Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Improved Decarbonization Planning through Climate Resiliency Modeling

California has set ambitious decarbonization goals concerning both emissions and the portion of energy generated by renewable resources. However, climate change poses considerable uncertainties. Variation in load is driven both by the level of electrification as well as the impact of climate change on weather. Further, climate change stands to make weather more variable, impacting not just load but generation from renewable resources. In this paper, we approach the issue of the impacts of climate change on decarbonization planning from two perspectives. First, we look at the range of decarbonization pathways through 8 pathways that account for differences in socioeconomic development, global emissions, and warming. Second, we develop a more robust way of ensuring the reliability of energy resources planning than the commonly used planning reserve margin. We show that the proposed method can save between 6 and 14 billion dollars in investment and maintenance costs and outline critical policy implications concerning the reliance of power plants for satisfying planning reliability requirements, including the potential retirement of dozens of peaker power plants.

Anderson, Osten P.↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