Search NASA⌕ Search

Engineering topics

Ali Feizi

Publications and source records attributed to Ali Feizi.

Development of LISA Laser System at NASA

NASA Goddard Space Flight Center (GSFC) is developing a master oscillator power amplifier (MOPA) laser transmitter for the Laser Interferometer Space Antenna (LISA) mission. The laser transmitter is one of the potential contributions to the LISA mission from NASA. Our development effort has included a master oscillator (MO), a power amplifier (PA), a frequency reference system (FRS), a power monitor detector (PMON), and laser electronics module (LEM). We are working on their design, performance evaluation, environmental testing, and reliability testing for space flight. We have built TRL 4 laser optical modules based on the MO and PA, which meets most performance requirements. One of the TRL 4 laser optical modules has been delivered to ESA for independent evaluation. TRL 6 versions of MO and PA are being built and evaluated at GSFC. TRL 5 and 6 versions of laser electronics are under development. In this paper, we will describe our progress to date and plans to demonstrate and deliver a TRL 6 laser demonstrator system to ESA by 2024.

LISA, Space Lasers↗

Performance Testing of TRL4-6 LISA Laser System

The Laser Interferometer Space Antenna (LISA) is an ESA-led future mission to measure gravitational waves from astronomical sources in space. LISA has been adopted as a formal mission by ESA in January 2024, and is expected to become a formal project at NASA within 2024. The laser system (LS), which includes four laser heads (LH) each containing a laser optical module (LOM) and laser electronics module (LEM), a frequency reference system (FRS, optical frequency reference) and four power monitor detectors (PMON), is one of the three U.S. contributions to LISA from NASA. The Lasers and Electro-Optics Branch at NASA GSFC has been developing and managing the design of the LISA LS. Currently, the TRL (technology readiness level) of the NASA LISA laser system is transitioning from 4 to 6. TRL 4/5 LISA LOM was sent to ESA in early 2023 and has undergone optical performance testing. [1] By late summer of 2024, NASA plans to deliver the TRL 6 LOM to ESA for performance evaluation. Since the delivery of the TRL4/5 LOM to ESA, we have taken steps to advance the TRL of the overall LS and have also started end-to-end system level testing involving other subsystems. They include 1) optical performance test of TRL6 LOM and TRL 5 LEM under thermal cycling, 2) end-to-end test of the laser head (LH) and the GSE (ground support equipment) FRS, driven by TRL 4 FRS electronics (FRS-E) provided by Ball Aerospace, 3) end-to-end test of the laser head (LH) with the GSE phase meter system (PMS) provided by Albert Einstein Institute, and 4) optical performance test of the LH with the PMON subsystem developed by NASA. The FRS, PMS, and PMON provide necessary frequency stability, relative phase stability between lasers, and output power stability, respectively. Since they are all vital for the sensitive laser interferometry performed in LISA, it is necessary to perform these system level testing by combining the LH and other subsystems, and to prove the optical performance at an early stage during the LS development. Our recent work has successfully demonstrated the intra-connectivity of the LS, as well as critical external interface with the PMS to meet the LISA’s performance requirements. In this talk, we will report on the latest status of the LH testing and system level test. We will also discuss the paths to bring each subsystem to TRL6+ and plans for future system level testing.

LISA↗

Overview of the NASA LISA Laser System Development

NASA Goddard Space Flight Center (GSFC) is developing the Laser System (LS) for the Laser Interferometer Space Antenna (LISA) mission, led by the European Space Agency (ESA) with a launch date of 2035. The LS under development at NASA GSFC consists of the Laser Head (LH), the Frequency Reference System (FRS), and the Power Monitor (PMON) Detector Assemblies. Since late 2017, we have been developing various models to advance the technology readiness level (TRL) for the LH from prototype (TRL4) to a system model demonstration in a relevant environment (TRL6). For the LH and FRS, the models further breakdown into the optical and electronics modules where the LH is made up of the Laser Optical Module (LOM) and the Laser Electronics Module (LEM) and the FRS consists of the FRS Optical Reference Cavity (FRS-O) and the FRS Electronics (FRS-E). The LS development follows the established NASA process in demonstrating the performance requirements [1] through the TRL4 effort and then advancing the form factor and package design to meet relevant environment requirements and qualifying the TRL6 design through rigorous testing and performance verification for space applications. The LOM for the LH is a main oscillator power amplifier (MOPA) with wavelength of 1064 nm and nominal output power of 2 Watt throughout the mission. The low-power, low-noise main oscillator (MO) is a custom micro non-planar ring oscillator (µNPRO) [2] that is phase modulated then amplified by the forward pumped ytterbium-dope fiber power amplifier (PA) stage to meet the output power requirement. The FRS is baselined on the GRACE Follow-On (GFO) [3] approach with updated FRS-E design to work with the LH-LEM. The PMON is located on the Optical Bench Assembly (OBA) [4] that samples a small portion of the LH output signal and provides the feedback signal to the LH-LEM for relative intensity noise (RIN) control. In this paper, we will report on the latest status of the LH testing and system level tests, explain the other subsystems involved in the test campaigns, and discuss the path to bring each LS subsystem to TRL6. We will also present the NASA GSFC roadmap in advancing the LISA LS to TRL6+ and plans for future system level testing as well as the preparation for space flight development to meet the LISA launch date of 2035.

amplifier↗