Search NASA⌕ Search

Engineering topics

Sidorov, Vladimir

Publications and source records attributed to Sidorov, Vladimir.

LBNF Target Complex Remote Handling

The Long Baseline Neutrino Facility (LBNF) near site at the Fermilab campus in Illinois, USA includes a target complex which houses a 1.5 – 1.8m long graphite neutrino production target, a pre-target baffle, three neutrino focusing horns (A,B,C), and a decay pipe 200m in length leading to an energy absorber / beam dump housed in an adjacent absorber building. The prompt dose rates are such that the Target Hall must be unoccupied while beam is on target. During maintenance periods, the Target Hall can be occupied by trained personnel. However, residual dose rates of activated components necessitate certain operations, such as the annual replacement of the target, be executed remotely by personnel located in a shielded room within the Target Hall. This presentation covers details designed into the infrastructure, equipment, and procedures to allow for successful execution of remote handling operations.

43 PARTICLE ACCELERATORS↗

Second Generation Fermilab Main Injector 8 GeV Beamline Collimation Preliminary Design

The current Fermilab Main Injector 8 GeV beamline transverse collimation system was installed in 2006. Since then, proton beam intensities and rates have increased significantly. With the promise of even greater beam intensities and a faster repetition rate when the PIP-II upgrade completes later this decade, the current collimation system will be insufficient. Over the past 18 months, multiple collimation designs have been investigated, some more traditional and others novel. A preliminary design review was conducted and a design chosen. Work is underway to finalize the chosen design, prototype some of its novel components and procure parts for installation Summer 2023.

43 PARTICLE ACCELERATORS↗

BEAM COLLIMATION IN THE PIP-II LINAC TO BOOSTER TRANSFER LINE

The new PIP-II superconducting linac will deliver a 2 mA average H⁻ beam to the existing Booster synchrotron. The injected beam is accumulated by charge exchange over approximately 300 turns; phase space painting is used to mitigate space charge effects. To limit the power load on the internal waste beam absorber from the transverse tails of the H⁻ distribution missing the foil, the beam will be collimated in both planes in the linac to Booster transfer line using compact collimators of a novel design. Both the number of parasitic hits and the fraction of the beam missing the foil are sensitive functions of the H⁻ beam centroid position with respect to the edge of the foil. The positioning of the collimation is constrained by the availability of suitable space in the transfer line lattice, by specifics of the collimator design, by the phase space orientation at the collimator, and by the betatron phase advance to the foil needed to achieve proper orientation of the spatial distribution at the injection point. In this contribution, we describe the procedure by which collimator positions were optimized. We then discuss the expected performance of the overall system.

Johnson, David E.↗