Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Lab coating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quarter cryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for both cavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc = 7.9 MV/m and the other - 13.3 MV/m at 4 K.
Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Labcoating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quartercryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for bothcavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc =7.9 MV/m and the other - 13.3 MV/m at 4 K
This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024
The program to upgrade CEBAF cryomodules has been implemented to enhance the energy gain of refur-bished cryomodules up to 75 MeV. This strategy in-volves reusing the waveguide end-groups from original CEBAF cavities produced in the 1990s, and existing five elliptical cell cavities are replaced with a new optimized cell shape cavity constructed from large-grain, ingot Nb material. Following fabrication, each cavity undergoes centrifugal barrel polishing and electropolishing and is tested at 2.07 K. Eight cavities are then assembled into "cavity pairs" and tested at 2.07 K before integration into the cryomodule. This paper pre-sents the outcomes of the cavity qualification for the third C75 module, providing a detailed account of the assessment in both a vertical cryostat and the acceptance test results of the cryomodule. Furthermore, efforts have been made to address performance limitations arising from field emission and multipacting
Multipacting (MP) is a phenomenon which can affect stability in particle accelerators and limit performance in superconducting radio frequency cavities. In the TESLA shaped, 1.3 GHz, 9-cell cavities used in the LCLS-II (L2) and LCLS-II-HE (HE) projects, the MP-band (~17-24 MV/m) lies within the required accelerating gradients. For HE, the operating gradient of 20.8 MV/m lies well within the MP-band and cryomodule testing has confirmed that this is an issue. As such, MP processing for the HE cryomodule test program will be discussed. Early results on MP processing in cryomodules installed in the L2 linac will also be presented, demonstrating that the methods used in cryomodule acceptance testing are also successful at conditioning MP in the accelerator and that this processing is preserved in the mid-term.
Molten Salt Reactors (MSRs) are one of the six perspective Generation IV nuclear technologies that should fulfil sustainability, economics, safety, and proliferation resistance goals. In recent years these concepts have attracted increased interest in research as well as in industry. In the context of developing new, innovative technology, a zero-power experiment would be an ideal option for improving the understanding of MSR systems under low-risk and low-cost conditions. The given research was focused on cross-verification of the nuclear codes for MSR modelling and simulations as required for the development of the first design of a potential facility and a draft of an experimental programme. The analysis included the evaluation of lattice and Monte Carlo codes. The study showed that all considered nuclear tools were in good agreement with each other. Although this does not mean the results will match the real experimental data, which is essential for the regulatory approval of a novel technology. Currently, experimental data is almost absent for MSR technology. Hence, a zero power experiment is needed to assure we can rely on modelling and simulation studies for further development of MSR technology and deliver real-world experiments to support the licensing of future MSRs. (authors)
Pressure spikes in the fundamental power coupler waveguide are a significant source of trips during the operation of both original and refurbished superconducting radio-frequency cavities installed in the CEBAF accelerator. In its original configuration, two waveguides from a cavity-pair are connected to a single 32 l/s ion pump. In 2017 a new cavity-pair was installed in a refurbished cryomodule in which a NEXTorr® D200-5 combination ion pump and non-evaporable getter pump was installed for each waveguide. It is shown that hydrogen is the dominant residual gas in the waveguide and simulations with Molflow+ indicated that the new pumping scheme allows reducing the pressure at the end of the waveguide by a factor of ~5 , compared to the original configuration. In conclusion, the new cavity-pair has been operating in CEBAF for a total of 431 days and it only had a total of 3 trips due to vacuum spikes in the waveguide.
The Thomas Jefferson National Accelerator Facility is currently engaged, along with several other Department of Energy (DOE) national laboratories, in the Linac Co-herent Light Source II project (LCLS-II). The SRF Insti-tute at Jefferson Lab is currently building 21 cryomod-ules for this project. The cryomodules are based on the XFEL design and have been modified for continuous wave (CW) operation and to comply with other LCLS-II specifications. Each cryomodule contains eight 9-cell cavities with coaxial power couplers operating at 1.3 GHz. The cryomodule also contain a magnet package that consists of a quadrupole and two correctors. Most of these cryomodules will be tested in the Cryomodule Test Facility (CMTF) at Jefferson Lab before shipment to SLAC. Up to three of these cryomodules will be tested in a test stand set up in the Low Energy Recovery Facility (LERF) at Jefferson Lab. Acceptance testing of the LCLS-II cryomodules began in December 2016. Twelve cryomodules have currently completed Acceptance Test-ing. This paper will summarize the results of those tests.