DOE OSTI · 1994463
(U) MIT Capstone Project Assignment 2: Proposed System Design
Abstract
“First Production Unit (FPU) in 5”: The National Nuclear Security Administration (NNSA) and upper management at Lawrence Livermore National Lab (LLNL) have set a long-term goal of decreasing the development cycle of new systems to five years or less. The driver is to be able to respond to emerging situations which require new capabilities more quickly. There are numerous approaches to solve the problem, and any single improvement is likely insufficient. We analyzed a variety of possible solutions at varying levels of specificity as shown in Figure 1. We chose to focus our scope on the optimization of existing documentation processes because it is the least likely to add additional risk and can be accomplished with lower investment than other potential solutions.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Thompson, James, Copitch, Ethan, Frick, Shannon, Romero, Ryan. 2023-07-26. (U) MIT Capstone Project Assignment 2: Proposed System Design. https://doi.org/10.2172/1994463. https://searchnasa.com/record/osti%3A1994463/u-mit-capstone-project-assignment-2-proposed-system-design
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.