Search NASA⌕ Search

Engineering topics

Ambrosio, G.

Publications and source records attributed to Ambrosio, G..

At least 19 records

Future Circular Collider Feasibility Study Report

In response to the 2020 Update of the European Strategy for Particle Physics , the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme , which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory; followed by a proton-proton collider (FCC-hh) at the energy frontier in the second phase. The FCC-ee is designed to operate at four key centre-of-mass energies: the Z pole, the WW pair production threshold, the ZH production peak, and the top/anti-top production threshold—each delivering the highest possible luminosities to four experiments. Over 15 years of operation, FCC-ee will produce more than 6 trillion Z bosons, 200 million WW pairs, nearly 3 million Higgs bosons, and 2 million top anti-top pairs. Precise energy calibration at the Z pole and WW threshold will be achieved through frequent resonant depolarisation of pilot bunches. The sequence of operation modes between the Z, WW, and ZH substages remains flexible. The FCC-hh will operate at a centre-of-mass energy of approximately 85 TeV—nearly an order of magnitude higher than the LHC—and is designed to deliver 5 to 10 times the integrated luminosity of the upcoming High-Luminosity LHC. Its mass reach for direct discovery extends to several tens of TeV. In addition to proton-proton collisions, the FCC-hh is capable of supporting ion-ion, ion-proton, and lepton-hadron collision modes. This second volume of the Feasibility Study Report presents the complete design of the FCC-ee collider, its operation and staging strategy, the full-energy booster and injector complex, required accelerator technologies, safety concepts, and technical infrastructure. It also includes the design of the FCC-hh hadron collider, development of high-field magnets, hadron injector options, and key technical systems for FCC-hh.

Benedikt, M. [European Organization for Nuclear Re↗

Future Circular Collider Feasibility Study Report

Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region. The report describes the development of the project scenario based on the ‘avoid-reduce-compensate’ iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain—including numerous urban, economic, social, and technical aspects—confirmed the project’s technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a summary of the studies conducted to document the current state of the environment.

Benedikt, M. [European Organization for Nuclear Re↗

First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗

Future high energy colliders and options for the U.S.

The United States has a rich history in high energy particle accelerators and colliders — both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is to prepare to host an energy frontier collider in the U.S. once the construction of the LBNF/DUNE project is completed. In this paper, we briefly discuss the ongoing and potential U.S. engagement in proposed collider projects abroad and present a number of future collider options we have studied for hosting an energy frontier collider in the U.S. Further, we also call for initiating an integrated national R&D program in the U.S. now, focused on future colliders.

43 PARTICLE ACCELERATORS↗

Effect of CLIQ on Training of HL-LHC Quadrupole Magnets

The high-luminosity LHC upgrade requires stronger than LHC low-beta quadrupole magnets to reach the luminosity goals of the project. The project is well advanced and HL-LHC quadrupole magnets are currently being commissioned in US Labs (MQXFA magnets) and CERN (MQXFB magnets). Those are the first Nb 3 Sn magnets to be used in any large particle accelerator. At development stages, many Nb 3 Sn accelerator sub-scale models showed relatively slow training and MQXFA magnets were projected to have low tens of quenches before reaching operational field. Recently it was shown that dedicated capacitor-based de-vices can affect Nb 3 Sn magnet training, and it was suggested that CLIQ, a capacitor-based device intended for quench protection, can do too. Here, the present paper investigates effects on training likely induced by CLIQ, using the base fact that only half the coils in a quadrupole experience upward current modulation at quench because of capacitor discharge. The study encompasses all MQXFA production magnets trained at BNL to date. No other high-statistics data from identical magnets (series) with CLIQ protection exist so far. Implications and opportunities stemming from data analysis are discussed and conclusions drawn.

