Solar Energy Zone Market Analysis for the Afton Region of New Mexico

This report examines the commercial viability of the Afton solar energy zone (SEZ) in southern New Mexico based on market conditions in 2022. The Bureau of Land Management may designate a SEZ on federal land to expedite environmental review and permitting for solar energy projects. The purpose of this analysis is to understand whether current market conditions support solar development in the SEZ.

14 SOLAR ENERGY↗

Data Analytics for Residential PV from Permit to Interconnect (Final Technical Report)

The main objective of this research is to provide novel insights into the effects of permitting, inspection, and interconnection (PII) processes on PV system installations—and in particular, into the relationship between PII processes and adoption timelines. This research can then be used to clarify the potential effect of various process changes on reducing PII timelines, customer cancellation rates, and related costs nationwide. NREL completed this research by assembling a data set of distributed, largely residential rooftop solar systems less than 50 kilowatts in size from participating solar installers. NREL produced five publications describing the effects that PII processes can have on adoption timelines nationwide, in addition to publishing an interactive data viewer with five years of PII cycle time data. This tool can be used by stakeholders to identify potential adoption timelines by local government.

14 SOLAR ENERGY↗

Solar Energy Zone Market Analysis for the San Luis Valley Region of Colorado

This report examines the commercial viability of solar energy zones (SEZs) in the San Luis Valley of Colorado ("the Valley") based on market conditions in 2022. The Bureau of Land Management (BLM) may designate a SEZ on federal land to expedite environmental review and permitting for solar energy projects. The purpose of this analysis is to understand whether current market conditions support the need for SEZs in the Valley.

14 SOLAR ENERGY↗

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗

Hydropower Licensing Timeline and Cost Dataset

This dataset provides timeline dates, lengths, project characteristics, license characteristics, and costs of hydropower licensing and relicensing for 107 randomly selected hydropower projects that have been issued licenses since 1 October 2005. Projects included in this dataset were licensed but not necessarily constructed. These data were analyzed and presented in Chapters 3 (timeline data) and 5 (cost data) of the Levine et al. (2021) report

13 HYDRO ENERGY↗

Solar PV Curtailment in Changing Grid and Technological Contexts: Preprint

Solar photovoltaic (PV) systems generate electricity with no marginal costs or emissions. As a result, PV output is almost always prioritized over other fuel sources and delivered to the electric grid. At increasing levels of PV penetration situations arise where PV is curtailed, either because of local supply/demand imbalances or to maintain system flexibility. In 2018, we estimate that about 6.5 million MWh of PV output was curtailed in four key countries: Chile, China, Germany, and the United States. We find that PV curtailment peaks in the spring and fall, when PV output is relatively high but electricity demand is relatively low. Similar to the case of wind, some PV curtailment is attributable to limited transmission capacity connecting sparsely populated solar-heavy regions to load centers.Grid policies generally seek to minimize curtailment because it is viewed as an economic and environmental loss. However, we argue that changing grid and technological contexts warrant new thinking on PV curtailment. In the grid context, as grids integrate more PV and other renewable energy generation, seeking an optimal level of accepted curtailment becomes more efficient than preventing it. In the technological context, emerging technologies such as advanced inverters and low-cost battery storage are making PV systems more flexible. With flexible PV, grid operators can use withheld PV output to provide various non-generation grid services. This withheld PV output is a form of curtailment under prevailing definitions of the term. Hence, policies that aim to minimize curtailment may undercut the ability of grid operators to fully use the emerging capabilities of flexible PV systems. We argue that the changing grid and technological contexts require a re-examination of the curtailment paradigm. We argue that PV output that is withheld to provide grid services is fundamentally different from output that goes unused in response to system constraints. As a result, we propose a more exclusive definition of curtailment as unused PV output rather than the more expansive conventional definition as any reduction in system output from its technical potential. The terminological distinction is more than a question of semantics. Facilitating grid services by withholding PV output may increase the potential value of flexible PV systems to the grid. This shift in thinking may allow grid operators and policymakers to think in terms of PV curtailment management rather than minimization. Effective curtailment management may include policies that increase PV system dispatchability, alternative PV compensation schemes that decouple generator revenue from system output, and policies to increase grid flexibility.

Chile↗

Distributed PV permitting survey responses

In 2019, NREL, in partnership with the Solar Energy Industries Association, developed a survey for PV installers on their experiences with delays and cancelations in the adoption process, including the impacts of permitting and interconnection. This dataset includes the anonymized responses from 147 representatives from 136 solar install companies.

14 SOLAR ENERGY↗

Solar permitting, inspection, and interconnection cycletimes and requirements

Twenty three small-to-large residential, commercial, and industrial PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (SolarTRACE) viewer. This dataset has been reviewed but errors may exist, and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.

14 SOLAR ENERGY↗

Planning for the storm: Considering renewable energy for critical infrastructure resilience

This study uses the renewable energy optimization model to assess three critical facilities in North Carolina. Techno-economic results were then compared to analyses completed for critical facilities in California and New York to assess energy system cost effectiveness. Though solar photovoltaic (PV) arrays are cost-effective across each of the three North Carolina facilities, adopting battery storage to enable PV to operate with existing diesel generators in a hybrid energy system reduces the economic value of the system. This is in contrast to more economically viable systems in California and New York. All of these systems also offer unquantified resilience benefits by extending operation from hours to weeks across the facilities. If decision makers were able to value the resilience benefits offered by each system or utility rate structures were changed to incentivize battery storage during normal operations, it would impact these assessments. Even so, this analysis provides decision makers a key set of cost benchmarks when considering how they might improve resilience at their critical operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Photovoltaic Curtailment Estimates 2018

This databook provides certain data behind figures and tables found in the NREL report "Solar PV Curtailment in Changing Grid and Technological Contexts." These data reflect estimates based on the best available data for solar photovoltaic curtailment.

14 SOLAR ENERGY↗