Search NASA⌕ Search

Engineering topics

Bachimanchi, Ramakrishna

Publications and source records attributed to Bachimanchi, Ramakrishna.

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of the Continuous Electron Beam Accelerator Facility (CEBAF), one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities during these trip events. These challenges make the identification of an unstable cavity out of the hundreds installed at CEBAF a difficult and time-consuming task. To tackle these issues, a fast data acquisition system (DAQ) for the legacy SRF cavities has been developed, which records the sample at 5 kHz. A Principal Component Analysis (PCA) approach is being developed to identify anomalous SRF cavity behavior. We will discuss the present status of the DAQ system and PCA model, along with initial performance metrics. Overall, our method offers a practical solution for identifying unstable SRF cavities, contributing to increased beam availability and machine reliability.

Carpenter, A.↗

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of the Continuous Electron Beam Accelerator Facility (CEBAF), one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities during these trip events. These challenges make the identification of an unstable cavity out of the hundreds installed at CEBAF a difficult and time-consuming task. To tackle these issues, a fast data acquisition system (DAQ) for the legacy SRF cavities has been developed, which records the sample at 5 kHz. A Principal Component Analysis (PCA) approach is being developed to identify anomalous SRF cavity behavior. We will discuss the present status of the DAQ system and PCA model, along with initial performance metrics. Overall, our method offers a practical solution for identifying unstable SRF cavities, contributing to increased beam availability and machine reliability.

Carpenter, A.↗

CEBAF Photo Gun RF System

During the CEBAF 12 GeV Upgrade at Jefferson Lab, a fourth experimental hall, ?D?, was added to the existing three halls. To produce four beams and deliver them to all halls concurrently requires new frequencies and a new timing pattern of the electron bunches. Since a photo-gun is used to produce electron bunches, the gun?s drive laser pulses need to be synchronized with the required bunch rate frequencies of 499 MHz or 249.5 MHz. To meet these new operational requirements, the new LLRF system has been proposed. Very specific requirements (dual frequency operation) on one side and the simple RF drive mode operation on the other imply the use of a commercial off-the-shelf digital platform rather than a system typical for RF cavity field control. We have chosen the Texas Instruments FPGA board along with a high-speed 8-Channel, 14-Bit board, and a 4-Channel, 16-Bit board. The DAC board includes the clock generator for clocking ADCs, DACs and the FPGA. The only custom design section of the system is the RF Front End board. The complete Gun Laser LLRF system has been designed, built, and recently commissioned in the CEBAF Injector. This paper will detail the design and report on commissioning activities.

Plawski, Tomasz↗

Instrumentation and Control Selection for the 12 GeV Hall-B Magnets at Jefferson Lab

Here, as part of the Jefferson Lab 12 GeV accelerator upgrade, the Experimental Physics Hall B detector system requires two superconducting magnets – a Torus and a Solenoid. The specifications required maximum space for the detectors which led to the choice of conduction cooling for each magnet. The Torus consists of 6 trapezoidal 'race-track'-type coils connected in series with an operating current of 3770 A. The Solenoid is an actively shielded 5 Tesla magnet consisting of 5 coils connected in series operating at 2416 A. Within the hall the two magnets are located in close proximity to each other and are surrounded by particle detectors. We describe the philosophy behind the instrumentation selection and control design that accounts for this proximity and other challenging working conditions. We describe the choice of sensor technologies, as well as the control and data acquisition methods. The magnet power and cryogenic control sub-systems are implemented using Allen Bradley Control Logix 1756-L72 Programmable Logic Controllers. Sensor instrumentation read-backs are routed into the PLC via National Instruments cRIO hardware (Field Programmable Gate Arrays or FPGA/RT application) using Jefferson Lab designed FPGA-based multi-sensor-excitation-chassis. Configuration, monitoring, and alarm handlers for the magnet systems are provided via an Experimental Physics Instrumentation & Control System interface (EPICS). Failure Modes and Effects Analysis (FMEA) and the requirement to monitor critical parameters during operation guided the selection of instrumentation and associated hardware. The design of the quench protection and voltage tap sub-systems was driven by the anticipated level of voltages developed during a magnet quench. The primary hard-wired quench detection and protection sub-system together with the secondary PLC-based protection sub-system is also discussed. The successful commissioning and subsequent performance of these magnets demonstrates the robustness of the design and implementation approach that was adopted by the Jefferson Lab team and serves as an excellent 'How To' guide for future projects of this size and complexity.

