Second Generation Fermilab Main Injector 8 GeV Beamline Collimation Preliminary Design
Abstract
The current Fermilab Main Injector 8 GeV beamline transverse collimation system was installed in 2006. Since then, proton beam intensities and rates have increased significantly. With the promise of even greater beam intensities and a faster repetition rate when the PIP-II upgrade completes later this decade, the current collimation system will be insufficient. Over the past 18 months, multiple collimation designs have been investigated, some more traditional and others novel. A preliminary design review was conducted and a design chosen. Work is underway to finalize the chosen design, prototype some of its novel components and procure parts for installation Summer 2023.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Hazelwood, Kyle, Adamson, Philip, Brown, Bruce, Capista, David, Donahue, Robert, Klein, Beth, Mokhov, Nikolai, Pronskikh, Vitaly, Sidorov, Vladimir, Vincent, Michael. 2022-10-20. Second Generation Fermilab Main Injector 8 GeV Beamline Collimation Preliminary Design. https://doi.org/10.18429/jacow-napac2022-mopa29
Cite the original work for its findings. Save a collection to share your selection of sources.