Search NASA⌕ Search

Engineering topics

Copitch, Ethan

Publications and source records attributed to Copitch, Ethan.

(U) MIT Capstone Project (Final Report)

This capstone project focuses on modernizing the design development processes, production development processes, and communication between design agencies (DAs) and production agencies (PAs) to decrease the timeline from conceptual study to first production unit. To focus the scope, the researchers looked only at interactions between the DA, Lawrence Livermore National Lab (LLNL), and the PA, Kansas City National Security Campus (KCNSC). The project’s system problem statement (SPS) is: TO decrease the time from conceptual study to first production unit BY reducing the DA to-PA engineering interface complexity USING digital engineering software that centralizes product definition and information exchange protocols.

42 ENGINEERING↗

(U) MIT Capstone Project Assignment 2: Proposed System Design

“First Production Unit (FPU) in 5”: The National Nuclear Security Administration (NNSA) and upper management at Lawrence Livermore National Lab (LLNL) have set a long-term goal of decreasing the development cycle of new systems to five years or less. The driver is to be able to respond to emerging situations which require new capabilities more quickly. There are numerous approaches to solve the problem, and any single improvement is likely insufficient. We analyzed a variety of possible solutions at varying levels of specificity as shown in Figure 1. We chose to focus our scope on the optimization of existing documentation processes because it is the least likely to add additional risk and can be accomplished with lower investment than other potential solutions.

42 ENGINEERING↗

MIT Capstone Project Assignment 1 - Existing System Design

“FPU in 5”: The National Nuclear Security Administration (NNSA) and upper management at Lawrence Livermore National Lab (LLNL) have informally set a long-term goal of decreasing the development cycle of new systems to five years or less. The driver is to be able to respond to emerging situations which require new capabilities more quickly. There are numerous approaches to solve the problem, and any single improvement is likely insufficient. Our capstone project focuses on modernizing the design development processes, production development processes, and communication between design agencies (DAs) and production agencies (PAs) to decrease the timeline from conceptual study to first production unit. Our project’s system problem statement (SPS) is below: TO decrease the time from conceptual study to first production unit BY centralizing design development, production development, and information exchange USING digital engineering techniques.

42 ENGINEERING↗