Search NASA⌕ Search

Engineering topics

Douglas, D.

Publications and source records attributed to Douglas, D..

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

DESIGN AND OPTIMIZATION OF AN ERL FOR COOLING EIC HADRON BEAMS

The baseline scheme for hadron beam cooling in the Electron Ion Collider (EIC) calls for Coherent electron Cooling (CeC) of the hadrons with non-magnetized electrons at high energy (150 MeV electrons) and additional cooling via conventional bunched beam cooling using a precooler system. The electron beam parameters for these concepts are at or beyond the current state of the art, with electron bunch charges on the order of 1 nC and average currents on the order of 100 mA and requiring an Energy Recovery Linac (ERL) to produce such beams. Using specifications provided by BNL and JLab, physicists and engineers at Xelera Research are working on a complete design of an ERL system capable of cooling EIC hadrons.

Gulliford, C.↗

Deploying the NASA Meter Class Autonomous Telescope (MCAT) on Ascension Island

NASA has successfully constructed the 1.3m Meter Class Autonomous Telescope (MCAT) facility on Ascension Island in the South Atlantic Ocean. MCAT is an optical telescope designed specifically to collect ground-based data for the statistical characterization of orbital debris ranging from Low Earth Orbit (LEO) through Middle Earth Orbits (MEO) and beyond to Geo Transfer and Geosynchronous Orbits (GTO/GEO). The location of Ascension Island has two distinct advantages. First, the near-equatorial location fills a significant longitudinal gap in the Ground-based Electro-Optical Deep Space Surveillance (GEODSS) network of telescopes, and second, it allows access to objects in Low Inclination Low-Earth Orbits (LILO). The MCAT facility will be controlled by a sophisticated software suite that operates the dome and telescope, assesses sky and weather conditions, conducts all necessary calibrations, defines an observing strategy (as dictated by weather, sky conditions and the observing plan for the night), and carries out the observations. It then reduces the collected data via four primary observing modes ranging from tracking previously cataloged objects to conducting general surveys for detecting uncorrelated debris. Nightly observing plans, as well as the resulting text file of reduced data, will be transferred to and from Ascension, respectively, via a satellite connection. Post-processing occurs at NASA Johnson Space Center. Construction began in September, 2014 with dome and telescope installation occurring in April through early June, 2015. First light was achieved in June, 2015. Acceptance testing, full commissioning, and calibration of this soon-to-be fully autonomous system commenced in summer 2015. The initial characterization of the system from these tests is presented herein.

Lederer, S. M.↗

NASA's Newest Orbital Debris Ground-based Telescope Assets: MCAT and UKIRT

NASA's Orbital Debris Program Office (ODPO) will break ground on Ascension Island in 2014 to build the newest optical (0.30 - 1.06 micrometers) ground-based telescope asset dedicated to the study of orbital debris. The Meter Class Autonomous Telescope (MCAT) is a 1.3m optical telescope designed to track objects in orbits ranging from Low Earth Orbit (LEO) to Geosynchronous Earth Orbit (GEO). Ascension Island is located in the South Atlantic Ocean, offering longitudinal sky coverage not afforded by the Ground-based Electro-Optical Deep Space Surveillance (GEODSS) network. With a fast-tracking dome, a suite of visible wide-band filters, and a time-delay integration (TDI) capable camera, MCAT is capable of multiple observing modes ranging from tracking cataloged debris targets to surveying the overall debris environment. Access to the United Kingdom Infrared Telescope (UKIRT) will extend our spectral coverage into the near- (0.8-5 micrometers) and mid- to far-infrared (8-25 micrometers) regime. UKIRT is a 3.8m telescope located on Mauna Kea on the Big Island of Hawaii. At nearly 14,000-feet and above the atmospheric inversion layer, this is one of the premier astronomical sites in the world and is an ideal setting for an infrared telescope. An unprecedented one-third of this telescope's time has been allocated to collect orbital debris data for NASA's ODPO over a 2-year period. UKIRT has several instruments available to obtain low-resolution spectroscopy in both the near-IR and the mid/far-IR. Infrared spectroscopy is ideal for constraining the material types, albedos and sizes of debris targets, and potentially gaining insight into reddening effects caused by space weathering. In addition, UKIRT will be used to acquire broadband photometric imaging at GEO with the Wide Field Camera (WFCAM) for studying known objects of interest as well as collecting data in survey-mode to discover new targets. Results from the first stage of the debris campaign will be presented. The combination of these ground-based telescope assets will yield spectral coverage ranging from 0.3 - 25 micrmeters, allowing orbital debris to be studied in depth across a wider wavelength range in the visible and IR than ever previously studied by ODPO. Located on opposite sides of the world and in opposite hemispheres, they offer access to nearly the entire GEO belt on any given night, allowing immediate coverage of nearly any time-critical break-up event. By expanding the methods for surveying, detecting, and characterizing orbital debris, we can better model the debris environment and ultimately gain insight into how to mitigate potential collisions for future missions.

Lederer, S. M.↗

Biomass accumulation in hydroponically grown sweetpotato in a controlled environment: a preliminary study

In the development of a plant growth model, the assumptions made and the general equations representing an understanding of plant growth are gradually refined as more information is acquired through experimentation. One such experiment that contributed to sweetpotato model development consisted of measuring biomass accumulation of sweetpotato grown in hydroponic culture in a plant growth chamber. Plants were started from fifteen centimeter long 'TU-82-155' sweetpotato vine cuttings spaced 25 cm apart in each of 18 rectangular growing channels (0.15 by 0.15 by 1.2m) in a system designed to use the nutrient film technique (NFT). Each channel contained four plants. The 3.5m by 5.2m plant growth chamber environmental parameters included an 18h photoperiod, 500 micromoles m-2 s-1 of photosynthetic photon flux (PPF), and a diurnal light/dark temperature of 28 degrees C/22 degrees C. The relative humidity was 80 +/- 5% and the CO2 partial pressure was ambient (350 ppm). The nutrient solution contained in 30L reservoirs was a modified half Hoagland's solution with a 1:2.4 N:K ratio and a pH of 6.2. Solution replenishment occurred when the electrical conductivity (EC) level dropped below 1050. Plants were harvested at 15 days after planting (DAP) and weekly thereafter until day 134. By 57 DAP, stems and fibrous roots had acquired 90% of their total dry biomass, while leaves had reached 84% of their maximum dry biomass. Beginning at 64 DAP dry biomass accumulation in the storage roots dominated the increase in dry biomass for the plants. Dry weight of storage roots at 120 DAP was 165 g/plant or 1.1 kg/m2. Resulting growth curves were consistent with the physiological processes occurring in the plant. Results from this study will be incorporated in a plant growth model for use in conjunction with controlled life support systems for long-term manned space missions.

Biomass↗