Search NASA⌕ Search

Engineering topics

Still, D. [Fermilab]

Publications and source records attributed to Still, D. [Fermilab].

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab] (ORCID:0000000235719205)↗

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab]↗

Status of the Slow Extraction Commissioning for the Mu2e Experiment at Fermilab

We present the current status of slow-extraction commissioning for the Mu2e experiment at Fermilab. The system employs third-integer resonant extraction of 8 GeV protons from the Delivery Ring to deliver a uniform, slow-spilled beam to the production target. During recent commissioning periods, we achieved stable optics, reproducible injection and energy matching, and consistent multi-spill operation. The sextupole circuits and fast-ramping quadrupoles were exercised near nominal resonance conditions, yielding promising extraction performance. A prototype spill-regulation system based on the ARIA-10 SoC was commissioned with integrated diagnostics, demonstrating closed-loop operation and establishing the framework for PID- and RFKO-based control. These commissioning results lay the foundation for achieving precision-regulated, high-quality slow extraction in upcoming Mu2e operations.

Narayanan, A. [Fermilab]↗