DOE OSTI · 2338087

Cooperative Transmission Expansion Planning Experiment Data and Results

Abstract

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Akdemir, Kerem Ziya, Mongird, Kendall, Kern, Jordan, Oikonomou, Konstantinos, Voisin, Nathalie, Burleyson, Casey, Rice, Jennie, Zhao, Mengqi, Bracken, Cameron, Vernon, Chris. 2024-07-02. Cooperative Transmission Expansion Planning Experiment Data and Results. https://doi.org/10.57931/2338087

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