Search NASA⌕ Search

SEARCH · Search NASA

Results for “waste shipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex (Q3 Transportation Report, FY 2019)

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 3 and Area 5. This report summarizes the third quarter of fiscal year (FY) 2019 and serves as a quarterly report for the following types of shipments: • Low-Level Radioactive Waste (LLW), • Mixed Low-Level Radioactive Waste (MLLW), • Classified Non-Radioactive (CNR) Waste, and • Classified Non-Radioactive Hazardous (CNRH) Waste. Tabular summaries are provided that include the following: • Number and external volume of LLW, MLLW, and CNR/CNRH shipments, • Waste generators for LLW, MLLW, and CNR/CNRH shipments to and on the NNSS, • Carriers for LLW, MLLW, and CNR/CNRH shipments to and on the NNSS, • Waste generator shipments by quarter, • Highway routes used by carriers, and • Incident and accident data applicable to LLW, MLLW, and CNR/CNRH shipments. In this report, shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. Volume reports using the Low-Level Waste Information System showing cubic feet (ft 3 ) of waste generated may vary slightly due to rounding conventions for conversions from cubic meters to ft 3 .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Second Quarter Transportation Report - Fiscal Year 2021 - Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex

This report satisfies the U.S. Department of Energy (DOE) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 5. This report summarizes the second quarter of fiscal year (FY) 2021 and serves as a quarterly report for the following types of shipments: Low-Level Radioactive Waste (LLW) Mixed Low-Level Radioactive Waste (MLLW) Classified Non-Radioactive (CNR) Waste Classified Non-Radioactive Hazardous (CNRH) Waste

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Second Quarter Transportation Report Fiscal Year 2019 Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 3 and Area 5. This report summarizes the second quarter of fiscal year (FY) 2019 and serves as a quarterly report for the following types of shipments: Low-Level Radioactive Waste (LLW), Mixed Low-Level Radioactive Waste (MLLW), Classified Non-Radioactive (CNR) Waste, Classified Non-Radioactive Hazardous (CNRH) Waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Shipments to and from the Nevada National Security Site (NNSS), Radioactive Waste Management Complex (Q4 and Annual Transportation Report (FY 2019)

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site Radioactive Waste Management Complex in Area 3 and Area 5. This report summarizes the fourth quarter of fiscal year 2019 and serves as an annual report for the following types of shipments: Low-Level Radioactive Waste, Mixed Low-Level Radioactive Waste, Classified Non-Radioactive Waste, Classified Non-Radioactive Hazardous Waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex (Transportation Report, Q1 FY2020)

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site Radioactive Waste Management Complex in Area 5. This report summarizes the first quarter of fiscal year 2020.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex, FY19 First Quarter Transportation Report

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 3 and Area 5. This report summarizes the first quarter of fiscal year (FY) 2019 and serves as a quarterly report for the following types of shipments: Low-Level Radioactive Waste (LLW) Mixed Low-Level Radioactive Waste (MLLW) Classified Non-Radioactive (CNR) Waste Classified Non-Radioactive Hazardous (CNRH) Waste

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex (Q3 Transportation Report, FY20) Transportation Report

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 5.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FOURTH QUARTER / ANNUAL TRANSPORTATION REPORT FISCAL YEAR 2021

Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex. This report satisfies the U.S. Department of Energy (DOE) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 5.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

4th Quarter and Annual Transportation Report FY2018

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 5. This report summarizes the fourth quarter of fiscal year (FY) 2018 and serves as an annual report for the following types of shipments: Low-Level Radioactive Waste (LLW); Mixed Low-Level Radioactive Waste (MLLW); Classified Non-Radioactive (CNR) Waste; Classified Non-Radioactive Hazardous (CNRH) Waste; Tabular summaries are provided that include the following: Number and external volume of LLW, MLLW, and CNR/CNRH shipments; Waste generators for LLW, MLLW, and CNR/CNRH shipments to and on the NNSS; Carriers for LLW, MLLW, and CNR/CNRH shipments to and on the NNSS; Waste generator shipments by quarter; Highway routes used by carriers; Incident and accident data applicable to LLW, MLLW, and CNR/CNRH shipments. In this report, shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. Volume reports showing cubic feet (ft 3 ) generated using the Low-Level Waste Information System may vary slightly due to rounding conventions for conversions from cubic meters to cubic feet. Shipments are transported by motor carriers that are either identified on the U.S. Department of Energy (DOE) Motor Carrier Evaluation Program (MCEP) list, have been evaluated in a manner similar to the MCEP process, or are government vehicles. Government vehicles are not evaluated using the MCEP process but are fully compliant with all transportation regulations and requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum 2 to the Closure Report for CAU 577 Area 5 Chromium Containing Waste Disposal Cells, NNSS, Nevada

Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site Area 5 Radioactive Waste Management Site where buried waste received from Nuclear Fuel Services, Inc., was subsequently determined to contain chromium that exceeded the toxicity characteristic leaching procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) on April 25, 2019 (NDEP 2019). The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste and documentation of that closure through FFACO-type documents. The following three Corrective Action Sites (CASs) were closed, and their closure was documented in the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030, dated September 2021 (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021a): • CAS 05-21-02, Waste Disposal Cell 12 • CAS 05-21-03, Waste Disposal Cell 15 • CAS 05-21-04, Waste Disposal Cell 17 Closure of the following CAS was previously documented in the Addendum to the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030-ADD, dated September 2022 (DOE EM Nevada Program 2022): • CAS 05-21-05, Waste Disposal Cell 20 This second addendum to the Closure Report documents the closure activities that have occurred for CAS 05-21-06, Waste Disposal Cell 21. This is the last CAS in CAU 577. The final waste shipment was placed in the waste disposal cell on November 21, 2022. Following this, closure activities began on November 28, 2022, and were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 577 (DOE EM Nevada Program 2021b). The following closure activities were performed: • Constructing an engineered evapotranspiration cover • Installing two subsidence monuments and vadose zone monitoring equipment • Seeding the cover with a mixture of native plant species • Installing four concrete monuments on the corners of the cover and placing two use restriction (UR) warning signs on each monument These activities fulfill applicable federal and state regulations for closure of CAS 05-21-06 and minimize potential future exposure pathways to buried waste. Completed closure activities are also consistent with closure of the nine historical Resource Conservation and Recovery Act (RCRA) units included in Section 10.2.2 of the RCRA Permit that governs hazardous waste management activities at the Nevada National Security Site (Permit NEV HW0101) (NDEP 2023). UR documentation for this CAS is included in Appendix B of this report. The post-closure plan is presented in detail in the CADD/CAP for CAU 577 (DOE EM Nevada Program 2021b), and the requirements are summarized in Section 5.2 of this document. In accordance with paragraph 5D of the SA, a request to incorporate the requirements for post-closure monitoring of CAU 577 was included with the permit application for RCRA Permit NEV HW0101 that was submitted in January 2022 (NNSA/NFO 2022). The request included the post-closure requirements for the three CASs that had been closed at the time of submittal of the application as well as requirements that would be implemented upon future approval of closure of the remaining two CASs. All CAU 577 post-closure monitoring requirements have been captured in the April 4, 2023, Revision 7 of the RCRA Permit (NDEP 2023). As the RCRA Permit NEV HW0101 has been revised since the submittal of the original CAU 577 Closure Report (DOE EM Nevada Program 2021a) and Addendum 1 (DOE EM Nevada Program 2022), the post-closure requirements in this Addendum 2 report do not align with the previous documents. Specific changes resulting from the issuance of Revision 7 of the RCRA Permit are discussed in Section 5.2 of this report. The requirements in this report are consistent with the current permit (NDEP 2023) and supersede all requirements listed in the CAU 577 Closure Report and Addendum 1. All CAU 577 post-closure requirements should be conducted in accordance with the version of the RCRA Permit that is current at the time of the activities being performed. The DOE EM Nevada Program is requesting a Notice of Completion from NDEP for closure of CAU 577. Although CAU 577 is not a legacy site, the FFACO process is being followed to ensure proper closure of the chromium-containing waste. Therefore, transfer of CAU 577 from Appendix III of the FFACO to Appendix IV, Closed Corrective Action Units, is requested, as all closure activities have been completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 14: US DOE WIPP - Future Plans for the Utilization of a National Asset

This panel focused on the next phase of restoring the Waste Isolation Pilot Plant (WIPP: located in Carlsbad, New Mexico, USA) to full disposal operations. The US DOE Carlsbad Field Office (CBFO) is funded for two Capital Asset Projects that will facilitate the restoration of WIPP to full capability and allow for future repository space planning. The panel will include updates on the capital projects, infrastructure improvements to extend WIPP's operational life, regulatory actions in support of capital projects, and improvements in new processes to implement WAC and DSA enhancements. This panel is filled by CBFO and WIPP contractor leaders to provide the big picture leading to WIPP's future. Presentations proposed include: 1 - 2018 WIPP Year in Review (Bruce Covert, Nuclear Waste Partnership, LLC (USA)); 2 - TRU Waste Shipments and WIPP Operations (Mark Pearcy, Nuclear Waste Partnership, LLC (USA)); 3 - Projects and Activities at WIPP (Ronald Gill, US DOE (USA)); 4 - The Future of WIPP (J.R. Stroble, US DOE (USA), Todd Shrader, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