Search NASA⌕ Search

Engineering topics

Allison, Trent

Publications and source records attributed to Allison, Trent.

Calibration of the analog beam-signal hardware for the credited engineered beam power limit system at the Proton Power Upgrade Project at the Spallation Neutron Source

A programmable signal processor-based credited safety control that calculates pulsed beam power based on beam kinetic energy and charge was designed as part of the Proton Power Upgrade (PPU) project at the Spallation Neutron Source (SNS). The system must reliably shut off the beam if the average power exceeds 2.145 MW averaging over 60 seconds. System calibration requires pedigree in measurements, calibration setup, and calculations. This paper discusses the calibration of the analog beam signal components up to and including the Analog Digital Convertors (ADCs) for implementation into the Safety Programmable Logic Controllers (PLCs) and Field Programmable Gate Arrays (FPGAs).

Bobrek, Miljko↗

OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been deliver-ing 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher QL (~ 3×107) op-erations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper re-ports on the C100 operation and optimization improve-ments of the RF system and cryomodules.

Hovater, James↗

Beam position reconstruction for the g2p experiment in Hall A at Jefferson Lab

Beam-line equipment was upgraded for experiment E08-027 (g2p) in Hall A at Jefferson Lab. Two beam position monitors (BPMs) were necessary to measure the beam position and angle at the target. A new BPM receiver was designed and built to handle the low beam currents (50-100 nA) used for this experiment. Two new super-harps were installed for calibrating the BPMs. In addition to the existing fast raster system, a slow raster system was installed. We found that before and during the experiment, these new devices were tested and debugged, and their performance was also evaluated. In order to achieve the required accuracy (1-2 mm in position and 1-2 mrad in angle at the target location), the data of the BPMs and harps were carefully analyzed, as well as reconstructing the beam position and angle event by event at the target location. Finally, the calculated beam position will be used in the data analysis to accurately determine the kinematics for each event.

43 PARTICLE ACCELERATORS↗

CEBAF SRF Performance during Initial 12 GeV Commissioning

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

43 PARTICLE ACCELERATORS↗

Signal Processing Board for Beam Loss Monitors

This paper describes a new VME based machine protection Beam Loss Monitor (BLM) signal processing board designed at Jefferson Lab which features high sensitivity, high resolution, and low cost per channel. This double-wide VME board provides eight-channel signal processing with each channel having linear, logarithmic, and integrating amplifiers that simultaneously provide the optimal signal processing for both machine protection and beam diagnostics. Amplified signals are independently sampled by 16-bit, fast ADCs and then further processed through a Field Programmable Gate Array (FPGA). It also has features of fast shutdown interface (FSD), beam sync interface, built-in-self-test, remotely controlled bias signals, and on-board memory buffer. The initial experimental test shows that the BLM board has fast response (<< 1us) for integrating and wide dynamic range from 10 nA to 1 mA (>50 dB) for logarithmic signals. The board is suitable for signal processing from photomultiplier (PMT) and ion chamber detectors. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

Yan, Jianxun↗

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

43 PARTICLE ACCELERATORS↗

LLRF Commissioning of the new CEBAF 100 MeV Cryomodule

Commissioning of the 100 MeV cryomodule (CEBAF acronym C100) is part of the CEBAF energy upgrade to 12 GeV at Jefferson Lab. LLRF commissioning includes field control, cavity interlocks, resonance controls (Stepper Motor and Piezo tuner) and operational software. All the above mentioned systems and software are calibrated and tested on the bench and in test platforms prior to installation. Once installed and connected to the cryomodule, the system supports cavity commissioning (Emax, Qo etc.). In addition the LLRF system is calibrated (gradient and RF power), optimized (system gains and set points) and functionality is tested for operability. This poster describes the detailed description of various stages of commissioning of first 100 MeV cryomodule.

Bachimanchi, Ramakrishna↗

PC/104 Asyn Drivers at Jefferson Lab

Asyn Driver was applied for PC/104 IOC serial communication systems at Jefferson Lab. We chose the ines GPIB-PC/104-XL as the GPIB interface module and developed the low lever device driver that is compatible with the asynDriver. Instrument device support was created to provide access to the operating parameters of GPIB devices. Low level device driver for the serial communication board Model 104-COM-8SM was also developed to run under asynDriver. This serial interface board contains eight independent ports and provides effective RS-485, RS-422 and RS-232 multipoint communication. StreamDevice protocols were applied for the serial communications. The asynDriver in PC/104 IOC applications provides a standard interface between the high level device support and hardware level device drivers. This makes it easy to develop the GPIB and serial communication applications for PC/104 IOCs.

Yan, Jianxun↗

Status of the CEBAF Energy Upgrade RF Control System

To support the CEBAF energy upgrade from 6 GeV to 12 GeV, the RF control system is being modernized to control the high gradient high QL superconducting cavities. 80 new LLRF systems are being built to support the upgrade. The new system incorporates a heterodyne transceiver along with I&Q sampling to measure and control magnitude and phase. A low-cost Altera FPGA is used to digitally implement the cavity control algorithms. One of the features of the system is a digital self excited loop to track the cavity over large Lorentz detuning (800 Hz) during turn on. The system has successfully completed preliminary development and is now moving into the production stage of the project. This paper discusses the design, modeling, testing and production of the new RF control system and associated peripheral systems (cavity interlocks, and resonance control).

Hovater, James↗