Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Longitudinal Emittance Measurements at PIP2IT

The PIP-II particle accelerator is a new upgrade to the Fermilab accelerator complex, featuring an 800-MeV H⁻ superconducting linear accelerator that will inject the beam into the present Fermilab Booster. A test accelerator known as PIP-II Injector Test (PIP2IT) has been built to validate the concept of the front-end of PIP-II. One of the paramount challenges of PIP2IT was to demonstrate a low longitudinal emittance at the end of the front end. Having a low longitudinal emittance is crucial in order to ensure the stability of the beam in the accelerator. We present a longitudinal emittance calculation at 14.3 MeV at the SSR1-8 cavity in the High Energy Transport line (HEBT). The signal is collected by a Fast Faraday Cup (FFC) at the end of HEBT and recorded by a high-bandwidth oscilloscope.

43 PARTICLE ACCELERATORS↗

Beam Profile Measurements Utilizing an Amplitude Modulated Pulsed Fiber Laser at PIP2IT

Fermilab is undertaking the development of a new 800 MeV superconducting RF linac to replace its present normal conducting 400 MeV linac. The PIP-II linac consists of a warm front-end generating 2 mA of 2.1 MeV H⁻ followed immediately by a series of superconducting RF cryomodules to 800 MeV. To limit the potential damage to the superconducting RF cavities, PIP-II will utilize laser-based monitors to obtain beam profiles via photoionization. This paper will present the results of transverse and longitudinal beam profile measurements using a prototype profile monitor that was tested with 2.1 MeV H⁻ beam at the PIP-II Injector Test (PIP2IT) accelerator. This prototype profile monitor utilizes a high repetition rate fiber laser and fiber optic transport into the PIP2IT enclosure. In addition, results will be shown of narrow-band electron detection from amplitude modulated laser pulses.

43 PARTICLE ACCELERATORS↗

Bunch Extinction Measurements at PIP-II Injector Test Facility

The PIP2 particle accelerator is a new upgrade to the Fermilab accelerator complex, featuring an 800-MeV H-superconducting linear accelerator that will inject the beam into the present Fermilab Booster. A test accelerator known as PIP-II Injector Test (PIP2IT) has been built to validate the concept of the front-end of such a machine. One of the paramount challenges of PIP2IT was to validate the bunch by bunch chopping system in the Medium Energy Beam Transport (MEBT). This paper aims to present the direct extinction measurements at PIP2IT and their analysis. These measurements have been taken by two Resistive Wall Current Monitors (RWCM) and recorded by a high bandwidth oscilloscope.

43 PARTICLE ACCELERATORS↗