Search NASA⌕ Search

Engineering topics

Feher, Sandor

Publications and source records attributed to Feher, Sandor.

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗

Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)

This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.

43 PARTICLE ACCELERATORS↗

Experience from the US contribution to HL-LHC: Nb3Sn focusing quadrupoles and SRF crab cavities

The Interaction Regions (IR) of many colliders benefit from the application of leading-edge technologies to ensure the highest possible luminosity delivered to the experiments. Leading-edge low-beta focusing magnets and crab cavities to handle individual bunches are critically important to increase the instantaneous and integrated luminosity in future Colliders.The High-Luminosity LHC Upgrade, HL-LHC, with Nb3Sn Magnets (called MQXF) and Superconducting Radio Frequency (SRF) crab cavities (of two types, called DQW and RFD) is a world-wide collaborative project under construction in this decade to utilize the solutions mentioned above as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC.In this contribution we present the valuable lessons learned by the US efforts in the procurement, construction, and testing phases of the Nb3Sn focusing magnets and SRF crab cavities. We will report on the experience gathered by HL-LHC AUP in the production of the first half of deliverables (magnets MQXFA03 to MQXFA13). We will also report on the test of the first cryoassemblies and the status of the cavities’ development, production and testing.Both the technical and project management lessons-learned will inform applications of these technologies to future colliders and projects.

43 PARTICLE ACCELERATORS↗

Status of MQXFB Quadrupole Magnets for HL-LHC

The MQXFB magnets are superconducting quadrupoles with nominal peak field on the conductor of 11.3 T. With their magnetic length of 7.2 m, they stand as the longest Nb3Sn accelerator magnets designed and manufactured up to now. Together with the companion MQXFA 4.2 m long units, built by the US Accelerator Research Program, they are at the heart of HL-LHC, as they shall replace the inner triplet quadrupoles at either side of the ATLAS and CMS interaction regions of the LHC. This technology has benefited from many years of development, and this specific design was validated with successful short models (MQXFS, 1.2 m long). More recently, several MQXFA magnets were shown to satisfy HL-LHC requirements. In this paper, we report on the cold test results of four MQXFB magnets, focusing on performance, training, behavior after thermal and powering cycles, and field quality. We then provide an update of the overall status, including ongoing verifications of design changes at the level of the coil fabrication.

43 PARTICLE ACCELERATORS↗

Acceptance Criteria Part B: LMQXFA cold mass and cryo-assembly

This document specifies the acceptance criteria for the LMQXFA cold mass and cryoassembly. If all the requirements specified in this document are met, then the U.S. HL-LHC AUP LMQXFA and LQXFA deliverables will be accepted by Please note that the definition of threshold as it is being used by the American contribution is not the same as objective, according to the HL-LHC quality policy.

43 PARTICLE ACCELERATORS↗

Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Application of Distributed Fiber Optic Strain Sensors to LMQXFA Cold Mass Welding

The future High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include the low-beta inner triplets (Q1, Q2a/b, Q3) for two LHC insertion regions. The Q1, Q3 components consist of eight 10 m-long LMQXFA cryo-assemblies fabricated by the HL-LHC Accelerator Upgrade Project. Each LMQXFA Cold mass contains two Nb 3 Sn magnets connected in series. A stainless-steel shell is welded around the two magnets before the insertion into the cryostat. There is a limit on how much coil preload increase induced by the shell welding is allowed. Distributed Rayleigh backscattering fiber optics sensors were used for the first time to obtain a strain map over a wide area of a Nb 3 Sn magnet cold mass shell. Finally, data were collected during welding of the first LMQXFA cold mass and the results confirm that the increase of the coil pole azimuthal pre-stress after welding do not exceed requirements.

43 PARTICLE ACCELERATORS↗

Fabrication of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

Fermilab is fabricating ten full length cold masses for the high-luminosity Large Hadron Collider Accelerator Upgrade Project (HL-LHC AUP). One practice assembly and one pre-series assembly have been completed. Here this paper summarizes the construction details. Topics include incoming inspection, bus assembly, component machining, shell forming, beam tube insertion, bus expansion loop installation, instrumentation installation, electrical testing, heat exchanger installation and final assembly welding. In-process surveys, alignment measurements and testing are presented and explained. Problems encountered during construction and their solutions are discussed.

