Full Life Cycle Mach 6 Nozzle Testing at Long Duration
AETC 2022 Full Life Cycle Mach 6 Nozzle Testing at Long Duration Capability Challenge: Langley 8-Foot High Temperature Tunnel (HTT)
Mach 6 Nozzle↗
Engineering topics
Publications and source records attributed to David E. Stark.
AETC 2022 Full Life Cycle Mach 6 Nozzle Testing at Long Duration Capability Challenge: Langley 8-Foot High Temperature Tunnel (HTT)
Explore the source record for details and available documents.