Publications and source records attributed to Capista, David.

Residual Dose and Environmental Monitoring for the Fermilab Main Injector Tunnel Using the Data Acquisition Logging Engine (Dale)

The Recycler and the Main Injector are part of the Fermilab Accelerator complex used to deliver proton beam to the different experiments. It is very important to control and minimize losses in both machines during operation, to reduce personnel dose from residual activation and to preserve component lifetime. To minimize losses, we need to identify the loss points and adjust the components accordingly. The Data Acquisition Loss Engine (DALE) platform has been developed within the Main Injector department and upgraded throughout the years. DALE is used to survey the entire enclosure for residual dose rates and environmental readings when unrestricted access to the enclosure is possible. Currently DALE has two radiation meters, which are aligned along each machine, so loss points can be identified for both at the same time. DALE attaches to the enclosure carts and is continuously in motion monitoring dose rates and other environmental readings. In this paper we will describe how DALE is used to provide radiation maps of the residual dose rates in the enclosure. We will also compare the loss points with the Beam Loss monitor data.

43 PARTICLE ACCELERATORS↗

Second Generation Fermilab Main Injector 8 GeV Beamline Collimation Preliminary Design

The current Fermilab Main Injector 8 GeV beamline transverse collimation system was installed in 2006. Since then, proton beam intensities and rates have increased significantly. With the promise of even greater beam intensities and a faster repetition rate when the PIP-II upgrade completes later this decade, the current collimation system will be insufficient. Over the past 18 months, multiple collimation designs have been investigated, some more traditional and others novel. A preliminary design review was conducted and a design chosen. Work is underway to finalize the chosen design, prototype some of its novel components and procure parts for installation Summer 2023.

43 PARTICLE ACCELERATORS↗

Improvements to the Recycler/Main Injector to Deliver 850 kW+

The Main Injector is used to deliver a 120 GeV high power proton beam for Neutrino experiments. The design power of 700 kW was reached in early 2017 but further improvements have seen a new sustained peak power of 893 kW. Two of the main improvements include the shortening of the Main Injector ramp length as well optimizing the slip-stacking procedure performed in the Recycler to reduce the amount of uncaptured beam making its way into the Main Injector. These improvements will be discussed in this paper as well future upgrades to reach higher beam powers.

43 PARTICLE ACCELERATORS↗

Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler

The Fermilab Main Injector system delivers 700 kW of 120 GeV Proton beam for neutrino experiments. Since 2013 this has been achieved using slip stacking accumulation in the Recycler with up to 12 batches from the Fermilab Booster per Main Injector Ramp Cycle. To control activation from beam loss, collimation systems in the Booster to Recycler transfer line, in the Recycler and in the Main Injector are employed. Residual radiation measurements around the ring with detailed studies at the collimators are required to maintain adequate loss control. We will review design considerations, operational parameters and activation results for more than ten years of operation. Simulations with MARS15 are used to explore the activation rates and the isotopic composition of the resulting activation.

43 PARTICLE ACCELERATORS↗