DOE OSTI · 1223471
CEBAF SRF Performance during Initial 12 GeV Commissioning
Abstract
The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Bachimanchi, Ramakrishna, Allison, Trent, Daly, Edward, Drury, Michael, Hovater, J, Lahti, George, Mounts, Clyde, Nelson, Richard, Plawski, Tomasz. 2015-09-01. CEBAF SRF Performance during Initial 12 GeV Commissioning. https://searchnasa.com/record/osti%3A1223471/cebaf-srf-performance-during-initial-12-gev-commissioning
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.