DOE OSTI · 1881933
Current Status of the FFA@CEBAF Energy Upgrade Study
Abstract
This work will describe the current status of the FFA@CEBAF energy upgrade feasibility studies. Technical updates are given, but more specific details are left to separate contributions. Specifically, this work will discuss improvements to the FFA arcs, a new recirculating injector proposal, and numerous modifications to the current 12 GeV CEBAF which will be required, such as the spreaders and recombiners architecture, splitters (time-of-flight chicanes), the extraction system, and the hall lines.
Keep this discovery
Explore connections, maps & timelines
Bodenstein, R. M., Benesch, J. F., Bogacz, S. Alex, Coxe, A., Deitrick, K. E., Gamage, B. R., Krafft, G. A., Price, K. E., Roblin, Y., Seryi, A., Berg, J., Brooks, S. J., Trbojevic, D., Douglas, D., Hoffstaetter, G. H., Morozov, V. S.. 2022-07-06. Current Status of the FFA@CEBAF Energy Upgrade Study. https://doi.org/10.18429/jacow-ipac2022-thpost023
Cite the original work for its findings. Save a collection to share your selection of sources.