Search NASA⌕ Search

Engineering topics

Rice, Jennie

Publications and source records attributed to Rice, Jennie.

GRIDCERF - Geospatial Raster Input Data for Capacity Expansion Regional Feasibility

The Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package is a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers hundreds of individual suitability layers for use with both renewable and non-renewable power plant technology configurations in a harmonized format that can be easily ingested by geospatially-enabled modeling software. It also provides pre-compiled technology-specific suitability layers and allows for user customization to robustly address science objectives when evaluating varying future conditions. GRIDCERF data can be directly used with the CERF (Capacity Expansion Regional Feasibility) model to site power plants at a 1km resolution. GRIDCERF includes composite technology siting suitability raster layers for the following utility scale technology configurations. Note that, in addition to technology sub-types shown below, various cooling types are also included (recirculating, pond, once-through, recirculating-seawater, dry-hybrid, or dry) for various technologies. Biomass Conventional (with or without CCS) IGCC (with or without CCS) Coal Conventional (with or without CCS) IGCC (with or without CCS) Natural Gas Combined-cycle (CC) (with or without CCS) Turbine Geothermal Enhanced Geothermal Systems (EGS) - Class 1 through Class 5 resource potential Nuclear Gen 2 Light Water Reactor (LWR) Gen 3 Small Modular Reactor (SMR) Gen 3 AP1000 Refined Liquids Combined-cycle (CC) (with or without CCS) Turbine Solar Photovoltaic (PV) - for capacity factors in the range of 6-18% Utility-scale Concentrating Solar Power (CSP) - for capacity factors in the range of 24-46% Tower Wind (Onshore) - for capacity factors in the range of 5-50% 80m hub height 100m hub height 120m hub height 140m hub height Wind (Offshore) - for capacity factors in the range of 25-60% 100m hub height 140m hub height 160m hub height

capacity expansion↗

Heat Wave Impacts on Western US Electricity System

Visualization of hourly generation, load, unserved load, and locational marginal energy prices in the western United States during a July 22-28 heatwave event in 2018 and 2058. In addition to hourly time series data of each of the parameters, choropleth maps showing the hourly value for each balancing authority are provided as well as a county-level choropleth map of temperature.

Mongird, Kendall↗

Energy and AI: Evaluating Future Grid and Water Stress Due to Data Centers

Projections of the need for new data centers to support Artificial Intelligence (AI) are large but highly uncertain. Recent projections indicate up to a 15% annual growth rate in data center electricity demand within the next 5-10 years. Given that most electric utilities are required to have a reserve margin of roughly the same magnitude as the projected growth in demand, these new data center loads could soon threaten resource adequacy and reliability unless data centers build their own generation, interruptible loads are negotiated, commensurate new capacity and/or transmission is built, or some combination of these options. Similarly, depending on the cooling technology and geographic location of new data centers, they could threaten water adequacy in water scarce regions. This presentation highlights the grid and water implications of new data centers to support AI.

Mongird, Kendall (ORCID:0000000328077088)↗

High Resolution Siting Suitability of Various Power Plant Technologies

Energy sector planning models determine the aggregate need for new generation, but these models are typically at the state or regional scale and are not equipped to address the wide range of location- and technology-specific issues that are increasingly a factor in power plant siting. These animations demonstrate the aggregate siting suitability of various power plant technology configurations, considering technology-specific factors that can prohibit development. The data presented is from the GRIDCERF (Geospatial Raster Input Data for Capacity Expansion Regional Feasibility) data package. GRIDCERF is a harmonized, open-source geospatial product that can be used to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. The animations presented here demonstrate a curated selection of the full suite of technology configurations available. GRIDCERF provides the necessary inputs for models that simulate power plant siting for regional capacity expansion planning such as the Capacity Expansion Regional Feasibility (CERF) model.

Mongird, Kendall [Pacific Northwest National Labor↗

The Capacity Expansion Regional Feasibility (CERF) Model: High-Resolution Power Plant Siting

Abstract This presentation gives an overview of the geospatial power plant siting model CERF. CERF (Capacity Expansion Regional Feasibility) is an open source Python package developed under the Integrated Multisector Multiscale Modeling (IM3) Project at PNNL. This presentation covers an overview of how the CERF model works, walks through various power plant siting analyses, and discusses future research opportunities for the model. The CERF model can be accessed at https://github.com/IMMM-SFA/cerf. PNNL Information Release Number: PNNL-SA-207336 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

Mongird, Kendall [Pacific Northwest National Labor↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Hourly Electricity Demand Projections for Eight Combined Climate and Socioeconomic Scenarios

This dataset contains 40 years (1980-2019) of simulated historical hourly electricity demand (i.e., loads) and 80 years (2020-2099) of projected hourly loads for 54 Balancing Authorities (BAs) and 48 states plus the District of Columbia. Details about the scenarios and variables included in this dataset are in the readme.pdf file. The two primary models that created the dataset are a version of the Global Change Analysis Model with detailed sectoral resolution over the United States (GCAM-USA) and the Total ELectricity Loads (TELL) model. Links to the model source code and workflow for deriving the dataset are provided in an accompanying meta-repository: https://github.com/IMMM-SFA/burleyson-etal_2024_applied_energy. Projections are for four future climate scenarios that represent combinations of Representative Concentration Pathways (RCPs) 4.5 and 8.5 combined with two levels of climate model sensitivities: rcp45cooler, rcp45hotter, rcp85cooler, and rcp85hotter. The four climate scenarios are crossed with Shared Socioeconomic Pathways (SSPs) 3 and 5 to yield eight different future load projections: rcp45cooler_ssp3, rcp45cooler_ssp5, rcp45hotter_ssp3, rcp45hotter_ssp5, rcp85cooler_ssp3, rcp85cooler_ssp5, rcp85hotter_ssp3, and rcp85hotter_ssp5. The climate scenarios are from the IM3 Thermodynamic Global Warming (TGW) dataset which is linked below in the related metadata. The related metadata also contains links to a repository containing the raw GCAM-USA output files.

Climate Change↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