Search NASA⌕ Search

Engineering topics

Lahti, George

Publications and source records attributed to Lahti, George.

OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been deliver-ing 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher QL (~ 3×107) op-erations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper re-ports on the C100 operation and optimization improve-ments of the RF system and cryomodules.

Hovater, James↗

Resonance Control System for the CEBAF Separator Upgrade

Abstract The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. The RF system employs two digital LLRF systems controlling four normal conducting cavities in a vector sum setting. Cavity tune information of the individual cavities is obtained using a multiplexing scheme of the forward and reflected RF signals. Water skids equipped with heaters and valves are used to control resonance. A new FPGA-based hardware and EPICS-based predictive control algorithm has been developed to support reliable operation of the beam extraction process. This paper presents the architecture design of the existing hardware and software as well as a plan to develop a model predictive control system.

Plawski, Tomasz↗

CEBAF SRF Performance during Initial 12 GeV Commissioning

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

43 PARTICLE ACCELERATORS↗

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

43 PARTICLE ACCELERATORS↗

LLRF Commissioning of the new CEBAF 100 MeV Cryomodule

Commissioning of the 100 MeV cryomodule (CEBAF acronym C100) is part of the CEBAF energy upgrade to 12 GeV at Jefferson Lab. LLRF commissioning includes field control, cavity interlocks, resonance controls (Stepper Motor and Piezo tuner) and operational software. All the above mentioned systems and software are calibrated and tested on the bench and in test platforms prior to installation. Once installed and connected to the cryomodule, the system supports cavity commissioning (Emax, Qo etc.). In addition the LLRF system is calibrated (gradient and RF power), optimized (system gains and set points) and functionality is tested for operability. This poster describes the detailed description of various stages of commissioning of first 100 MeV cryomodule.

Bachimanchi, Ramakrishna↗

Status of the CEBAF Energy Upgrade RF Control System

To support the CEBAF energy upgrade from 6 GeV to 12 GeV, the RF control system is being modernized to control the high gradient high QL superconducting cavities. 80 new LLRF systems are being built to support the upgrade. The new system incorporates a heterodyne transceiver along with I&Q sampling to measure and control magnitude and phase. A low-cost Altera FPGA is used to digitally implement the cavity control algorithms. One of the features of the system is a digital self excited loop to track the cavity over large Lorentz detuning (800 Hz) during turn on. The system has successfully completed preliminary development and is now moving into the production stage of the project. This paper discusses the design, modeling, testing and production of the new RF control system and associated peripheral systems (cavity interlocks, and resonance control).

Hovater, James↗