12 GeV↗

Design and Implementation of the LLRF System for LCLS-II

The SLAC National Accelerator Laboratory is building LCLS-II, a new 4 GeV CW superconducting (SCRF) linac as a major upgrade of the existing LCLS. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded QL of ~ 4 x 10⁷. Each individual RF cavity will be powered by one 3.8 kW solid state amplifier. To ensure optimum field stability a single source single cavity control system has been chosen. It consists of a precision four channel cavity receiver and two RF stations (Forward, Reflected and Drive signals) each controlling two cavities. In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) was modeled and cavity microphonic testing has started. This paper will describe the main system elements as well as test results on LCLS-II cryomodules.

Serrano, Carlos↗

Superconducting Magnet Power Supply and Hard-Wired Quench Protection at Jefferson Lab for 12 GeV Upgrade

The superconducting magnet system in Hall B being designed and built as part of the Jefferson Lab 12 GeV upgrade requires powering two conduction cooled superconducting magnets - a torus and a solenoid. The torus magnet is designed to operate at 3770 A and solenoid at 2416 A. Failure Modes and Effects Analysis (FMEA) determined that voltage level thresholds and dump switch operation for magnet protection should be tested and analyzed before incorporation into the system. The designs of the quench protection and voltage tap sub-systems were driven by the requirement to use a primary hard-wired quench detection sub-system together with a secondary PLC-based protection. Parallel path voltage taps feed both the primary and secondary quench protection sub-systems. The PLC based secondary protection is deployed as a backup for the hard-wired quench detection sub-system and also acts directly on the dump switch. Here, we describe a series of tests and modifications carried out on the magnet power supply and quench protection system to ensure that the superconducting magnet is protected for all fault scenarios.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been deliver-ing 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher QL (~ 3×107) op-erations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper re-ports on the C100 operation and optimization improve-ments of the RF system and cryomodules.

Hovater, James↗

Resonance Control System for the CEBAF Separator Upgrade

Abstract The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. The RF system employs two digital LLRF systems controlling four normal conducting cavities in a vector sum setting. Cavity tune information of the individual cavities is obtained using a multiplexing scheme of the forward and reflected RF signals. Water skids equipped with heaters and valves are used to control resonance. A new FPGA-based hardware and EPICS-based predictive control algorithm has been developed to support reliable operation of the beam extraction process. This paper presents the architecture design of the existing hardware and software as well as a plan to develop a model predictive control system.

Plawski, Tomasz↗

LLRF Control of High Loaded-Q Cavities for the LCLS-II

The SLAC National Accelerator Laboratory is planning an upgrade (LCLS-II) to the Linear Coherent Light Source with a 4 GeV CW Superconducting Radio Frequency (SCRF) linac. The nature of the machine places stringent requirements in the Low-Level RF (LLRF) system, expected to control the cavity fields within 0.01 degrees in phase and 0.01% in amplitude, which is equivalent to a longitudinal motion of the cavity structure in the nanometer range. This stability has been achieved in the past but never for hundreds of superconducting cavities in Continuous-Wave (CW) operation. The difficulty resides in providing the ability to reject disturbances from the cryomodule, which is incompletely known as it depends on the cryomodule structure itself (currently under development at JLab and Fermilab) and the harsh accelerator environment. Previous experience in the field and an extrapolation to the cavity design parameters (relatively high Q_{L}c≈ 4×10⁷ , implying a half-bandwidth of around 16 Hz) suggest the use of strong RF feedback to reject the projected noise disturbances, which in turn demands careful engineering of the entire system.

