Abstract

Solar photovoltaic (PV) systems generate electricity with no marginal costs or emissions. As a result, PV output is almost always prioritized over other fuel sources and delivered to the electric grid. At increasing levels of PV penetration situations arise where PV is curtailed, either because of local supply/demand imbalances or to maintain system flexibility. In 2018, we estimate that about 6.5 million MWh of PV output was curtailed in four key countries: Chile, China, Germany, and the United States. We find that PV curtailment peaks in the spring and fall, when PV output is relatively high but electricity demand is relatively low. Similar to the case of wind, some PV curtailment is attributable to limited transmission capacity connecting sparsely populated solar-heavy regions to load centers.Grid policies generally seek to minimize curtailment because it is viewed as an economic and environmental loss. However, we argue that changing grid and technological contexts warrant new thinking on PV curtailment. In the grid context, as grids integrate more PV and other renewable energy generation, seeking an optimal level of accepted curtailment becomes more efficient than preventing it. In the technological context, emerging technologies such as advanced inverters and low-cost battery storage are making PV systems more flexible. With flexible PV, grid operators can use withheld PV output to provide various non-generation grid services. This withheld PV output is a form of curtailment under prevailing definitions of the term. Hence, policies that aim to minimize curtailment may undercut the ability of grid operators to fully use the emerging capabilities of flexible PV systems. We argue that the changing grid and technological contexts require a re-examination of the curtailment paradigm. We argue that PV output that is withheld to provide grid services is fundamentally different from output that goes unused in response to system constraints. As a result, we propose a more exclusive definition of curtailment as unused PV output rather than the more expansive conventional definition as any reduction in system output from its technical potential. The terminological distinction is more than a question of semantics. Facilitating grid services by withholding PV output may increase the potential value of flexible PV systems to the grid. This shift in thinking may allow grid operators and policymakers to think in terms of PV curtailment management rather than minimization. Effective curtailment management may include policies that increase PV system dispatchability, alternative PV compensation schemes that decouple generator revenue from system output, and policies to increase grid flexibility.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

O'Shaughnessy, Eric, Cruce, Jesse, Xu, Kaifeng. 2021-09-29. Solar PV Curtailment in Changing Grid and Technological Contexts: Preprint. https://www.osti.gov/biblio/1823765

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Chile's Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

Chile↗