data assimilation approach may reduce parameter uncertainty, quantify the value of additional monitoring data, and produce a usable model more quickly and with less effort. To mitigate the potential time-consuming aspects of manual and widely applied automated calibration techniques, a data assimilation algorithm called the ensemble Kalman filter (EnKF) was evaluated as a relatively efficient method of model calibration and uncertainty assessment via the sequential integration of monitoring data into a model. The EnKF was able to successfully and efficiently assimilate monitoring and modeling data to calibrate a complex flow and transport model at a real-world site with significant subsurface heterogeneity, uncertainty, and 12 years of monitoring data (over 4,000 individual measurements of groundwater levels and over 2,500 measurements of contaminant concentrations). Starting with an uncalibrated model data from annual sampling events were sequentially assimilated, and the resultant predication errors and estimated parameter uncertainties were tracked. After all monitoring data were assimilated, both flow and transport residuals at the end of the EnKF process were comparable to those produced via a concurrent PEST calibration effort but required fewer model simulations. Both uncertainty and prediction errors decreased over time. In a real-time application, the adequacy of the model could be assessed after each sampling event. The benefits of such a real-time approach to utilizing monitoring data include reduced costs (in the form of model updates or site characterization efforts), early flagging of possible errors in the CSM, and a reduced risk of overfitting and corresponding increased confidence in model predictions. This tool may be particularly useful compared to other calibration techniques (e.g. manual, PEST) when model runtimes are long, calibration parameters are many, or parameter uncertainty is large. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Projects on RW Recycling from the French 'Investments for the Future' Program - 20023

The extent and duration of French dismantling operations require to anticipate at the earliest possible stage the management of the large volumes of radioactive waste that will be generated, and to engage collectively in sustainable innovation processes. To anticipate all constraints and requirements related to radioactive waste management and secure the long-term compatibility with waste disposals, the French State has decided to give to Andra, within the 'Investissements d'Avenir' program, an endowment to support innovation at all steps of radioactive waste life cycle with a special emphasis on the dismantling process. Currently, some 30 R and D projects dealing with the optimization of dismantling radioactive waste management are underway. They aim at providing strong innovations in terms of characterization, processing, conditioning and disposal of post dismantling radioactive waste. A specific focus will be made on those dealing with radioactive waste and radionuclides recycling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Nuclear Material Hold-up Measurement

Facilities that process special nuclear material (SNM) generally have a variety of equipment, shielding, and nearby radiation sources, which can pose challenges when performing nondestructive analysis (NDA) within the facility, as shown in Figure 1. In this figure, the left image features two individuals performing a holdup measurement of a large duct at a posting, utilizing a detector probe attached to a yardstick to reduce some aspect of the measurement uncertainty. Note that the distance to the holdup within the pipe from the posting cannot be accounted for. The right image similarly features several individuals guiding a holdup measurement of a ducting pipe several meters overhead, by attaching a detector probe to a long handle and lining that up with a posting on the outside of the pipe. SNM processing begets SNM holdup, and this difficulty with accurate NDA can result in unaccounted accumulation of SNM holdup within a process or area. Normal SNM processing operations can accumulate holdup within filters, pumps, pipes, ducts, other equipment, and facility support systems, as demonstrated by Figure 2. It is important for deactivation and decommissioning (D&D) gloveboxes and their ancillary equipment, material accountability, criticality safety, facility operations, waste management, radiation safety, and security to accurately characterize the location, composition, and quantity of this holdup to minimize these associated risks and potential diversion pathways. Current NDA techniques for assay of holdup are expensive, time consuming, and have high uncertainty.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrating Immersive Visualization in Molten-Salt Reactor Waste Management for Experimental Design and Planning

The Molten Salt Reactor (MSR) represents a significant innovation in nuclear technology, offering several operational and safety benefits over traditional solid-fuel reactors. However, MSRs face uncertainties in waste management due to their flexible designs and variable waste compositions. To address these challenges, we propose a visualization platform that illustrates solutions and performance predictions for various waste management strategies, enhancing user experience and improving strategy and communication. Immersive visualizations are widely used in the nuclear industry for training, simulation, and safety enhancement. Our project aims to develop a visualization platform incorporating virtual reality (VR) technologies to illustrate MSR characteristics immediately following reactor shutdown. This immersive simulation will allow users to interact, explore, and understand different waste management strategies. The platform will display MSR reactor characterizations, including nuclide decay, salt solidification, and corrosion, which are crucial for assessing and selecting backend management strategies. Using the Meta Quest 3 VR headset with Unity software, our platform will provide real-scale visualizations, enabling users to experience and evaluate designs and plans as if they were physically present. This user-friendly interface will make complex data accessible and understandable for non-domain experts, aiding in decision-making for MSR waste management. Our proposed visualization workflow can be applied to other nuclear reactors, assisting in the design and planning of waste management strategies.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The HRA/Solarium Project: Feedback Based on 20 Years of Experience in Treatment of Medium Level Waste - 20185

Since the 1980's the management of the historical site of Mol has been transferred to the National Agency for Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS). Belgoprocess is entrusted by ONDRAF/NIRAS with the operational waste management and site remediation. One of the major challenges has been the characterization, treatment and conditioning of approximately 200 m{sup 3} of medium level waste. These waste packages were stored in poor conditions in storage vaults ('HRA') or concrete containers ('Solarium'). They have been produced in various research programs and reactor operations at the Belgian nuclear energy research centre SCK.CEN, isotope production, decontamination and dismantling operations from the 1960's up to the 1980's. Despite the limited volume, this historical waste consists of a great variation of waste characteristics and waste configurations. To tackle these liabilities, a new processing facility was built in the 1990's to allow safe transfers, handling, characterization and treatment of these packages. Also some auxiliary facilities have been built to deal with the by-products, like emptied concrete containers. The engineering of the installation, safety procedures and (characterization) methodology that has been developed generically have been proved to be successful. Nevertheless, the specific nature of some items made it necessary to organize a step-by-step treatment in distinct campaigns in which some relevant extra (safety) measures had to be taken into account. This dynamic approach made it possible to process a great variety of waste types in order to to ensure that this legacy is no longer left for subsequent generations. After about 20 years of operations, there has been a great build-up of experience and feed-back concerning the waste management of these specific waste streams. Some cases will be highlighted to specify the approach followed for treatment of e.g.: - Na/NaK containing equipment; - spent radioactive sources; - fuel element residues; - medium level waste originating from activation experiments; - radium bearing medium level waste originating from Ac-227 production research. (authors)

07 ISOTOPE AND RADIATION SOURCES↗