NASA NTRS · 20220014692
Full Life Cycle Mach 6 Nozzle Testing at Long Duration
Abstract
AETC 2022 Full Life Cycle Mach 6 Nozzle Testing at Long Duration Capability Challenge: Langley 8-Foot High Temperature Tunnel (HTT)
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Kimberly Ann Scarberry, David E. Stark, Charles G. Hatfield. 2022-09-28. Full Life Cycle Mach 6 Nozzle Testing at Long Duration. https://ntrs.nasa.gov/citations/20220014692
Cite the original work for its findings. Save a collection to share your selection of sources.