CEBAF SRF Performance during Initial 12 GeV Commissioning

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

43 PARTICLE ACCELERATORS↗

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

43 PARTICLE ACCELERATORS↗

RF CONTROL OF HIGH QL SUPERCONDUCTING CAVITIES

In the last 20 years the requirements for RF Control have increased as the target use has broadened from electron/ion accelerators for Nuclear and Particle Physics to light sources such as Free Electron Lasers. The increasing requirement of cavity field control to meet the spectral and jitter performance specifications for light sources has led system designers to a more rigorous approach in designing the RF controls. Design attention must be applied not only to the hardware and control algorithms but also to the overall accelerating system to meet performance and cost requirements. As an example, cavity QL in Energy Recovery Linacs (ERL) must be optimized such that the RF controls can accommodate the lowest possible RF power given the background cavity microphonics. This paper presents the status and future directions of high QL superconducting RF control systems.

43 PARTICLE ACCELERATORS↗

Observation and Mitigation of Multipass BBU in CEBAF

Abstract The Continuous Electron Beam Accelerator Facility (CEBAF) recirculating accelerator at Jefferson Lab consists of two linacs carrying beam for up to five passes of acceleration. The design of this accelerator anticipated the onset of multipass beam break-up (BBU) at a beam current of approximately 20 mA, far above the operational peak current of 200 uA. For more than a decade of operation, no sign of BBU was ever observed. However, a specially designed acceleration cavity in a cryomodule installed in the summer of 2007 has been observed to cause BBU instability with as low as 40 uA of injected beam current. This presented an opportunity to study BBU in a five-pass accelerator. In this paper we will discuss multipass BBU, present observational data, and discuss the ways we have developed to maintain the instability threshold current to values above those required for operation.

43 PARTICLE ACCELERATORS↗

New RF Control System for the 12 GeV Energy Upgrade of the CEBAF Accelerator at Jefferson Lab

The CEBAF Accelerator at Jefferson Lab presently consists of 50 MeV injector, two anti-parallel superconducting linacs and two arcs for transporting beam between the linacs. By the mid-1990s, the accelerator was providing electrons up to 5.75 GeV. The 12 GeV Upgrade is a major accelerator project aimed at doubling the energy by adding 10 (five per linac) new high gradient cryomodules, each providing 100 MV of field. The new cryomodule will consist of eight 7-cell superconducting cavities operating at an average accelerating gradient of 19.5 MV/m and with an external Q=3.2 x 10^7. The high gradient, very high quality factor and large Lorentz detuning coefficient (KL up to 4) pose significant challenges beyond what the present analog low level RF (LLRF) control systems can handle reliably; therefore, a new digital LLRF control system has been developed. The main highlights of the new RF Control system include: a RF front-end with low temperature drift and good linearity, a large FPGA

43 PARTICLE ACCELERATORS↗