43 PARTICLE ACCELERATORS↗

CEBAF SRF Performance during Initial 12 GeV Commissioning

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

43 PARTICLE ACCELERATORS↗

The LCLS-II LLRF System

The SLAC National Accelerator Laboratory is planning an upgrade (LCLS-II) to the Linear Coherent Light Source with a 4 GeV CW superconducting (SCRF) linac. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded Q L of ~ 4x10 7 . The RF system will have 3.8 kW solid state amplifiers driving single cavities. To ensure optimum field stability a single-source single-cavity control system has been chosen. It consists of a precision four-channel cavity receiver and RF stations (Forward, Reflected and Drive signals). In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) is being modeled and cavity microphonic testing has started. This paper describes the LLRF system under consideration, including recent modeling and cavity tests.

43 PARTICLE ACCELERATORS↗

Liquid nitrogen tests of a Torus coil for the Jefferson Lab 12GeV accelerator upgrade

A magnet system consisting of six superconducting trapezoidal racetrack-type coils is being built for the Jefferson Lab 12-GeV accelerator upgrade project. The magnet coils are wound with Superconducting Super Collider-36 NbTi strand Rutherford cable soldered into a copper channel. Each superconducting toroidal coil is force cooled by liquid helium, which circulates in a tube that is in good thermal contact with the inside of the coil. Thin copper sheets are soldered to the helium cooling tube and enclose the superconducting coil, providing cooling to the rest of the coil pack. As part of a rigorous risk mitigation exercise, each of the six coils is cooled with liquid nitrogen (LN2) to 80 K to validate predicted thermal stresses, verify the robustness and integrity of electrical insulation, and evaluate the efficacy of the employed conduction cooling method. This paper describes the test setup, the tests performed, and the findings.

Torus, SSC-NbTi, LN2 cold test, FEA, epoxy potting↗

Operational experience with CW high gradient and high QL cryomodules

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules (80 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a QL of 3×107. The RF system employs single cavity control using new digital LLRF controls and 13 kW klystrons. Recently, all of the new cryomodules and associated RF hardware and software have been commissioned and operated in the CEBAF accelerator. Electrons at linac currents up to 10 ?A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the cryomodules and RF system.

Hovater, J. Curt↗

LLRF System for the CEBAF Separator Upgrade

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

Plawski, Tomasz E.↗

Wisconsin SRF Electron Gun Commissioning

The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

43 PARTICLE ACCELERATORS↗

LLRF Commissioning of the new CEBAF 100 MeV Cryomodule

Commissioning of the 100 MeV cryomodule (CEBAF acronym C100) is part of the CEBAF energy upgrade to 12 GeV at Jefferson Lab. LLRF commissioning includes field control, cavity interlocks, resonance controls (Stepper Motor and Piezo tuner) and operational software. All the above mentioned systems and software are calibrated and tested on the bench and in test platforms prior to installation. Once installed and connected to the cryomodule, the system supports cavity commissioning (Emax, Qo etc.). In addition the LLRF system is calibrated (gradient and RF power), optimized (system gains and set points) and functionality is tested for operability. This poster describes the detailed description of various stages of commissioning of first 100 MeV cryomodule.

Bachimanchi, Ramakrishna↗

Status of the CEBAF Energy Upgrade RF Control System

To support the CEBAF energy upgrade from 6 GeV to 12 GeV, the RF control system is being modernized to control the high gradient high QL superconducting cavities. 80 new LLRF systems are being built to support the upgrade. The new system incorporates a heterodyne transceiver along with I&Q sampling to measure and control magnitude and phase. A low-cost Altera FPGA is used to digitally implement the cavity control algorithms. One of the features of the system is a digital self excited loop to track the cavity over large Lorentz detuning (800 Hz) during turn on. The system has successfully completed preliminary development and is now moving into the production stage of the project. This paper discusses the design, modeling, testing and production of the new RF control system and associated peripheral systems (cavity interlocks, and resonance control).

Hovater, James↗