Contingency Contractor Optimization Phase 3 User Manual - Contingency Contractor Optimization Tool Prototype - Release 2.2
Abstract
This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Bandlow, Alisa, Adair, Kristin Lynn, Durfee, Justin David, Frazier, Christopher Rawls, Gearhart, Jared Lee, Nozick, Linda Karen. 2015-04-01. Contingency Contractor Optimization Phase 3 User Manual - Contingency Contractor Optimization Tool Prototype - Release 2.2. https://doi.org/10.2172/1494619
Cite the original work for its findings. Save a collection to share your selection of sources.