43 PARTICLE ACCELERATORS↗

Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab

MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the U.S. Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. Here this paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Effect of CLIQ on training of HL-LHC quadrupole magnets

The high-luminosity LHC upgrade requires stronger than LHC low-beta magnets to reach the luminosity goals of the project. The project is well advanced and HL-LHC quadrupole magnets are currently being commissioned in US Labs (MQXFA magnets) and CERN (MQXFB magnets). Those are the first Nb3Sn magnets to be used in any large particle accelerator. At development stages, many Nb3Sn accelerator sub-scale models showed relatively slow training and MQXFA magnets were projected to have low tens of quenches before reaching operational field. Recently it was shown that dedicated capacitor-based devices can affect Nb3Sn magnet training, and it was suggested that CLIQ, a capacitor-based device intended for quench protection, can do too. The present paper investigates effects on training induced by CLIQ, using the base fact that only half the coils in a quadrupole experience upward current modulation because of the capacitor discharge. The study encompasses all MQXFA production magnets trained at BNL to date. No other high-statistics data from identical magnets (series) with CLIQ protection exists so far. Implications and opportunities stemming from data analysis are discussed and conclusions drawn.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Optimizing the use of pressurized bladders for the assembly of HL-LHC MQXFB magnets

The use of pressurized bladders for stress control of superconducting magnets was firstly proposed at Lawrence Berkeley National Laboratory in the early 2000s. Since then, the so-called ‘bladders and keys’ procedure has become one of the reference techniques for the assembly of high-field accelerator magnets and demonstrators. Exploiting the advantages of this method is today of critical importance for Nb$_{3}$Sn-based accelerator magnets, whose production requires the preservation of tight stress targets in the superconducting coils to limit the effects of the strain sensitivity and brittleness of the conductor. The present manuscript reports on the results of an experimental campaign focused on the optimization of the ‘bladders and keys’ assembly process in the MQXFB quadrupoles. These 7.2 m long magnets shall be among the first Nb$_{3}$Sn cryomagnets to be installed in a particle accelerator as a part of the High Luminosity upgrade of the LHC. One of the main practical implications of the bladders technique, especially important when applied to long magnets like MQXFB, is that to insert the loading keys, the opening of a certain clearance in the support structure is required. The procedure used so far for MQXF magnets involved an overstress in the coils during bladder inflation. The work presented here shows that such an overshoot can be eliminated thanks to additional bladders properly positioned in the structure. This optimized method was validated in a short model magnet and in a full-length mechanical model, becoming the new baseline for the series production at CERN. Furthermore, the results are supported by numerical predictions using finite element models.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Analysis of the Mechanical Performance of the 4.2-m-Long MQXFA Magnets for the Hi-Lumi LHC Upgrade

Under the U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), the 150 mm bore, high-field Nb 3 Sn low-{eta}_MQXFA quadrupole magnets are being fabricated, assembled and tested, in the context of the CERN Hi-Luminosity LHC (HL-LHC) upgrade. These magnets have 4.2 m magnetic length and 4.56 m long iron yoke. To date, eight MQXFA magnets have been tested. One of the magnets additionally underwent a successful endurance test with 40 triggered quenches, and two magnets did not perform as expected. This work summarizes for the first time the available strain gauge data from eight identical Nb 3 Sn MQXFA tested magnets, focusing on the endurance test, and on a possible cause of underperformance of the two magnets that did not pass the vertical test. Here we applied methods to prevent this from happening in future MQXFA magnets, which shown to be effective for last two tested magnets.

43 PARTICLE ACCELERATORS↗

The Challenges and Solutions of Meeting the Assembly Specifications for the 4.5 m Long MQXFA Magnets for the Hi-Luminosity LHC

The U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) has, in the recent years, developed assembly specifications for the 4.5 m long MQXFA magnets, which are 150 mm aperture high-field Nb 3 Sn low-β quadrupole magnets that are being built for the CERN Hi-Luminosity LHC (HL-LHC) upgrade. While the specifications were based on lessons learned from the LHC Accelerator Research Program (LARP) effort and the MQXFS and MQXFA prototype magnets, the experience gained from having both MQXFA07 and MQXFA08 magnets not meeting performance specifications during cold testing actually catalyzed a better understanding of the impact of the target assembly specifications and a subsequent refinement of the same. This paper summarizes a body of assembly data from the Pre-Series (MQXFA03-MQXFA07) and Series magnets (MQXFA08-MQXFA11) that have been built to date, and discusses the processes employed to successfully face the challenge of ensuring that the assembly specifications are met for the duration of the project.