43 PARTICLE ACCELERATORS↗

Status of the MQXFB Nb 3 Sn Quadrupoles for the HL-LHC

Here, the cold powering test of the first two prototypes of the MQXFB quadrupoles (MQXFBP1, now disassembled, and MQXFBP2), the Nb 3 Sn inner triplet magnets to be installed in the HL-LHC, has validated many features of the design, such as field quality and quench protection, but has found performance limitations. In fact, both magnets showed a similar phenomenology, characterized by reproducible quenches in the straight part inner layer pole turn, with absence of training and limiting the performance at 93% (MQXFBP1) and 98% (MQXFBP2) of the nominal current at 1.9 K, required for HL-LHC operation at 7 TeV. Microstructural inspections of the quenching section of the limiting coil in MQXFBP1 have identified fractured Nb 3 Sn sub-elements in strands located at one specific position of the inner layer pole turn, allowing to determine the precise origin of the performance limitation. In this paper we outline the strategy that has been defined to address the possible sources of performance limitation, namely coil manufacturing, magnet assembly and integration in the cold mass.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Progress in the Development of the Nb 3 Sn MQXFB Quadrupole for the HiLumi Upgrade of the LHC

The high-luminosity upgrade of the Large Hadron Collider (HL-LHC) requires new high field and large-aperture quadrupole magnets for the low-beta inner triplets (MQXF). With a nominal operating gradient of 132.2 T/m in a 150 mm aperture and a conductor peak field of 11.3 T, the new quadrupole magnets are based on Nb 3 Sn superconducting technology. After a series of short models constructed in close collaboration by LARP (LHC Accelerator Research Program) and CERN, the development program is entering in the series production phase with CERN on one side and the US Accelerator Upgrade Project (US-AUP) on the other side assembling and testing full-length magnets. This paper describes the status of the development activities at CERN, in particular on the cold powering test of the first MQFXB prototype and on the construction of the second full scale prototype. Critical operations such as reaction heat treatment, coil impregnation and magnet assembly are discussed. Finally, the plan towards the series production is described.

43 PARTICLE ACCELERATORS↗

Lessons Learned From the Prototypes of the MQXFA Low-Beta Quadrupoles for HL-LHC and Status of Production in the US

With the successful test of the first two pre-series magnets the US HL-LHC Accelerator Upgrade Project has started production of the MQXFA magnets to be used in Q1/Q3 inner triplet elements of the HL-LHC. This good start comes after the test of two prototypes with limited performance, and it demonstrates the importance of learning from past issues. Therefore, in this paper we want to share the most important lessons learned so far, focusing on those which may be more interesting for similar projects. Additionally, we will present the status of MQXFA fabrication in the US.

43 PARTICLE ACCELERATORS↗

An upgraded cryogenic test stand for HL-LHC cryo-assemblies

The Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles has been upgraded to test cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). The test requirements of these new cryo-assemblies required additional capabilities of the test stand cryogenic system, including controlled cool-down and warm-up, helium recovery after a quench, and operation at higher pressures. Most of these upgrades were completed to support a zero-magnet test in late 2020, with the remainder of the upgrades completed to support the first pre-series cryo-assembly test in early 2022. An overview of the design and initial operating experience of the upgraded test stand cryogenic system and associated process controls system are presented in this paper.

Rabehl, Roger J.↗

US HL-LHC Accelerator Upgrade Project, Acceptance Criteria Part A: MQXFA Magnet

This document specifies the functional requirements for the MQXFA magnet readapted for the American contribution. If all the requirements specified in this document are met, then the U.S. HL-LHC AUP MQXFA deliverables will be accepted by CERN for the HL-LHC project. Another separate document will be issued by the American contribution for the MQXFA cold mass functional requirements. Please note that the definition of threshold as it is being used by the American contribution is not the same as objective, according to the HL-LHC quality policy.

42 ENGINEERING↗

Design and Fabrication of the Mu2e Cryogenic Distribution System

The muon-to-electron conversion (Mu2e) experiment at Fermilab will be used to search for the charged lepton flavor-violating conversion of muons to electrons in the field of an atomic nucleus. The Mu2e experiment is currently in the design and construction stage and is expected to begin operations in 2022. The Mu2e experiment uses four large superconducting solenoid magnets including a Production Solenoid (PS), an Upstream and Downstream Transport Solenoid (TSu and TSd) and a Detector Solenoid (DS). This paper will focus on the cryogenic distribution system for these four solenoid magnets. Liquid helium will be supplied from two re-purposed Tevatron satellite refrigerators. A large cryogenic distribution box (DB) is located in the Mu2e building to distribute the required cryogens to each of the four solenoid magnets. Each solenoid magnet will have a dedicated transfer line and cryogenic feed box (FB). The solenoid magnets each require two liquid helium circuits and two liquid nitrogen circuits. The most unique feature about this cryogenic system is that the assemblies for the start of the superconducting portion of the power leads are mounted in feed boxes that are in the range of 23 m to 31 m away from the solenoid magnets. The cryogenic feed boxes are located remotely to provide protection from radiation damage and high magnetic fields. The power leads are NbTi superconducting cable stabilized with high conductivity aluminum. The 6061-T6 aluminum grade was selected for the transfer line piping so that the piping would thermally contract at the same rate as the power lead. A major concern for this transfer line is that a small helium leak could create an electric discharge arc due to the Paschen effect. This paper includes a description of the design features and testing done to ensure that the power leads are protected from the Paschen effect while still being adequately cooled to liquid helium temperatures.

43 PARTICLE ACCELERATORS↗