Search NASA⌕ Search

Engineering topics

Colby, Jonathan

Publications and source records attributed to Colby, Jonathan.

Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors

This document will briefly discuss the observations and results from an NREL conducted accelerated lifetime testing of the main shaft seal for the Verdant Power fifth generation Gen5 underwater Tidal Energy Converter (TEC) turbine, which successfully performed at the RITE project in 2020-2021. In order to evaluate a 5-year Service Interval ( SI) for this component, testing at NREL operated the main shaft seal nearly continuously for over 135 (text says 130 days on page 5 and 125 days on page 7 and 137 days on page 11) days at a rotational velocity of 160 rpm while the test stand recorded water pressure, barrier fluid pressure, temperature, and number of cycles., representing ~ 40% of the SI. An additional separate test was conducted to measure the aging behavior of the rubber drive rings. The water pressure reservoir was held constant as 29 psi. Barrier fluid pressure remained relatively constant throughout the duration of the test but was seen to sink to as low as 10.1 psi. No barrier fluid leakage was observed throughout the test. A sudden failure occurred within the seal after the power to test machine was interrupted for a scheduled building maintenance procedure. Upon restarting, the main shaft seal lost all ability to prevent water ingress. The exact cause is not known but is believed to be either a seal assembly issue or a change in the alignment of the seal components during or following the power outage. Following seal disassembly, significant wear was seen on one of the graphite sealing rings. Based on these results it is recommended that a follow-on TEAMER be conducted to rectify protocol and assembly issues to further evaluate SI of this component. The support and participation of Verdant Power Inc, Dovetail Solutions LLC and Garlock Manufacturing Inc were instrumental in understanding the results. NREL thanks them for their significant effort.

13 HYDRO ENERGY↗

Report on the 4th Marine Energy Instrumentation and Data Workshop

The 4th Marine Energy Instrumentation and Data workshop was held on March 16 - 17 2022. This gathering brought together marine energy (ME) developers, researchers, and stakeholders to discuss the current state of ME technologies and the industry's instrument and data needs. The overall objective of the workshop was to identify gaps facing the ME industry for needed data collection, processing, and analysis. This report contains findings and recommendations derived from the discussions and presentations during the workshop.

16 TIDAL AND WAVE POWER↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements (i.e., high, medium, and low) performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area-use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

life cycle analysis↗

RITE Gen5 KHPS Levelized Cost of Energy

Levelized Cost of Energy analysis for Verdant Power Gen5 KHPS utilizing annualized AEP based on actual energy generation at the RITE Project during 2020-21. The WEC devices analyzed include attenuator, point absorber, oscillating wave surge converter, oscillating water column, overtopping/terminator device, submerged pressure differential, bulge wave, and rotating mass type wave energy converter devices. The CEC devices analyzed include horizontal axis turbine, vertical axis turbine, oscillating hydrofoil, enclosed tips (Venturi), Archimedes screw, and tidal kite type current energy converter devices.

16 TIDAL AND WAVE POWER↗

RITE Gen5 KHPS Performance - Period B

Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over 16 days in May 2021 during Period B operation. Along with performance data, the data includes setup data, project metadata, and characteristic data for RITE Gen5 KHPS (5m) turbine.

16 TIDAL AND WAVE POWER↗

RITE Gen5 KHPS Performance - Period A

Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over Period A which was a 39 day span ending on 11/12/2021. This data was collected under the European Marine Energy Centre (EMEC) power performance assessment. Along with performance data, the data includes setup data, project metadata, and characteristic data for RITE Gen5 KHPS (5m) turbine.

16 TIDAL AND WAVE POWER↗

TriFrame Mount Structural Performance - Period A

Long-Term TriFrame Monitoring System (LTTFMS) data collected during Period A (13 days - 10/22/20 - 11/4/20). The central component of the Verdant Power Free Flow System is a three-bladed horizontal-axis turbine. The turbine is equipped with a composite rotor with three fixed-pitch blades that rotate at a slow and regular rate (approx. 32 rpm), well below normal water vessel propeller speeds and conventional hydropower turbine blade speeds. The TriFrame mount is the structural mount that holds the three Verdant Power three-bladed horizontal-axis turbines.

16 TIDAL AND WAVE POWER↗