43 PARTICLE ACCELERATORS↗

A Novel Design for Improving the Control on the Stainless-Steel Vessel Welding Process for Superconducting Magnets

Stainless steel vessels see widespread use in superconducting magnets for particle accelerator applications. Their function varies in different magnet designs: they always provide the necessary liquid helium containment, but in some cases are also used to provide azimuthal prestress and can also be welded to the magnet end plate to provide additional longitudinal stiffness. A magnet designed with the bladder and key technology does not rely on the structural role of the vessel. They are structurally supported using azimuthally prestressed aluminum shells, and the longitudinal constraint by rods. In this case, the magnet designer would generally like to minimize the interaction between the magnet and the stainless-steel vessel and to minimize the coil stress variation due to the vessel. The stress state in the vessel and in the coil is a function of the circumferential interference, defined as the vessel azimuthal length minus the magnet circumference. The vessel and the magnet azimuthal length machining tolerances are relatively large resulting in significant stress variations in the superconducting coils. Here in this paper we introduce an interference-control shim, which can significantly limit the stress variation of the coils for a given variation of the interference. The effectiveness of the interference-control shim is evaluated numerically on the MQXF, the low-β quadrupole for the High Luminosity LHC.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Status and Challenges of the Interaction Region Magnets for HL-LHC

About one hundred magnets of six different types shall be installed in the High Luminosity LHC (HL-LHC) in the years 2026-2028 at CERN. The magnets design, construction and test are based on CERN collaborations with institutes and industrial partners in USA, Spain, Italy, Japan and China. Three types of correctors are based on Nb-Ti technology and feature conductor peak fields in the 2 to 4 T range: for all of them the prototype phase has been successfully completed. The production is well advanced for the superferric correctors, and is starting for the canted cosine theta correctors and for the nested correctors. The separation and recombination Nb-Ti dipoles D1 and D2, with a 4.5-6 T bore field range, are both in the prototype phase after the completion of the short model program. The most challenging magnet, the Nb 3 Sn quadrupole with conductor peak field above 11 T, is in the prototype phase at CERN and halfway through the production phase in the USA. In this paper we will give, for each type of magnet, an overview of the main achievements obtained so far and we will outline the technical points still needing validation from the prototype program.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Challenges and Lessons Learned from fabrication, testing and analysis of eight MQXFA Low Beta Quadrupole magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some criteria and were disassembled. Lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this paper, we present a summary of: 1) the fabrication and test data of all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

43 PARTICLE ACCELERATORS↗

A Novel Design for Improving the Control on the Stainless-Steel Vessel Welding Process for Superconducting Magnets

Stainless steel vessels see widespread use in superconducting magnets for particle accelerator applications. Their function varies in different magnet designs: they always provide the necessary liquid helium containment, but in some cases are also used to provide azimuthal prestress and can also be welded to the magnet end plate to provide additional longitudinal stiffness. A magnet designed with the bladder and key technology does not rely on the structural role of the vessel. They are structurally supported using azimuthally prestressed aluminum shells, and the longitudinal constraint by rods. In this case, the magnet designer would generally like to minimize the interaction between the magnet and the stainless-steel vessel and to minimize the coil stress variation due to the vessel. The stress state in the vessel and in the coil is a function of the circumferential interference, defined as the vessel azimuthal length minus the magnet circumference. The vessel and the magnet azimuthal length machining tolerances are relatively large resulting in significant stress variations in the superconducting coils. In this paper we introduce an interference control shim, which can significantly limit the stress variation of the coils for a given variation of the interference. The effectiveness of the interference-control shim is evaluated numerically on the MQXF, the low-β quadrupole for the High Luminosity LHC.

43 PARTICLE ACCELERATORS↗