Search NASA⌕ Search

Engineering topics

Durfee, Justin David

Publications and source records attributed to Durfee, Justin David.

Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

97 MATHEMATICS AND COMPUTING↗

Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

97 MATHEMATICS AND COMPUTING↗

Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

97 MATHEMATICS AND COMPUTING↗

Contingency Contractor Optimization Tool Prototype (Phase 3 Extension- Analyst Tutorial)

This tutorial walks the user through analysis examples using the Contingency Contractor Optimization Tool Prototype. The examples are designed to showcase key capabilities of the tool. The main goal of this tutorial is to provide examples of how to use the tool to perform analyses to those users acting in the analyst role. All examples and locations used in the prototype are fictional, but are intended to be realistic. Users reading this manual are expected to have a basic understanding and familiarity with the Contingency Contractor Optimization Tool Prototype. This tutorial includes scenarios for the occurrence of two wars, Prussia and New Granada.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Contingency Contractor Optimization Engineering Prototype – Release 2.3 (Phase 3 Extension – Training Examples)

This document provides training examples to provide users practice in using the tool. Detailed instructions on how to use the tool can be found in the User Manual (SAND2015-6028).The Contingency Contractor Optimization project is intended to address former Secretary Gates’ mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the CCOT-P engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. CCOT-P uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Contingency Contractor Optimization Phase 3 Extension Quick Start Guide: Contingency Contractor Optimization Tool - Engineering Prototype (Release 2.3)

This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Extension User Manual Contingency: Contractor Optimization Tool - Engineering Prototype (Release 2.3)

This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 User Manual - Contingency Contractor Optimization Tool Prototype - Release 2.2

This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Contingency Contractor Optimization Phase 3 Quick Start Guide Contingency Contractor Optimization Tool Prototype - Release 2.2

This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Contingency Contractor Optimization: Phase 3, Model Description and Formulation

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee↗