DOE OSTI · 1834186
Bunch Extinction Measurements at PIP-II Injector Test Facility
Abstract
The PIP2 particle accelerator is a new upgrade to the Fermilab accelerator complex, featuring an 800-MeV H-superconducting linear accelerator that will inject the beam into the present Fermilab Booster. A test accelerator known as PIP-II Injector Test (PIP2IT) has been built to validate the concept of the front-end of such a machine. One of the paramount challenges of PIP2IT was to validate the bunch by bunch chopping system in the Medium Energy Beam Transport (MEBT). This paper aims to present the direct extinction measurements at PIP2IT and their analysis. These measurements have been taken by two Resistive Wall Current Monitors (RWCM) and recorded by a high bandwidth oscilloscope.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
El Baz, Mathias, Fellenz, Brian, Scarpine, Victor, Shemyakin, Alexander, Thurman-Keup, Randy. 2021-09-30. Bunch Extinction Measurements at PIP-II Injector Test Facility. https://doi.org/10.18429/jacow-ibic2021-tupp40
Cite the original work for its findings. Save a collection to share your selection of sources.