Search NASA⌕ Search

Engineering topics

Annala, G. [Fermilab]

Publications and source records attributed to Annala, G. [Fermilab].

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab] (ORCID:0000000235719205)↗

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab]↗

Status of the Slow Extraction Commissioning for the Mu2e Experiment at Fermilab

We present the current status of slow-extraction commissioning for the Mu2e experiment at Fermilab. The system employs third-integer resonant extraction of 8 GeV protons from the Delivery Ring to deliver a uniform, slow-spilled beam to the production target. During recent commissioning periods, we achieved stable optics, reproducible injection and energy matching, and consistent multi-spill operation. The sextupole circuits and fast-ramping quadrupoles were exercised near nominal resonance conditions, yielding promising extraction performance. A prototype spill-regulation system based on the ARIA-10 SoC was commissioned with integrated diagnostics, demonstrating closed-loop operation and establishing the framework for PID- and RFKO-based control. These commissioning results lay the foundation for achieving precision-regulated, high-quality slow extraction in upcoming Mu2e operations.

Narayanan, A. [Fermilab]↗

Challenges and Optimization of Mu2e Proton Target Design with Radiative Cooling

Mu2e, the Muon-to-Electron Conversion Experiment, aims to identify physics beyond the Standard Model, namely, the conversion of muons to electrons without the emission of neutrinos. The muons are produced from pions generated in a production target when it is hit by an 8 GeV proton beam from the Fermilab Booster/Main Injector. The proton target design space is strongly constrained by a one-year operating lifetime and the need for radiative cooling in a vacuum environment. Uncertainties in the lifetime of the existing baseline design – a monolithic, segmented tungsten target – are large, particularly due to unknown impacts of radiation damage at the very high proton fluences expected in the experiment. We have begun evaluation of a new design utilizing Inconel 718 over the WL10 used in the existing target design. As a result, the structural design of the target has evolved significantly. This evolution focuses on lowering the target temperature, minimizing obstruction to muons, increasing structural stability, maximizing fatigue lifetime, simplifying the fabrication process, and more. The thermal management, structural stability and fatigue lifetime are emphasized here. These optimizations have led to a promising new target design for the Mu2e experiment.

Liu, Z. [Fermilab]↗