Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Abstract

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Nagaslaev, V. [Fermilab], Annala, G. [Fermilab], Berlioz, J. [Fermilab], Deinlein, G. [Fermilab], Drendel, B. [Fermilab], Morgan, J. [Fermilab], Narayanan, A. [Fermilab], StJohn, J. [Fermilab], Still, D. [Fermilab], VanderMeulen, D. [Fermilab]. 2026-06-23. Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab. https://doi.org/10.18429/jacow-ipac2026-thp4310

Cite the original work for its findings. Save a collection to share your selection of sources.